| 1 | L1₹4.9 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.5 LRejected-Finance | ₹6.5 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 | SC ENGINEERING SERVICE L2 |
|---|---|---|---|---|---|
| 1.00TSU Switch. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Dismantling the coil from core for weighment | 1 | L.S | 1,500 ₹1,500 | 5,000 ₹5,000 |
| 1.02 | Gaskets, nut bolts and other hardware items | 1 | L.S | 700 ₹700 | 7,000 ₹7,000 |
| 1.03 | Silver Brazing Electrode ,D.A/ oxygen Dove tail | 1 | L.S | 2,000 ₹2,000 | 12,000 ₹12,000 |
| 1.04 | Fitting of reformed coils in the limbs with required insulation and necessary coil connection. | 1 | L.S | 2,000 ₹2,000 | 4,690 ₹4,690 |
| 1.05 | Assembling of Transwitch | 1 | L.S | 850 ₹850 | 7,000 ₹7,000 |
| 1.06 | Drying of transformer at recommended temperature and testing | 1 | L.S | 780 ₹780 | 4,000 ₹4,000 |
| 1.07 | Cleaning & De-carbonization of old primary conductor | 1 | L.S | 1,700 ₹1,700 | 18,000 ₹18,000 |
| 1.08 | Cleaning & de-carbonization of old secondary conductors | 1 | L.S | 2,650 ₹2,650 | 22,000 ₹22,000 |
| 1.09 | Providing of EL grade new conductor for Primary side | 240 | Kg | 500 ₹1.2 L | 980 ₹2.4 L |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
23 Mar 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Complete Repairing of 315KVA, 6.6kV/550V TSU with its Primary and secondary switch Under Khottadih Colliery, Pandaveswar Area
2026_ECL_356584_1
GM-PND/EandM/25-26/341/1812 dated 12/03/2026
Open Tender
Electrical and Maintenance Works
30 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,200
16 Apr 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
13 Mar 2026 - 16 Mar 2026
TSU Switch. (Inclusive of EPF/CMPF)
Dismantling the coil from core for weighment
Gaskets, nut bolts and other hardware items
Silver Brazing Electrode ,D.A/ oxygen Dove tail
Fitting of reformed coils in the limbs with required insulation and necessary coil connection.
Assembling of Transwitch
Drying of transformer at recommended temperature and testing
Cleaning & De-carbonization of old primary conductor
Cleaning & de-carbonization of old secondary conductors
Providing of EL grade new conductor for Primary side
Providing of EL grade new conductor for Secondary side
Reinsulation of old Primary conductor with DGC/Numex insulation with class -F materials
Reinsulation of old secondary conductor with DGC/Numex insulation with class -F materials
Reformation of primary coils as per orginal shape with class-F borad glass fiber moulded cylinder of heavy sec,plan spacers
Reformation of secondary coils as per orginal shape with class-F borad glass fiber moulded cylinder of heavy sec,plan spacers-
Thinner and varnish inculding baking drying out at recommended temperature
Less Scrap value
Overhead & Supervision Cost @ 10% on above
Primary Switch. (Inclusive of EPF/CMPF)
Supply of tripping system inculuding shunt trip assembly with spares
Supply of Bottle contact
Supply of Bottle holder
Arc-Chute (Separator)
Earth leakage relay
Overload assembly
Reconditioning of isolator
Complete auxiliary wiring (110V) with supply of 2.5sq mm single core copper wire connectors, bakelite fuse base with career
Supply of H.T fuse (400A)
Ampere meter
Supply and fitting of potential transformer
Volt meter
Cost of hardware materials (nut-bolts,washer)
Overhead profit 10%
Transportation
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_369438.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_369438.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid