| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | -16.95% | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹12.4 L (4.39%)Admitted-Finance C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | -13.30% | ₹2.9 Cr+₹12.4 L (4.39%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹27.7 L (9.84%)Admitted-Finance | -8.78% | ₹3.1 Cr+₹27.7 L (9.84%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 Cr+₹40.1 L (14.2%)Admitted-Finance | -5.13% | ₹3.2 Cr+₹40.1 L (14.2%) | L4 | Admitted-Finance |
| 5 | L5₹3.6 Cr+₹75.9 L (27.0%)Admitted-Finance | +5.45% | ₹3.6 Cr+₹75.9 L (27.0%) | L5 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
6 Jul 2026, 5:00 pmClosed
VICE CHAIRMAN GHAZIABAD DEVELOPMENT AUTHORITY
GDA OFFICE VIKAS PATH GHAZIABAD
CONSTRUCTION OF DRAIN FROM TILA MOD TO 12.00 METER WIDE ROAD IN FRONT OF POCKET-D OF INDRAPRASTH SCHEME.
2026_GDAUP_1158453_1
673/4/PA-T/2026-27 Dt. 06.06.2026 (S.no-05)
Open Tender
Civil Works
Percentage
365 days
GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹13,098
AS PER LINK PROVIDED IN TENDER DOCUMENT
₹6.8 L
7 Sept 2026
9 Jun 2026
8 Jul 2026
9 Jun 2026
6 Jul 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork: Excavation in foundation etc. in ordinary soil including lift upto 1.5m lead upto 50m including filling watering and removal of surplus earth as directed by the Engineer-in-charge specification all complete. DSR 2023/2.1.1 | 5,660 | Cum | 101.91 | ₹5,76,810.6 |
| 2 | Concrete with 4cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 8:4:1 including supply of all materials , labour , T&P etc. required for proper completion of the work.(DSR/2023 4.1.8) | 290 | Cum | 5,346.47 | ₹15,50,476.3 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size de
rived from natural sources).((DSR/2023 5.1.2) | 515 | Cum | 7,104.08 | ₹36,58,601.2 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(DSR/2023 5.2.2) | 856 | Cum | 8,523.37 | ₹72,96,004.72 |
| 5 | RCC work with cement approved coarse sand and 2cm (3/4")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 1½ coarsesand : 3 stonegrit) in slab excluding necessary centering & shuttering excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG binding wire(DSR/2023 5.3) | 90 | Cum | 9,035.85 | ₹8,13,226.5 |
| 6 | Mild steel (Tor steel or plain) in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage band overlapping and including cost of binding wire.((DSR/2023 5.22.1) | 1,462 | qtl | 8,406 | ₹1,22,89,572 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete(DSR/2023 5.9.1) | 686 | sqm | 307.98 | ₹2,11,274.28 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(DSR/2023 5.9.2) | 10,500 | sqm | 661.66 | ₹69,47,430 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (DSR/2023 5.9.3) | 532 | sqm | 728.22 | ₹3,87,413.04 |
| 10 | Providing of PVC pipe 100mm dia 6kg pressure including cartage of pipe,supply of all material labour T&P required for proper completion of work PWD SOR /2025 SI 15(iv) | 225 | RMT | 280 | ₹63,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
673_5.pdf
Tender Documents • 1.36 MB
BOQ_2171112.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .