Loading…
Loading…
Tender Value
₹31.3 L
EMD Value
₹62,620
Closing Date
20 Jul 2026, 4:00 pm
Executive Engineer RNB Division Pulwama
Executive Engineer RNB Division Pulwama
Washroom Block for Female and Special Abled students GDC Rajpora
2026_PWDJK_315102_1
57/EEP/RNB/of 2026-2027/3151-61 dt.08.07.2026
Open Tender
Civil Works
120 days
Pulwama
as per nit
3 documents required · 3 mandatory
₹1,100
Bearing No 0470010200000099
₹62,620
8 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, etc including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and its disposal All kinds of soil. | - | Cum | - | - |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | - | Cum | - | - |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | - | cum | 1 | - |
| 4 | Providing and laying in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | - | cum | - | - |
| 5 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand crushed stone agg. 20mm) | 1 | cum | - | - |
| 6 | Reinforced cement conc. Work in beams, suspended floors roofs having slope upto 15 deg. Landing balconies, shelves, lintels upto floor 5 level excld. Centring, shuttering in 1:1.5:3 20mm stone agg. Nominal size | - | cum | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | kgs | 1 | ₹1 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 1 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | - | sqm | 1 | - |
| 10 | Centring and shuttering incld. Strutting, proping etc & removal of form work for edges of slabs and brakes in floors and walls (under 20 cm wide) | 1 | rm | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1021101.xls
BOQ • 0.80 MB
Download all tender documents and submit your bid