Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
21 Jul 2023, 4:00 pmClosed
Executive engineer FCD Samba
Executive engineer FCD Samba
Restoration Repair Reconstruction of flood protection work at various spots of River Basantar and its tributaries as per necessity of site requirement under MR UT Capex Budget PRI and District Capex
2023_IFC_220810_3
short term fresh enit no 03 of 07/2023
Open Tender
Civil Works
Item Rate
Samba
as per SBD
2 documents required · 2 mandatory
₹500
Executive engineer FCD Samba
₹24,000
25 Jul 2023
11 Jul 2023
22 Jul 2023
11 Jul 2023
21 Jul 2023
11 Jul 2023
Amount
Dismantling old protection work including cutting of crates and stacking of stones.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil (rolling and watering not included)
Supply of labour for all sorts of works as per requirements for the item work not in the purview of SSR of 2022
Hand-packing stones in wire-crates; excluding cost of crates and stones
Tipping of stone filled crates wired in position including equipment charges
Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates
Dry stone pitching (any thickness) excluding cost of stones ( hortizontal)
Dry stone pitching (any thickness) excluding cost of stones ( On slopes)
Supply of stones
Carriage of Stones avg 35 Km by MT
Carriage of earth avg 5Km by MT
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m
Supply of empty cement bags
Filling of empty cement bags with sand/earth including cost of sewing and strings excluding cost of bags and earth/sand
Loading/ unloading of sand/earth filled bags in lorries lead upto 50 m
Placing of bags filled with earth/sand in dry
Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.50mx1.50m with lids (15cm x 15cm Mesh)
Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.20mx1.20m with lids (15cm x 15cm Mesh)
Supply of Gabbion Knitted crates of size (6.0x1.5x1.5) M, Mechanically Woven Double Twisted Hexagonal wire Mesh Gabions type zinc coated Mesh type: 100mm x 120 mm mesh wire Dia 2.70mm salvage wire Dia 3.40 mm lacing wire dia 2.20mm
Supply of Gabbion knitted crates of size (6.0x1.0x1.0) M, Mechanically Woven Double Twisted Hexagonal wire Mesh Gabions type zinc coated Mesh type: 100mm x 120 mm mesh wire Dia 2.70mm salvage wire Dia 3.40 mm lacing wire dia 2.20mm
Supply of G.I. Wire for Gabion
Supply of B.A. Wire
Mohd Arif Malik Contractor
M/S TALBIR SINGH GOVT CONTRACTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .