Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAdmitted-Finance | ₹45.9 L | L1 | Admitted-Finance |
| 2 | L2₹52.5 LAdmitted-Finance | ₹52.5 L | L2 | Admitted-Finance |
| 3 | L3₹52.6 LAdmitted-Finance | ₹52.6 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 2 PUNJ SONS PREMISES KALKAJI IND AREA NEW DELHI 110019 | NEW DELHI | NEW DELHI | DELHI | 110019 | - | - | Rejected-Technical Disqualifies as the firm is not having ATO as per PQR of e-NIT. |
| Sl No | Description | Qty | Unit | Suny Insulations (India) L1 | Ms Om Insulation L3 | MAARFAT CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Thermal Insulation works in respect of TG and its auxiliaries | ||||||
| 1.01 | Alumina silicate fibre block insulation with bottom plaster, Thickness: 70x3mm, Area: HIP turbine (Cylinder cover) Main Turbine Site, refractory as per drawing attached ‘A’ temp-537 deg. C | 5 | Sq. Mtr. | 2,010 ₹10,050 | 3,699.54 ₹18,497.70 | 2,450 ₹12,250 |
| 1.02 | Alumina silicate fibre block type insulation with bottom plaster, Thickness: 60x3mm, Area: HIP turbine (Cylinder base) Main Turbine Site, refractory as per drawing attached ‘A’ temp-537 deg. C | 5 | Sq. Mtr. | 1,905 ₹9,525 | 3,225.13 ₹16,125.65 | 2,250 ₹11,250 |
| 1.03 | Alumina silicate fibre type insulation , Thickness: 80x2mm, Area: steam inlet sleeve, HIP turbine Main Turbine Site, refractory as per drawing attached ‘A’ temp-537 deg. C | 2 | Sq. Mtr. | 1,650 ₹3,300 | 3,225.13 ₹6,450.26 | 2,050 ₹4,100 |
| 1.04 | Alumina silicate fibre type, Thickness: 40x2mm, Area: Dum Ring balance piping, HIP turbine Main Turbine Site, temp-367 deg. C | 2 | Sq. Mtr. | 840 ₹1,680 | 1,849.7 ₹3,699.40 | 1,950 ₹3,900 |
| 1.05 | Alumina silicate fibre block type insulation with bottom plaster, Thickness: 80x2mm, Area: MSV body Main Turbine Site, refractory as per drawing attached ‘B’ Temp- 537 deg. C | 38 | Sq. Mtr. | 1,610 ₹61,180 | 3,225.13 ₹1.2 L | 2,150 ₹81,700 |
| 1.06 | Alumina silicate fibre pipe type insulation with bottom plaster, Thickness: F340x70 and F480x50, Area: GV piping and flanges Main Turbine Site, Aluminium cladding and Refractory as per drawing attached ‘B’ Temp- 537 deg. C | 60 | Sq. Mtr. | 1,230 ₹73,800 | 3,098.91 ₹1.9 L | 2,450 ₹1.5 L |
| 1.07 | Alumina silicate fibre block type insulation with bottom plaster, Thickness: 80x2mm, Area: RSV and RIV body and cover Main Turbine Site, Refractory as per drawing attached ‘C’ Temp- 537 deg. C | 25 | Sq. Mtr. | 1,610 ₹40,250 | 3,225.13 ₹80,628.25 | 2,450 ₹61,250 |
| 1.08 | Alumina silicate fibre pipe type insulation with bottom plaster, Thickness: 80x2mm, Area: RSV piping and flanges Main Turbine Site, Aluminium cladding and Refractory as per drawing attached ‘C’ Temp- 537 deg. C | 45 | Sq. Mtr. | 2,030 ₹91,350 | 3,225.13 ₹1.5 L | 2,450 ₹1.1 L |
| 1.09 | Alumina silicate fibre block type insulation, Thickness: 60 +40mm, Area: cross-over piping and flanges Main Turbine Site, Aluminium cladding and Refractory as per drawing attached ‘D’ Temp- 367 deg. C | 100 | Sq. Mtr. | 1,610 ₹1.6 L | 2,342.75 ₹2.3 L | 2,400 ₹2.4 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
19 Jan 2026, 11:00 amClosed
RAKESH HARSH
CE RGTPP Khedar Hisar
Thermal Insulation works pertaining to Boiler and its auxiliaries of Unit-II, RGTPP and Thermal insulation works on Turbine, pipelines, valves etc. of Unit-II during overhauling at RGTPP, Khedar, Hisar.
2025_HBC_481964_1
20259870B44C CBD2 4701 8814 3DF352626895712PGC
Open Tender
Power/Energy Projects/Products
90 days
KHEDAR
As per attached tender document
2 documents required · 2 mandatory
₹1,180
₹1.2 L
Yes
7 May 2026
8 Nov 2025
21 Jan 2026
8 Nov 2025
19 Jan 2026
8 Nov 2025
Alumina silicate fibre block insulation with bottom plaster, Thickness: 70x3mm, Area: HIP turbine (Cylinder cover) Main Turbine Site, refractory as per drawing attached ‘A’ temp-537 deg. C
Alumina silicate fibre block type insulation with bottom plaster, Thickness: 60x3mm, Area: HIP turbine (Cylinder base) Main Turbine Site, refractory as per drawing attached ‘A’ temp-537 deg. C
Alumina silicate fibre type insulation , Thickness: 80x2mm, Area: steam inlet sleeve, HIP turbine Main Turbine Site, refractory as per drawing attached ‘A’ temp-537 deg. C
Alumina silicate fibre type, Thickness: 40x2mm, Area: Dum Ring balance piping, HIP turbine Main Turbine Site, temp-367 deg. C
Alumina silicate fibre block type insulation with bottom plaster, Thickness: 80x2mm, Area: MSV body Main Turbine Site, refractory as per drawing attached ‘B’ Temp- 537 deg. C
Alumina silicate fibre pipe type insulation with bottom plaster, Thickness: F340x70 and F480x50, Area: GV piping and flanges Main Turbine Site, Aluminium cladding and Refractory as per drawing attached ‘B’ Temp- 537 deg. C
Alumina silicate fibre block type insulation with bottom plaster, Thickness: 80x2mm, Area: RSV and RIV body and cover Main Turbine Site, Refractory as per drawing attached ‘C’ Temp- 537 deg. C
Alumina silicate fibre pipe type insulation with bottom plaster, Thickness: 80x2mm, Area: RSV piping and flanges Main Turbine Site, Aluminium cladding and Refractory as per drawing attached ‘C’ Temp- 537 deg. C
Alumina silicate fibre block type insulation, Thickness: 60 +40mm, Area: cross-over piping and flanges Main Turbine Site, Aluminium cladding and Refractory as per drawing attached ‘D’ Temp- 367 deg. C
Apply refractory plaster (Thickness- 10mm) and cover it with adhesive and glass fibre cloth wholly.Temp- 540 deg. C
Alumina silicate Felt, Insulation Thickness-160 mm, Cladding thickness-Refractor plaster, Temp- 540 deg. C
Alumina silicate Felt ,Thickness 120 mm, Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 540 deg. C
Alumina silicate Felt ,Thickness 100 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 450 deg. C
Alumina silicate Felt ,Thickness 50 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 350 deg. C
Rock Wool felt ,Insulation Thickness 160 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 400 deg. C
Rock Wool felt ,Insulation Thickness120 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 400 deg. C
Rock Wool felt,Insulation Thickness 100 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 350 deg. C
Rock Wool felt ,Insulation Thickness 80 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 350 deg. C
Rock Wool felt , Insulation Thickness 50 mm Cladding thickness-Al Sheet,Th.0.71 mm, Temp- 250 deg. C
Cladding thickness-Al Sheet,Th.0.71 mm
Thermal Insulation works in respect of Boiler and its auxiliaries
Providing new Insulation with refixing of old cladding in Boiler Furnace Area. Insulation (Type: Rock Wool Felt, Thickness-200mm) Netting: GI, Cladding (Old Corrugated sheet)
Providing new Insulation with new cladding in Boiler Furnace Area. Insulation (Type: Rock Wool Felt, Thickness-200mm) Netting: GI, Cladding (Corrugated Al. Sheet, Thickness: 1.2 mm)
Providing New Insulation with refixing of old cladding in Boiler Furnace Wind Box and APH Area. Insulation (Type: Rock Wool Felt, Thickness-200mm) Netting: GI, Cladding (Old Corrugated sheet)
Providing New Insulation with New Cladding in Boiler Furnace Wind Box and APH Area. Insulation (Type: Rock Wool Felt, Thickness-190 mm) Netting: GI, Cladding (Corrugated Al. Sheet, Thickness: 1.2 mm)
Providing New Insulation with refixing of old cladding in Drum DownComers pipers 24 to 80 m elevation, ring header including man holes of ring header at 9 meter elevation, main steam to PRDS line, main steam line and ID fan area. Insulation (Type: Rock Wool Felt, Thickness-150 mm) Netting: GI, Cladding (Old plain sheet)
Providing New Insulation with new cladding in Drum Down-Comers pipers 24 to 80 m elevation, ring header including man holes of ring header at 9 meter elevation, main steam to PRDS line, main steam line and ID fan area. Insulation (Type: Rock Wool Felt, Thickness-150 mm) Netting: GI, Cladding (Al. Sheet, Thickness: 0.56 mm)
Providing New Insulation with refixing of old Cladding in Bottom of Zpanel at 9 meter elevation and ESP Hopper area. Insulation (Type: Rock Wool Felt, Thickness-150 mm) Netting: GI, Cladding (Old Corrugated sheet)
Providing New Insulation with new cladding in Bottom of Z-panel at 9 meter elevation and ESP Hopper area. Insulation (Type: Rock Wool Felt, Thickness-190 mm) Netting: GI, Cladding (Corrugated Al. Sheet, Thickness: 1.2 mm)
Providing New Insulation with new cladding in Fuel Oil Lines/after Vent/Drain line valve i.e. Drum Vent, CBD Drain (Left and Right) and Vent, LTSH Drain line and Ring Header Drain Valve area. Insulation (Type: Rock Wool Felt, Thickness-50 mm) Netting: GI, Cladding (Al. Sheet, Thickness: 0.56 mm)
Filling Inside Cover Plates. Providing only new Insulation in Burner Panel area. Insulation (Type: Rock Wool Felt, Thickness-120 mm) Netting: GI.
Providing New Insulation with New Cladding in Vent/Drain i.e. Drum Vent, CBD Drain (Left and Right), SH Spray Line and Vent, LTSH Drain line and Ring Header Drain Valve area. Insulation (Type: Rock Wool Felt, Thickness-100 mm) Netting: GI. Cladding (Al. Sheet, Thickness: 0.56 mm)
Providing New Insulation with New Cladding in Primary and secondary Hot Air Duct at, 6 M to 30 M elevation area. Insulation (Type: Rock Wool Felt, Thickness-170 mm) Netting: GI. Cladding (Corrugated Al. Sheet Thickness: 1.2 mm)
Providing New Insulation with refixing of old cladding in Primary and secondary Hot Air Duct at , 6 M to 30 M elevation area. Insulation (Type: Rock Wool Felt, Thickness-170 mm) Netting: GI. Cladding (Old Corrugated Sheet)
Providing New Insulation with New Cladding in Flue Gas Duct area. Insulation (Type: Rock Wool Felt, Thickness-40 mm) Netting: GI. Cladding (Corrugated Al. Sheet Thickness-1.2 mm )
Providing New Insulation with refixing of old cladding in Flue Gas Duct area. Insulation (Type: Rock Wool Felt, Thickness-40 mm) Netting: GI. Cladding (Old Corrugated Sheet)
Providing New Cladding sheet on existing insulation in any area boiler/ hot duct/cold duct/wind box/ ESP hopper /ESP duct. Cladding (Corrugated Sheet Al Thickness: 1.2 mm)
Providing New Cladding sheet on existing insulation in Any area line of vent/drain/main steam line/ bottom Ring Header line. Cladding (Al. Sheet Thickness: 0.56 mm)
Refixing of Old cladding Sheet in any of the area pertaining to Boiler and its auxiliaries. Cladding (Old Corrugated/ plain sheet)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
BOQ_559945.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid