Loading…
Loading…
Tender Value
₹42.4 L
EMD Value
₹1.1 L
Closing Date
11 Dec 2025, 10:30 pmClosed
Directorate of Municipal Administration
CONSTRUCTION OF VEERA RANI KITTUR CHENNAMMAJI SAMUDAYA BHAVAN IN NARAGUND TOWN
DMA/2025-26/BD/WORK_INDENT52214
DMA/2025-26/BD/WORK_INDENT52214
Open
Buildings
Electronic Documents, First(One Cover)
DMA Town Municipal Council Nargunda
₹1,060
₹1.1 L
3 Dec 2025
3 Dec 2025
9 Dec 2025
CONSTRUCTION OF VEERA RANI KITTUR CHENNAMMAJI SAMUDAYA BHAVAN IN NARAGUND TOWN
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment.
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Driven Pre-Cast Piles - Driven precast vertical M35 grade R.C.C. Piles excluding Reinforcement complete as per Drawing and & Technical Specification - Pile Diameter = 500 m...
Mechanical Means -
Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all mater...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each deposited layer ...
Percentage Additionalities for Formwork
Centering & Scaffolding.Foundation upto Plinth a. Isolated 8%
Percentage Additionalities for Formwork,
Centering & Scaffolding. RCC Columns / Shaft (Slip Centering) 70%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .