Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAccepted-AOC | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹32.3 L+₹5.4 L (19.9%)Rejected-Finance | L2 | Rejected-Finance Other than lowest tenderer | |
| 3 | L3₹35.4 L+₹8.4 L (31.2%)Rejected-Finance | L3 | Rejected-Finance Other than lowest tenderer | |
| 4 | L4₹36.1 L+₹9.1 L (33.9%)Rejected-Finance | L4 | Rejected-Finance Other than lowest tenderer | |
| 5 | L5₹36.4 L+₹9.4 L (34.9%)Rejected-Finance | L5 | Rejected-Finance Other than lowest tenderer |
Tender Value
₹39.5 L
EMD Value
₹79,000
Closing Date
16 Dec 2019, 6:00 pmClosed
GARRISON ENGINEER (SOUTH) BANGALORE
GARRISON ENGINEER (SOUTH) BANGALORE NO 1, ULSOOR ROAD BANGALORE-560 042
AS PER BOQ AND TENDER DOCUMENT
2019_MES_291512_2
GE(S)/B/8353/E8
Open Tender
Civil Works
Item Rate
330 days
BANGALORE
AS PER TENDER DOCUMENT
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER (SOUTH) BANGALORE
₹79,000
Yes
17 Apr 2020
28 Nov 2019
17 Dec 2019
28 Nov 2019
16 Dec 2019
7 Dec 2019
28 Nov 2019 - 3 Dec 2019
Amount
Out sourcing of operation and maintenance of electric supply installation and water supply installation at DAD/DCA power house and pump house by one electrician and one FGM in three shifts per day round the clock from 0600 hours to next day 0600 hours in three shifts per day and night (i.e. 8 hours per shift) including saturady, sunday and holidays consisting of (i) Transformer 400KVA -01 Nos (ii) Transformer 200KVA - 02 Nos (iii) 4 Pole Structure - 01 Nos (iv) 2 Pole structure -02 Nos (v) Load Break Switch - 01 Nos (vi) Air Circuit Breaker - 02 Nos (vii) Diesel Engine Set 35 KVA - 01 Nos (viii) Centrifugal Pump set 25 HP - 02 Nos (ix) Centrifugal Pump 12.5 HP - 01 Nos (x) Chlorination Plant (xi) Deisel pump set 7.5 HP -01 Nos (xii) Deisel pump Set 5HP -01 Nos (xiii) Non clogging centrifugal pumpset 15 HP - 01 Nos complete all as specified and as directed.
Out sourcing of Operation and Maintenance of Electric Supply Installation and Water Supply Installation at PRTC Tornagallu power house and pump house by one electrician and one FGM in two shifts per day from 0600 hours to 2200 hours (i.e. 8 hours per shift) including saturady, sunday and holidays consisting of (i) 11 KV HT take over point with Transformer 100 KVA capacity -01 Nos (ii) Load Break Switch - 01 Nos (iii) Diesel Engine set 15 KVA -01 Nos (iv) Centrifugal Pumpset 5HP -02 Nos (v) Gate valve 50mm - 10Nos complete all as specified and directed. Note for Item No 1 & 2 :- (i) The quoted rate shall deemed to include maintenance of necessary records / log sheets and documents including removing grass/surface dressing from surrounding area of Electric/Water supply installation at an interval of fortnightly ie twice in a month to cleaning the power house & pump house area and to provide jute for cleaning the pumpsets, broom for cleaning and removing the spider nets from the bottom and corner of the roof/wall of installation. The contractor operator is responsible to clean inside/out side installation by broom daily basis including bathroom by phenoil to make sure cleanliness of installation and to maintain hygine sanitation complete all as directed. (ii) In case of requirement, tradesmen provided for one area may be utilized in other areas at the discretion of the department without any extra cost to department as directed by Engineer-in-Charge. (iii) Rate quoted is deemed to be included for leave reserve/off of the staff employed. (iv) The rate quoted shall be deemed to include the cost of uniform for tradesmen employed indicating the name of individual and the firm. (v) The rate quoted shall be deemed to be included for providing Log Books & Stationery for all above mentioned installations. (vi) The necessary Tools & Plants shall be provided by the contractor. (vii) Group insurance for the operators shall be made by the contractor. (viii) Contractor shall pay the wages to the workman through individual bank account only and documentary proof shall be submiited to the Engineer-in-Charge. (ix) The duties/performance of trademen/workmen shall be checked and ensured by the contractor time to time and the Contractor shall be fully responsible for efficient functioning of services.
Pacific Enterprises
M.G. Enterprises
mahadevi Enterprises
M/S Anu Enterprises
RAHUL ENTERPRISES
SREE VARU ELECTRICALS
Srisrinivasaenterprises
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .