Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.7 LAccepted-AOC RHODE S KHANCHA CORNER RAJMAHAL ROAD VADODARA 390001 | VADODARA | VADODARA | GUJARAT | 390001 | L1 | Accepted-AOC L1 |
Tender Value
₹58.3 L
EMD Value
₹1.2 L
Closing Date
27 Jan 2020, 5:30 pmClosed
Senior Manager Engg E
Senior Manager Engg E AAI Mangaluru International Airport
Supply and Replacement of Copper tubes Lubricating oil for Chiller Make McQuay and model Single Screw Water Cooled Chiller PFS330.3 capacity 4x300 TR Chillers installed at Mangaluru International Airport.
2019_AAI_39197_1
AAI/ML/ENGG (E)/SM (E)/ NIT-07/2019
Open Tender
Electrical Works
Item Rate
120 days
Mangaluru
As per NIT
6 documents required · 6 mandatory
₹1,120
Airports Authority Of India
₹1.2 L
9 Mar 2020
1 Jan 2020
4 Feb 2020
1 Jan 2020
27 Jan 2020
1 Jan 2020
1 Jan 2020 - 27 Jan 2020
Amount
Supply of integrally finned high efficiency copper/copper alloy tubes suitable for condenser of Mc Quay make Single Screw Water Cooled Chiller of model PFS330.3 with nominal diameter of 19mm complete as per OEM specifications. (Contractor shall visit the site and physically verify the size of the tube for suitability before supplying)
Supply of Lube Oil Grade :Mobile EAL Arctic ISO 68# Lubricant or equivalent approved by OEM.
Supply of Refrigerant Gas HCFC-134 a or equivalent approved by OEM.
Supply of Oil filters (9 Nos. of filters/chiller), drier cores (3 Nos. of cores/chiller) and Gasket Set suitable for chiller of make Mc Quay and model Single Screw Water Cooled Chiller PFS330.3
Labour for removing the existing copper tubes from the condenser and fitting with new copper tubes complete as required. The removed copper tubes shall be handed over to AAI.
Labour for recovery of existing refrigerant gas and lube oil, pressure testing with Nitrogen gas, minor repairs like arresting of any minor oil/gas leakages, carrying out vacuum test, replacing of oil filters and drier core, filling up with lube oil and charging of refrigerant gas, testing and commissioning of chillers complete as per OEM recommendations and as per the instructions of Engineer-in- Charge as required. Necessary cylinders/containers for storing of refrigerant and lube oil removed from the chillers shall be arranged by the contractor.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .