Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.9 Cr
EMD Value
₹21.6 L
Closing Date
26 Nov 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE Jaunpur-Ghazipur Circle, PWD, Jaunpur
Widening Streinthening of Ramsinghpur to Sikhadi (ODR) Road in Distt Ghazipur (5 year maintenance work)
2026_CEUVZ_1207636_1
5208/SETender/jnp-gzp circle/26 Date-13-10-2026
Open Tender
Civil Works
Percentage
300 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹21.6 L
Yes
SE Jaunpur-Ghazipur Circle, PWD, Jaunpur
26 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
12 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m ( Including all material & T&P etc. complete. & Excluding cost of GST) | 1,942.77 | Cum | 56 | ₹1,08,795.12 |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. ( Including all material & T&P etc. complete. & Excluding cost of GST) | 1,435 | Cum | 60 | ₹86,100 |
| 3 | Construction of embankment with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. without lead.( Including all material & T&P etc. complete. & Excluding cost of GST) | 16,905.6 | Cum | 116 | ₹19,61,049.6 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 ( Including all material & T&P etc. complete. & Excluding cost of GST) | 1,731.25 | Cum | 3,280 | ₹56,78,500 |
| 5 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with 4% portland cement with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer with paver as cemented base on sub base/subgrade( modified soil) and compacting with the road roller to achieve unconfined compressive strength as specified by Engr-in-charge ( Including all material & T&P etc. complete. & Excluding cost of GST) | 2,607.34 | cum | 3,807 | ₹99,26,143.38 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) ( Including all material & T&P etc. complete. & Excluding cost of GST) | 1,409.38 | cum | 3,508 | ₹49,44,105.04 |
| 7 | Providing and laying prime coat with bitumin emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 Kg/ Sqm. using mechanical means as per Technical specification clause 502(1). | 14,093.75 | sqm | 62 | ₹8,73,812.5 |
| 8 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects ( Including all material & T&P etc. complete. & Excluding cost of GST) | 563.75 | Cum | 16,653 | ₹93,88,128.75 |
| 9 | Providing and Laying of Rubber moulded (Red Colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504.Rate As per SOR ( Including all material & T&P etc. complete. & Excluding cost of GST) | 1,200 | sqm | 850 | ₹10,20,000 |
| 10 | P/L hot applied thermoplastic compund 2.5 mm thick including reflectionsing glass beads @ 250 gms per sqm area thickness of 2.5 mm is exculusive of suraface applied gllass beads as per IRC:35 the finished surface to be level uniform and free from | 529.7 | sqm | 580 | ₹3,07,226 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
Tendernotice_2.pdf
PDF • 1.41 MB
Tendernotice_3.pdf
PDF • 0.28 MB
BOQ_2291237.xls
BOQ • 0.28 MB
5848pdgzp.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .