Loading…
Loading…
Tender Value
₹20.4 L
EMD Value
₹40,900
Closing Date
11 Jun 2026, 6:00 pm3d left
EE RMC ENG
RMC
Improvement of Road with Bituminous Road Surface and RCC Drain in Vrindavan Colony Road No-3N under ward No-04
2026_UDD_114867_3
282/eng 2026
Open Tender
Civil Works
120 days
As per NIT and RFP
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹40,900
6 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
11 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Dismantling Pucca Brick or lime work including stacking seviceable materails in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I | 16.99 | m3 | 541.67 | ₹9,202.97 |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | 120.28 | m3 | 151.82 | ₹18,260.91 |
| 3 | Providing and applying Tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surfaced cleaned with mechanical broom | 1,295.86 | M2 | 18.6 | ₹24,103 |
| 4 | Providing ,supplying & spreading of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour, royality and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume) | 9.35 | m3 | 347.85 | ₹3,252.4 |
| 5 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 15.71 | m3 | 1,756.4 | ₹27,593.04 |
| 6 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | 48.92 | m3 | 6,082.45 | ₹2,97,553.45 |
| 7 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 19.04 | m3 | 6,308.87 | ₹1,20,120.88 |
| 8 | Providing Tor steel reinforcement of 8mm ,10 mm, 12 mm and 16 mm dia rods bars as per approved design and drawing with cutting , bending and binding with annealed wire with cost of wire ,removal of rust , placing the rods in postion ( excluding carriage of bars to work site) , all complete as per building specification and direction of E/I.TMT Fe 500 ( only valid for SAIL and TATA steel , JSPL, Electro steel Ltd Bokaro and Vizag (RINL) 8mm | 2.43 | MT | 83,314.02 | ₹2,02,453.07 |
| 9 | 10mm | 2.97 | MT | 82,096.54 | ₹2,43,826.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_155354.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid