| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GUHANSANJEEVI ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Clearing Light jungle | 90,840 | M2 | 5 ₹4,54,200 Lowest |
| 2.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 66 | Loc | 1,900 ₹1,25,400 Lowest |
| 3.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(In Hard gravelly soil) | 2,787 | cum | 110 ₹3,06,570 Lowest |
| 4.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Soft disintegrated rock not requiring blasting) | 836 | cum | 158 ₹1,32,088 Lowest |
| 5.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete (MR and DMR requiring blasting) | 558 | cum | 280 ₹1,56,240 Lowest |
| 6.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock requiring and blasting) | 836 | cum | 600 ₹5,01,600 Lowest |
| 7.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete ( Hard rock wedging and chiselling ) | 557 | cum | 1,200 ₹6,68,400 Lowest |
| 8.00 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete | 168 | hrs. | 450 ₹75,600 Lowest |
| 9.00 | Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site. | 4,604 | Sqm. | 150 ₹6,90,600 Lowest |
| 10.00 | Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For GCR type tower | 27 | Loc | 8,000 ₹2,16,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹7.0 L
Closing Date
7 Sept 2022, 2:30 pmClosed
CE/TP-I/CHN
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Earthwork Excavation, Stub setting, Concreting, Supply, Transport and erection of 110KV DC towers, supply transport and stringing of 3nos of panther conductor and 1no.Earthwire from Uddanapalli 230/110KV SS to the proposed Belur 110/33KV SS.
2022_EB_248670_1
TP1-084/22-23
Open Tender
Civil Works
Works
120 days
BELUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7.0 L
Yes
7 Oct 2022
25 Aug 2022
8 Sept 2022
25 Aug 2022
7 Sept 2022
25 Aug 2022
Amount
Clearing Light jungle
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(In Hard gravelly soil)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Soft disintegrated rock not requiring blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete (MR and DMR requiring blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock requiring and blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete ( Hard rock wedging and chiselling )
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For GCR type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For HCR type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KCR type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KC(O) type tower
PCC 1:3:6, using 20mm HBG metal for tower foundation without formwork but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete.
PCC 1:2:4 using 20mm metal for foundation with formwork including cost of all materials lead lift etc complete.
RCC 1:1.5:3, using 12 to 20mm HBG metal for revement raft with form work including cost of cement all materials labour, lead, lift etc., complete. As directed by the Engineer at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For GCR (Dry)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For GCR (Wet)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For HCR (Dry)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For HCR (Wet)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For KCR (Dry)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For KCR (Wet)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For KC(O) (Wet)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For DP (Wet)
Supplying and filling with gravel in approach road in layers not more than 15 cm thick well rammed and watered consolidated etc including cost of all materials lead lift labour etc complete as per the direction of site engineer.
Supply and labour charges for providing pipe type earthing of tower with G.I earth pipe 40mm dia and earth strips lead, lift, etc, complete.
Providing Special type earthing arrangements for Teriminal tower including necessary excavation for fixing 3m long 100mm dia CI class pipe, 60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect with the leg of the stub with 50x10mm MS flat and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
Removal of excess excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Labour charges for Erection of various tower including sorting out of tower parts at Site,unloading at site, erection of towers, tightening and punching of bolts &nuts if neccessary for final checking, including all lead, lift, labour etc. Complete including charges & rectification of tower parts if any including Tools & Plants all labour lead, lift, adhering to all safety norms, etc complete.
Supplying and fabiraction for sorting out, cutting, drilling, and fabiraction welding, bolting and nutting assembling and erection including aligning in poisition of DP structure including cost of labour, lead lift etc complete and priming coat and painting two coats.
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete .
Plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour etc., complete.
Cutting and felling of Big size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Cutting and felling of Small size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transporting and hoisting of 2X 8 units of 120 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transport of 3 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Kms
Labour charges for transport of 3 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Span
Labour charges for transport of 6 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Span under LC Condition
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. For Kms
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. For Span
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. For Span Under LC Condition, NH crossings
Labour charges for fixing of number plates, danger board, phase plate including all cost of materials, abour transport, lead, lift, etc complete
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Arranging and availing line clear in HT/LT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT/ LT, lines earthing lead, lift, T&P etc., complete.
Providing special trussels for Road crossing including cost of all materials, labour, lead lift etc. Complete.
Providing Loop jumpers and removal of the same after commissioning of the 110 line including cost of all materials, labour lead llift T&P etc complete
Releasing, lowering of existing 8 Nos. tension insulator with fittings and Rehoisting after completion of new line stringing including all labour,transport lead, lifts, T&P, etc complete.
Releasing lowering and restringing of exsiting 6 Nos of Panther conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC Condition,
Labour charges for releasing, Lowering and restringing of existing 1 No of7/3.55mm GI earthwire including lead, lift, labour and cost of T&P etc complete. Under LC Condition
Supply,Transport and fixing of Single tension fittings for panther
Supply, Transport and fixing of Double tension fittings for panther
Supply, Transport and fixing of Single Suspension fittings for panther
Supply, Transport and fixing of SB Vibration Damper for panther
Supply,Transport and fixing of PA rod for panther conductor
Supply, Transport and fixing of Aluminium earth bond for earthwire
Supply, Transport and fixing of single Suspension fittings for earth wire 7/3.55
Supply, Transport and fixing of single tension fittings for earth wire 7/3.55
Supply,Transport and fixing of MID span joint for panther
Supply, Transport and fixing of MID span joint for Earthwire
Supply,Transport and fixing of Repair sleeve for panther
Supply,Transport and fixing of number plate as directed by the Engineer in charge of the work including all labour etc., complete
Supply,Transport and fixing of Phase plates(set of three) as directed by the Engineer in charge of the work including all labour etc., complete
Supply,Transport and fixing of Danger boards as directed by the Engineer in charge of the work including all labour etc., complete
Supply,Transport and fixing of PG clamp
Supply,Transport and fixing of 16mm dia U bolt and nuts/Hanger/eye bolts for panther
Supply,Transport and fixing of D Shackle for panther
Supplying, Transportation, fabrication, galvanising of standard MS towers parts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer.
Supplying, Transportation, fabrication, galvanising of standard Bolts and nuts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer
Supply of line materials as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. ACSR Panther conductor
Supply of line materials as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. 7/3.55mm GI earthwire
Supply of line materials as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. 90 KN Insulator
Supply of line materials as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. 120 KN Insulator
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .