| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-Finance 9415225188 SIRAJPUR BILHAUR KANPUR UTTAR PRADESH | FATEHPUR | UTTAR PRADESH | 208001 | ₹23.5 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹23.9 LRejected-Finance 91C CHILMAPUR SHIVPURI NEW COLONY PRATAP NAGAR GORAKHPUR UTTAR PRADESH 273016 UDYAM UP 32 0030968 | GORAKHPUR | UTTAR PRADESH | 273016 | ₹23.9 L | L2 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
18 May 2026, 12:00 pmClosed
EE CD1 PWD VARANASI
EE CD1 PWD VARANASI
JANPAD VARANASI ME KALLIPUR BENIPUR DINDAASHPUR MARG KE KM 1 ME 3X3X3 MITER BOX CALVART KA NIRMAN KA KARYA
2026_CEUVZ_1147377_1
1801/15A/2025-26DATE24/03/2026
Open Tender
Civil Works - Bridges
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹2.6 L
27 May 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(Cement Concret/ Brick)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 88.9 | Cum | 421 | ₹37,426.9 |
Earthwork in excavation for foundation of structure as per drawings and technical specification, including setting out, construction of shoring and bracing, removal of sumps and other deleterious matter, dress of sides and bottom backfilling with approved material.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 164.42 | Cum | 55 | ₹9,043.1 | |
Sand Filling in foundation trenches as per drawing and technical specification(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 64.75 | Cum | 890 | ₹57,627.5 | |
PCC Grade M-15 in open Foundation complete as per drawing and Technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 10.06 | Cum | 7,141 | ₹71,838.46 | |
Furnishing and Placing M-25 RCC in super-structure as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 99.01 | Cum | 9,570 | ₹9,47,554.41 | |
Providing weep holes in brick masonry/ Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1:20 (V:H) towards drawing force. Complete as per drawing and technical specifcations.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 4.8 | Rmtr. | 97 | ₹465.6 | |
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 36 | Cum | 2,583 | ₹92,988 | |
Back filling sandy material behind abutment, wing wall and return wall complete as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 180 | Cum | 890 | ₹1,60,200 | |
Drainage Spouts complete as per drawing and tehnical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 12 | Nos. | 1,011 | ₹12,132 | |
Supply fitting and placing HYSD Bar reinforcement in super structure complete as per drawing and technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 9.72 | MT. | 71,540 | ₹6,95,057.65 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
T1.pdf
Tender Documents • 0.32 MB
BOQ_2146485.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid