Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹53.0 L−₹2.0 L (3.61%)Accepted-AOC | ₹53.0 L−₹2.0 L (3.61%) | H3 | Accepted-AOC AOC |
| 2 | H1₹55.0 LRejected-Finance | ₹55.0 L | H1 | Rejected-Finance REJECTED |
| 3 | H2₹54.2 L−₹83,900 (1.53%)Rejected-Finance | ₹54.2 L−₹83,900 (1.53%) | H2 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
12 Mar 2025, 5:00 pmClosed
CHIEF OFFICER
MUNICIPAL COUNCIL MURTIZAPUR
Maintenance and repair of all electrical and pumping systems under the Murtizapur City Water Supply Scheme for the year 2025-26.
2025_DMA_1156739_1
E-TENDER NOTICE NO 02/2025 DATED 04/03/2025
Open Tender
Electrical and Maintenance Works
Percentage
180 days
MUNICIPAL COUNCIL MURTIZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹10,000
15 Jul 2025
5 Mar 2025
13 Mar 2025
5 Mar 2025
12 Mar 2025
5 Mar 2025
Amount
WATER SUPPLY SCHEME
Grease
Gland rope
Cut out fuse 200A
Fuse wire
Deo wire
Supplying & erecting crimping type aluminium lugs of for cable of 70 sq.mm complete
Supplying & erecting crimping type aluminium lugs of for cable of 95 sq.mm complete
Supplying & erecting crimping type aluminium lugs of for cable of 120 sq.mm complete
Supplying & erecting crimping type aluminium lugs of for cable of 185 sq.mm complete
Supplying & erecting crimping type aluminium lugs of for cable of 240 sq.mm complete
Supplying & erecting crimping type aluminium lugs of for cable of 300 sq.mm complete
Supplying , erecting & terminating 4 x 70 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe
Supplying , erecting & terminating 4 x 95 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe
Supplying , erecting & terminating 4 x 120 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe
Supplying , erecting & terminating 4 x 185 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe
Supplying , erecting & terminating 4 x 240 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe
Supplying , erecting & terminating 4 x 300 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe
Rewinding of electric motor of 3 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year(The dismantled material shall be retained by the contractor.)
Rewinding of electric motor of 5 H.P three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.)
Rewinding of electric motor of 10 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.)
Rewinding of electric motor of 15 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.)
Rewinding of electric motor of 30 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.)
Rewinding of electric motor of 50 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.)
Rewinding of electric motor of VT 100 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.)
Servicing ,varnishing and greasing of 3 H.P. motor
Servicing ,varnishing and greasing of 5 H.P. motor
Servicing ,varnishing and greasing of 10 H.P. motor
Servicing ,varnishing and greasing of 15 H.P. motor
Servicing ,varnishing and greasing of 30 H.P. motor
Servicing ,varnishing and greasing of 50 H.P. motor
Servicing ,varnishing and greasing of VT 100 H.P. motor
Servicing, oiling, greasing of 3 H.P. Pump
Servicing oiling, greasing of 5 H.P. Pump
Servicing oiling, greasing of 10 H.P. Pump
Servicing oiling, greasing of 15 H.P. Pump
Servicing oiling, greasing of 30 H.P. Pump
Servicing oiling, greasing of 50 H.P. Pump
Servicing oiling, greasing of VT 100 H.P. Pump
Servicing oiling, greasing of all gear box
Replacing the existing bearing of approved make for electric motor of 3 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for electric motor of 5 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for electric motor of 10 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for electric motor of 15 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for electric motor of 30 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for electric motor of 50 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for electric motor of VT 100 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of 3 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of 5 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of 10 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of 15 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of 30 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of 50 H.P. of all types with due alignment of the shaft and tested.
Replacing the existing bearing of approved make for pump of VT 100 H.P. of all types with due alignment of the shaft and tested.
Supplying and erecting DOL Starter for 3 H.P motor
Supplying and erecting DOL Starter for 5 H.P motor
Supplying & erecting contactor for Star Delta motor starter of 10 H.P.
Supplying & erecting contactor for Star Delta motor starter of 15 H.P.
Supplying & erecting contactor for Star Delta motor starter of 30 H.P.
Supplying & erecting contactor for Star Delta motor starter of 50 H.P.
Supplying & erecting contactor for Star Delta motor starter of VT 100 H.P.
Supplying, erecting & marking MCCB of 3 H.P. starter
Supplying, erecting & marking MCCB of 5 H.P. starter
Supplying, erecting & marking MCCB of 10 H.P. starter
Supplying, erecting & marking MCCB of 15 H.P. starter
Supplying, erecting & marking MCCB of 30 H.P. starter
Supplying, erecting & marking MCCB of 50 H.P. starter
Supplying, erecting & marking MCCB of VT 100 H.P. starter
Supplying, erecting & marking MCCB of 40 A
Supplying, erecting & marking MCCB of 100 A
Supplying, erecting & marking MCCB of 160 A
Supplying, erecting & marking MCCB of 200 A
Supplying, erecting & marking MCCB of 300 A
Supplying & erecting relay for Star Delta motor starter of 10 H.P
Supplying & erecting relay for Star Delta motor starter of 15 H.P
Supplying & erecting relay for Star Delta motor starter of 30 H.P
Supplying & erecting relay for Star Delta motor starter of 50 H.P
Supplying & erecting relay for Star Delta motor starter of VT 100 H.P
Supplying & erecting timer for Star Delta motor starter of 10 H.P.
Supplying & erecting timer for Star Delta motor starter of 15 H.P.
Supplying & erecting timer for Star Delta motor starter of 30 H.P.
Supplying & erecting timer for Star Delta motor starter of 50 H.P.
Supplying & erecting timer for Star Delta motor starter of VT 100 H.P.
Supplying and erecting of any size electrolyte copper patti or bar in bus bar chamber in panel or any other purpose, 500 V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve.
Supplying and erecting of any size electrolyte aluminium Patti or bar in bus bar chamber in panel or any other purpose, 500 V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve.
Supplying and erecting current transformer coil with insulation
Supplying and erecting of digital voltmeter of all type starter
Supplying and erecting of digital ammeter of all type starter
Providing, erecting pressure gauge of required range complete with siphon tube, isolating dock suitable for 12 mm dia G.Z pipe.
Rewinding of 30 Hp starter auto transformer
Rewinding of 50 Hp starter auto transformer
Rewinding of 100 Hp starter auto transformer
Servicing and greasing of AB switch
Supplying and erecting 200 Amp change over switch
Supplying and erecting 400 Amp change over switch
Supplying and erecting 63 Amp main switch
Supplying and erecting 200 Amp main switch
Supplying and erecting 250 Amp main switch
Supplying and erecting 400 Amp main switch
Supplying and erecting of contactor kit of all starter
Supplying and erecting of no volt coil
Supplying and erecting of OCB
Supplying and erecting of OCB coil
Supplying and erecting of moving tip contact assembly
Supplying and erecting of moving tip contactor
Supplying and topping up filtered transformer oil of approved make with test certificate.
Filtration of Transformer oil on site till satisfactory test results.
Supplying and erecting of transformer packing
Supplying and erecting of HT/LT stud
Supplying and erecting of air breather
Supplying and erecting bank of all polyprolstene capacitors.
Supplying , erecting and giving test and trial of 10 H.P. stuffing box
Supplying , erecting and giving test and trial of 15 H.P. stuffing box
Supplying , erecting and giving test and trial of 30 H.P. stuffing box
Supplying , erecting and giving test and trial of 50 H.P. stuffing box
Supplying , erecting and giving test and trial of VT 100 H.P. stuffing box
Supplying , erecting and giving test and trial of 3 H.P. gland bush
Supplying , erecting and giving test and trial of 5 H.P. gland bush
Supplying , erecting and giving test and trial of 10 H.P. gland bush
Supplying , erecting and giving test and trial of 15 H.P. gland bush
Supplying , erecting and giving test and trial of 30 H.P. gland bush
Supplying , erecting and giving test and trial of 50 H.P. gland bush
Supplying , erecting and giving test and trial of VT 100 H.P. gland bush
Supplying , erecting and giving test and trial of 3 H.P. shaft
Supplying , erecting and giving test and trial of 5 H.P. shaft
Supplying , erecting and giving test and trial of 10 H.P. shaft
Supplying , erecting and giving test and trial of 15 H.P. shaft
Supplying , erecting and giving test and trial of 30 H.P. shaft
Supplying , erecting and giving test and trial of 50 H.P. shaft
Supplying , erecting and giving test and trial of VT 100 H.P. shaft
Supplying , erecting and giving test and trial of 3 H.P. connection plate
Supplying , erecting and giving test and trial of 5 H.P. connection plate
Supplying , erecting and giving test and trial of 10 H.P. connection plate
Supplying , erecting and giving test and trial of 15 H.P. connection plate
Supplying , erecting and giving test and trial of 30 H.P. connection plate
Supplying , erecting and giving test and trial of 50 H.P. connection plate
Supplying , erecting and giving test and trial of VT 100 H.P. connection plate
Supplying , erecting and giving test and trial of gland sleeve of all pump
Supplying , erecting and giving test and trial of gland bush of all pump
Supplying , erecting and giving test and trial of gland cup of all pump
Supplying , erecting and giving test and trial of gland of all pump
Supplying strainer for VT 100 HP pump
Supplying , erecting, alignment and giving test and trial of coupling 3 H.P. pump
Supplying , erecting, alignment and giving test and trial of coupling 5 H.P. pump
Supplying , erecting, alignment and giving test and trial of coupling 10 H.P. pump
Supplying , erecting, alignment and giving test and trial of coupling 15 H.P. pump
Supplying , erecting, alignment and giving test and trial of coupling 30 H.P. pump
Supplying , erecting, alignment and giving test and trial of coupling 50 H.P. pump
Supplying , erecting, alignment and giving test and trial of coupling VT 100 H.P. pump
Alignment of pump-motor of 3 Hp
Alignment of pump-motor of 5 Hp
Alignment of pump-motor of 10 Hp
Alignment of pump-motor of 15 Hp
Alignment of pump-motor of 30 Hp
Alignment of pump-motor of 50 Hp
Alignment of pump-motor of VT 100 Hp
Supplying and erecting of lock of panel ,starter,etc.
Oil paper
Dismantling of 3 H.P pump
Dismantling of 5 H.P pump
Dismantling of 10 H.P pump
Dismantling of 15 H.P pump
Dismantling of 30 H.P pump
Dismantling of 50 H.P pump
Dismantling of VT 100 H.P pump
Assembling with over oiling of 3 H.P pump
Assembling with over oiling of 5 H.P pump
Assembling with over oiling of 10 H.P pump
Assembling with over oiling of 15 H.P pump
Assembling with over oiling of 30 H.P pump
Assembling with over oiling of 50 H.P pump
Assembling with over oiling of VT 100 H.P pump
Dismantling of 3 H.P Motor
Dismantling of 5 H.P Motor
Dismantling of 10 H.P Motor
Dismantling of 15 H.P Motor
Dismantling of 30 H.P Motor
Dismantling of 50 H.P Motor
Dismantling of VT 100 H.P Motor
Assembling of 3 H.P Motor
Assembling of 5 H.P Motor
Assembling of 10 H.P Motor
Assembling of 15 H.P Motor
Assembling of 30 H.P Motor
Assembling of 50 H.P Motor
Assembling of VT 100 H.P Motor
Electrician operator
Taking out and reinstalling Submersible pump-motor set from bore well for repairing
Rewinding of Submersible pump-motor set 0.5 HP
Rewinding of Submersible pump-motor set 0.75 HP
Rewinding of Submersible pump-motor set 1.0 HP
Rewinding of Submersible pump-motor set 1.5 HP
Rewinding of Submersible pump-motor set 2.0 HP
Rewinding of Submersible pump-motor set 3.0 HP
Rewinding of Submersible pump-motor set 5.0 HP
Rewinding of Submersible pump-motor set 7.5 HP
Vivek wankhede (BID ID -6551070)
Galaxy engineering works (BID ID -6550835)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .