Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹24.8 L |
Tender Value
₹24.8 L
EMD Value
₹50,000
Closing Date
9 Feb 2026, 5:00 pmClosed
VIJAY SHIL GAUTAM (EXECUTIVE OFFICER NAGAR PARISHAD JAMALPUR)
EXECUTIVE OFFICER NAGAR PARISHAD JAMALPUR
OFFICE NAGAR PARISHAD JAMALPUR
VIJAY SHIL GAUTAM (EXECUTIVE OFFICER, JAMALPUR)
EXECUTIVE OFFICER JAMALPUR
Construction of step Ghat near Kali Pahari River Under NP J amalur, Dist-Munger
124478
E-TENDER08/2025-26/GR-07
Open Tender
CIVIL
Patna
• Registration No. of ,BCD, RCD. Govt. of Bihar. (Participation in one or more groups would be within the financial limits of the registration)
• Existing commitments
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹5,000
Processing Fee: 590
₹50,000
OFFICE NAGAR PARISHAD JAMALPUR
10 Sept 2026
4 Feb 2026
10 Feb 2026
5 Feb 2026
9 Feb 2026
5 Feb 2026
6 Feb 2026
BILL OF QUANTITY OF Construction of step Ghat near Kali Pahari River Under NP J amalur, Dist-Munger
sl .NO BCD SOR ITEM QTY UNIT RATE AMOUNT
1 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 427.26 cum 360.70 154113.00
2 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete 75.17 cum 287.30 21596.00
3 11.72 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, 383.43 sqm 283.30 108626.00
4 4.1.3 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level. 1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20 mm nominal size) 63.81 sqm 3998.10 255119.00
5 5.1.2 Reinforced cement conrete work beams,suspendedfloors, roofs having slope upto 15,landings,balconiec, shelves, chajjas, lintels,bands,plain window sills, staircases and spiral stair cases upto floor five level excludingthe cost of centring, shuttering, finishing and reinforement with 1:1.5:3(1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nom 82.8 cum 4688.30 388191.00
6 5.22.7 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeThermo-Mechanically Treated bars TMTC-500
7 5.9.1 Centring and shuttering including strutting,propping etc. and removal of form for.Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc. 109.15 sqm 211.60 23096.00
8 5.9.5 Centring and shuttering including strutting,propping etc. and removal of form for.Lintels, beams, plinth bams, griders, bressumers and contilevers. 185.12 sqm 404.70 74918.00
9 5.9.6 Centring and shuttering including strutting,propping etc. and removal of form for.Columns,Pillars, Piers, Abutments, Posts and Struts 77.2 sqm 494.40 38168.00
10 6.1.14A Brick work with bricks of class designation 100A ifoundations and plinth in Cement mortar 1:6 (1 cement: 6 coarse sand ) 11.42 cum 4819.90 55043.00
11 11.3.1 Cement concrete flooring 1:2:4(1 cement:2 coarse:sand:4 graded stone agregate) finished with a floating coat of neat cement including cement slurry, etc. but excluding the cost of nosing of steps etc.complete.40 mm thick with 20 mm nominal size stone aggregate 377.61 sqm 289.10 109167.00
12 13.17.1 12 mm cement plaster 1:3( 1 cement: 3 coarse sand) finished with a 480.35 sqm 203.60 97799.00
13 13.94.1 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary pain+ of approved brand and manufacture 480.35 sqm 116.50 55961.00
14 CARRIAGE OF MATARIAL
(b) Coarse-sand 79.378 cum 1387.82 110162.00
(e)local sand 80.921 cum 268.35 21715.00
EXTRA COST OF MATARIAL
ADD ADDITIONAL GST 5.36 % 125156.00
FINAL AMOUNT 2460165.00
16 SEIGNORAGE FEE
(a) bricks 18.02 thou 512.8 9240
(b) Coarse-sand 79.38 cum 17.58 1395
(c ) stone chips 145.52 cum 59.54 8664
(e)local sand 80.92 cum 14.19 1148
SUB TOTAL AMOUNT of signorage) 20447.00
NET FINAL AMOUNT 2480612.00
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
E TENDER 08-2025-26.pdf
NIT • 0.86 MB
GR-07.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .