Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
24 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO(BP)
panchayat union office,devakottai
SCHOOL REPAIR WORKS MEKKARAIKUDI
2023_RDTN_318336_1
DVK_SIDS_22_23_SCHOOL REPAIR WORKS MEKKARAIKUDI
Open Tender
Civil Works
Works
90 days
devakottai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
24 May 2023
23 May 2023
24 May 2023
23 May 2023
24 May 2023
23 May 2023
Amount
Renovation of School Tiled Roof Building & RCC Roof at P.U.Primary School at Mekkaraikudi Village in Vettivayal Panchayat
Dismandling the exisiting damaged Clean removal of Cement Plaster from walls sl.no.74,item no.320
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distempering the old walls and ceiling two coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use ) the rate includes cost of brushes ,neat finishing ,cost of brushes etc., complete complying with standard specification and as directed by the Departmental officer
Re painting the wall with two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping , clean removal of dirt. the rate includes cost of brushes, sand paper , plaster of parries ,putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental officer (the colour and quality should be get approved by the Executive Engineer before use ) SI No. 358
Painting the Old Iron Works two coats with syntactic Enamel paint of approved quality and colour including ordinary Scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental officer (the colour and quality should be got approved by the Executive Engineer before use )
Providing Cuddapah Slab 50mm Thick
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.`
Labour Charges for fixing Cuddapah Slab to Cup-Board
Painting two coats with approved Block Oxide for Block Board
Dismandling the exisiting damaged pressed tiles
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC (40%)
Dismandling the exisiting damaged Clean removal of Cement plaster from walls sl.no.74,item no.320
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Providing Cuddapah Slab 50mm Thick
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.`
Labour Charges for fixing Cuddapah Slab to Cup-Board
Distempering the old walls and ceiling two coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use ) the rate includes cost of brushes ,neat finishing ,cost of brushes etc., complete complying with standard specification and as directed by the Departmental officer
Re painting the wall with two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping , clean removal of dirt. the rate includes cost of brushes, sand paper , plaster of parries ,putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental officer (the colour and quality should be get approved by the Executive Engineer before use ) SI No. 358
Painting the Old Iron Works two coats with syntactic Enamel paint of approved quality and colour including ordinary Scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental officer (the colour and quality should be got approved by the Executive Engineer before use )
Painting two coats with approved Block Oxide for Block Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Moises
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .