Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.2 LAccepted-AOC LIG 223 SHIVAJI NAGAR KORBA PIN CODE 495677 | KORBA | CHHATTISGARH | 495677 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹32.7 L+₹2.0 L (6.46%)Rejected-Finance 1ST FLOOR FLAT NO A 104 ANANT EMEGINE SOCIETY PURANA BUS STAND KORBA DISTT KORBA C G 495678 | 495678 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹34.0 L+₹3.3 L (10.6%)Rejected-Finance 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹41.9 L+₹11.2 L (36.5%)Rejected-Finance | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status |
Tender Value
₹63.8 L
EMD Value
₹79,800
Closing Date
30 Mar 2024, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Assistance in operation of bunker gate for loading of trucks from steel bunkers, regular cleaning of spillage coal dust/slush/slurry etc at feeder breakers, associated secondary crushers and belt conveyors etc. of B-11 and B-12 feeder breaker at DEP.
2024_SECL_304781_1
SECL/GM/DA/SO(EnM)/ e-tender/23-24/66 dtd-12/03/24
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
5 documents required · 5 mandatory
₹79,800
29 May 2024
13 Mar 2024
1 Apr 2024
13 Mar 2024
30 Mar 2024
14 Mar 2024
13 Mar 2024 - 23 Mar 2024
Amount
Assistance in opening of bunker gate for loading of trucks from steel bunkers in all three shifts at B-11 and B-12 feeder breaker circuits of Mini CHP for a period of one year (365 days). Scope of Work: To provide assistance of 02 semi-skilled manpower in each shifts i.e. 06 nos. manpower per day for opening of bunker gate mechanism.
Regular cleaning of spilled over coal/slush/dust etc. from in and around belt conveyor walkway, platforms of discharge house, tail end, below return belt etc. and disposing removed/ dust/ muck/ coal pieces on belt conveyor during maintenance/ shift change over etc. when belt is not in operation.
Removing, gathering and stacking of coal/slush/loose, earth/muck etc. deposited in and around CHP structures, crushers, drive house, take up structures etc. during operation of plant, where it can not be disposed on conveyor belts and has to be removed, gathered manually and stacked within a lead of 50 mtrs away from CHP structures (columns, gantry support, bunker), Belt structure, Crusher structures etc. as per instructions of Engineer Incharge.
Note: The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 12 nos.
Total impact of GST for the purpose of CTC
AARNA Constructions
S N Agrawal
Hems Corporation
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .