Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.1 Cr
EMD Value
₹7.3 L
Closing Date
27 Nov 2026, 3:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE PRAYAGRAJ CIRCLE PWD PRAYAGRAJ
SE PRAYAGRAJ CIRCLE PWD PRAYAGRAJ
CONSTRUCTION EXPANSION WORK OF THE OFFICE BUILDING FOR THE CHIEF ENGINEER (PMGSY) AND SUPERINTENING ENGINEER PMGSY PWD PRAYAGRAJ IN PRAYAGRAJ DISTRICT.
2026_CEALD_1210442_1
6286/06COM(3)-PRCIRCLE/2026 DT. 01-10-2026
Open Tender
Civil Works - Buildings
Fixed-rate
180 days
PRAYAGRAJ
AS PER NIT
3 documents required · 3 mandatory
₹2,354
₹7.3 L
SE PRAYAGRAJ CIRCLE PWD PRAYAGRAJ
19 Nov 2026
19 Nov 2026
27 Nov 2026
19 Nov 2026
27 Nov 2026
19 Nov 2026
23 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil. DSR 2023 : 2.6.1 | 24 | CUM | 130 | ₹3,120 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. DSR 2023 : 2.25 | 16.8 | CUM | 144 | ₹2,419.2 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides offoundation etc. complete for all lift. DSR 2023 : 2.25A | 9.4 | CUM | 514 | ₹4,831.6 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2023 : 2.27 | 3.7 | CUM | 1,560 | ₹5,772 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023 : 4.1.8 | 4.4 | CUM | 5,006 | ₹22,026.4 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of : All works upto plinth level. Concrete of M25 grade with minimum cement content of 330 kg /cum. DSR 2023 : 5.33.1.2 | 6.4 | CUM | 7,096 | ₹45,414.4 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. : All works above plinth level upto floor V level. Concrete of M25 grade with minimum cement content of 330 kg /cum. DSR 2023 : 5.33.2.1 | 110.5 | CUM | 7,247 | ₹8,00,793.5 |
| 8 | All works above plinth level upto floor V level. Concrete of M30 grade with minimum cement content of 350 kg /cum DSR 2023 : 5.33.2.2 | 18.5 | CUM | 7,358 | ₹1,36,123 |
| 9 | Centering and shuttering including strutting, propping etc. And removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. DSR 2023 : 5.9.1 | 5.7 | Sqm | 288 | ₹1,641.6 |
| 10 | Suspended floors, roofs, landings, balconies and access platform. DSR 2023 : 5.9.3 | 473.1 | Sqm | 681 | ₹3,22,181.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
T2CESEPMGSY.pdf
Tender Documents • 1.16 MB
BOQ_2299166.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .