Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 CrAccepted-AOC 1791 GT SECTOR 7 PART 2 GURGAON | GURGAON | L1 | Accepted-AOC Tender alloted to the agency | |
| 2 | L2₹49.9 Cr+₹2.1 Cr (4.39%)Rejected-Finance E 4 92 2ND FLOOR SECTOR 16 ROHINI N DELHI 85 | DELHI | L2 | Rejected-Finance Rate on Higher Side | |
| 3 | L3₹49.9 Cr+₹2.1 Cr (4.39%)Rejected-Finance ROHTAK | ROHTAK | HARYANA | 124001 | L3 | Rejected-Finance Rate on Higher Side |
Tender Value
₹40.9 Cr
EMD Value
₹81.8 L
Closing Date
3 Mar 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Bhiwani/Superintending Engineer
PWD B and R office Bhiwani
Construction of Additional Administration Block in the Campus of Mini Secretariat at Bhiwani.
2022_HRY_207936_1
BWN/Rs. 4091.17 Lacs/Constn. Admn.Block Mini Sec
Open Tender
Civil Works - Buildings
Works
730 days
Bhiwani
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹81.8 L
Yes
12 Apr 2022
11 Feb 2022
4 Mar 2022
11 Feb 2022
3 Mar 2022
11 Feb 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
(1) All Kind of Soil. (HSR 4.12.1) | 11,512.75 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. (HSR 4.32). | 3,038.16 | Cum | - | - |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (HSR 4.33). | 12.69 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: (HSR 6.1)
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). (HSR 6.1.2). | 74.78 | Cum | - | - |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size). (HSR 6.1.6). | 1,515.52 | Cum | - | - |
| 6 | 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size). (HSR 6.1.7) | 82.51 | Cum | - | - |
| 7 | 20 mm thick cement plaster damp-proof course 1:3 with 2 coats of bitumen at 1.65 kg. per sqm, laid hot and sanded: (1) Vertical. (HSR 6.12.1). | 256.09 | Sqm | - | - |
| 8 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. (HSR 6.13). | 349.07 | Sqm | - | - |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). (HSR 6.25).
(1) All works up to plinth level. (HSR 6.25.1) | 6,698.75 | Cum | - | - |
| 10 | All works above plinth level up to floor IV level. (HSR 6.25.2) | 8,841.08 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
DNIT.pdf
Tender Notice • 0.93 MB
BOQ_273764.xls
BOQ Document • 2.16 MB
92361896.pdf
Tender Document • 4.04 MB
92361898.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .