Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | -1.51% | ₹9.8 L | L1 | Admitted-Finance |
Tender Value
₹10.0 L
EMD Value
₹19,960
Closing Date
17 Aug 2026, 12:00 pmClosed
Commissioner
Municipal Council Deeg
Construction of a drain from Delhi Darwaza to the fort on both sides and in Ward No. 35
2026_DLB_587467_9
Enit 15 Nirman
Open Tender
Civil Works
Percentage
15 days
deeg
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
commissioner
₹19,960
Yes
18 Aug 2026
14 Aug 2026
17 Aug 2026
14 Aug 2026
17 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | - | CUM | 229.5 | - |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking Earth lead upto 2km. | - | CUM | 176.17 | - |
| 3 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material | - | CUM | 1,360 | - |
| 4 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | CUM | 4,575 | - |
| 5 | Brick work with FPS bricks of class designation 75 in foundation
and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | 5,400 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | CUM | 5,910 | - |
| 7 | A | 1 | CUM | 5,910 | ₹5,904.09 |
| 8 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | - | SQM | 315.5 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1044939.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .