Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.5 CrAdmitted-Finance PLOT NO 603 BOMIKHAL BHUBANESWAR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | L1 | Admitted-Finance | ||
| 2 | L2₹52.7 Cr+₹4.2 Cr (8.56%)Admitted-Finance AT PO LADUGAON DIST KALAHANDI ODISHA | LADUGAON | KALAHANDI | ODISHA | 766019 | L2 | Admitted-Finance | ||
| 3 | L3₹82.6 Cr+₹34.1 Cr (70.3%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹42.4 Cr
Closing Date
9 Sept 2022, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANAGING DIRECTOR OF OCC LTD.
OCC LTD, UNIT - 8, GOPABANDHU NAGAR, BBSR - 751012
Execution of Earth Dam from RD 1610 Mtr to RD 1950 Mtr of Kanupur Irrigation Project (River Gap Closing).
2022_OCCL_80620_1
e-procurement Notice No-13/OCCL/2022-23 (on-line)
Open Tender
Civil Works - Others
Percentage
365 days
KANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Exempted
CONFERENCE HALL OF OCC LTD.
19 Sept 2022
20 Aug 2022
12 Sept 2022
20 Aug 2022
9 Sept 2022
20 Aug 2022
20 Aug 2022 - 29 Aug 2022
30 Aug 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 89,781.93 | Sqm | 8 | ₹7,18,255.44 |
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification including cost of all incidental charges etc.complete as directed by the Engineer in-charge. | 1,03,503.94 | Cum | 46.9 | ₹48,54,334.79 |
| 3 | Earthwork in Excavation, loading and carriage by mechanical means in D.I. rock, laterite and soft rock not requiring blasting interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads and lifts complete and as per the direction of Engineer-in-charge including stacking of useful materials as directed by the Engineer-in-Charge. | 96,617.2 | Cum | 60.4 | ₹58,35,678.88 |
| 4 | Excavation of hard rock of all toughness in canal and cutoff trench of earth dam and other deep cutting sections by mechanical drilling and appropriate blasting with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard as directed by Engineer-in-charge and trimming of bed and slope to the design finished section by manually, if necessary complete. (Recovery of useful materials of all sizes will normally be 0.7 cum per cum of excavation measured in dump condition. In case of change of recovery due to rock condition, percentage is to be fixed by Chief Engineer-in-charge) and as per the direction of Engineer-in-charge including stacking of useful materials as directed by the Engineer-in-Charge. | 9,138.49 | Cum | 232.8 | ₹21,27,440.47 |
| 5 | Clearance of slush & muck from foundation pit by manual means including removal of debris with all leads & lifts including all labour and supervision charges, mobilization, demobilization, all taxes, royalities etc. all complete as per direction of the Engineer-in-charge . | 68,250 | Cum | 249.9 | ₹1,70,55,675 |
| 6 | Dewatering of foundation by 50HP Pump with all leads, lifts and de-lifts including supplying and maintenance of equipments, T&P materials, fuel cost, lubricant cost ,construction of Plat form etc., all labour and supervision charges, mobilization, demobilization, all taxes, royalities etc. all complete as per direction of the Engineer-in-charge . | 2,500 | KWH | 1,000.2 | ₹25,00,500 |
| 7 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into & transportation by mechanical means and unloading the soil within initial lead of 10 km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm layers to make ready for watering and compaction with sheep foot vibro rollers and drozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul roads and borrow area etc. including royalty etc. complete as directed by the Engineer-in-charge.(Measurement of the fill to be taken on the finished compacted section under OMC condition). | 13,89,377.69 | Cum | 137.8 | ₹19,14,56,245.68 |
| 8 | Watering earth work upto O.M.C. condition & compaction by Vibratory rollers & dozers in layers not exceeding 22.5 cm to required density including hire & running charges of all the mechinaries includingall incidental charges etc. complete as per the direction of the Enginer-in-charge.(Measuring to be taken on the finished compacted section of the fill under OMC condition). | 14,14,308.29 | Cum | 18.9 | ₹2,67,30,426.68 |
| 9 | Earth work in Lip cutting to proper profile in bed slope & berms of Dam by manual means and putting the earth on the top of the Dam on properly prepared & scientifically approved surface and spreading & levelling the earth in 22.5 cm layers with all leads and lifts including rough dressing to make ready for watering and compaction including all incidental charges etc. complete as directed by the Engineer-in-Charge. | 24,918.69 | Cum | 210.9 | ₹52,55,351.72 |
| 10 | Supplying and filling sand of approved specification in vertical chimney to proper line & level using removable sheets metal separators with all leads, lifts up to design height of filter chimney including transportation of material with all leads and lifts complete. as directed by the Engineer-in-charge. | 24,930.6 | Cum | 784.6 | ₹1,95,60,548.76 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
DTCN.pdf
Tender Documents • 6.30 MB
BOQ_408181.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .