| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹42.6 L
EMD Value
₹43,000
Closing Date
25 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA Kallakurichi
Project Director, DRDA Kallakurichi 606202
AGAMT -II Maintenance of Kulam/Eri, Streets and Lane,School infrastructure,Green Coverage Cleaning Village, Livelihood Marketing at S.Ogaiyur Panchayat in Thiyagadurgam Block
2022_RDTN_239375_1
TNKKI/AGAMT-II/2021-2022/036
Open Tender
Civil Works
Item Rate
90 days
Kallakurichi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹43,000
Yes
2 Aug 2022
5 Jul 2022
25 Jul 2022
5 Jul 2022
25 Jul 2022
5 Jul 2022
90 days
Amount
Providing Cement concrete Pavement in New Colony Community Hall Street in S.Ogaiyur Panchayat at Thiyagadurgam
Earthwork excavation and depositing on bank with initial lead and lift in all type of soil except hard rock requiring blasting as per SS 20 B for Kerb wall Foundation
Cost and Labour for Centering works including all cost and conveyance and all labour charge etc,complete
Plain Cement Concrete 1:4:8mix using 40mm HBG metal including all cost and conveyance and all labour charge etc,complete
Plain Cement Concrete 1:2:4 mix 20mm HBG ISS metal including all cost and conveyance and all labour charge etc , complete
Bitumen pad for expension joint
Provision for Name board charges
Provision for Photographic charges etc
Providing Cement concrete Pavement in Old Colony Mayavel House Street in S.Ogaiyur Panchayat at Thiyagadurgam
Earthwork excavation and depositing on bank with initial lead and lift in all type of soil except hard rock requiring blasting as per SS 20 B for Kerb wall Foundation
Cost and Labour for Centering works including all cost and conveyance and all labour charge etc,complete
Plain Cement Concrete 1:4:8mix using 40mm HBG metal including all cost and conveyance and all labour charge etc,complete
Plain Cement Concrete 1:2:4 mix 20mm HBG ISS metal including all cost and conveyance and all labour charge etc , complete
Bitumen pad for expension joint
Provision for Name board charges
Provision for Photographic charges etc
Construction of Compound Wall @ Cremation Shed in S.Ogayur Panchayat
Earthwork excavation and depositing on bank with initial lead and lift in all type of soil except hard rock requiring blasting as per SS 20 B for Kerb wall Foundation
Cement concrete 1:4:8 mix using 40 mm ISS HBG Metal including cost conveyance and labour charges etc., complete
Cost and Labour for Centering works including all cost and conveyance and all labour charge etc,complete
RCC 1;1.5;3, 20 mm thick including all etc complete.
Supply and fabrication of steel including all labour charges etc, complete.
Brick work in c.m 1:5, country bricks including all labour charges etc complete.
Plastering with cement mortar 1:5-12 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
Colour washing two coats with Exteeriour Emulsion paint including cost and all labour charges etc complete
Provision for Name board charges
Provision for Photographic charges etc
Construction of Drainage cum Vertical Soakpit at New Colony North Street in S.Ogaiyur Panchayat
Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:2:4 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supply & Erection of centring for sides using country wood planks including cost & conveyance and labour charges etc complete.
Plastring1;4, 20 mm thick including all etc.complete
Provision for photographic charges etc.,
Provision for name board charges etc.,
Provision for Vertical filter
Construction of School Toilet ( Teachers ) at S.Ogayur P.U.Ele School
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more tha
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations
Reinforced Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ro
Fabrication and Supply of MILD STEEL DOOR
Towards the Labour charges for fixing in position of Steel Dorrs
Towards the cost and supply of RCC Jolly of size 0.60 X 0.3 m including all charges etc., complete
Towards the Labour charges for fixing in position of supplied RCC Jolly
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 10mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Dadooing in CM 1:2 mix using any colour glazed tiles including all charges et., complete
Paving the floor with Anti skid tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly compl
Distempering TWO coat using best oil bound distemper in all the floors, including cost of lime blue powder, fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting two coat using Exterier Emulsion including cost and conveyance and all labour charges etc, complete
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specificati
Towards the cost and supply of IWC with foot rest and P-trap including all charges etc., complete
Towards the cost and supply of Wash basin with view mirror including all charges etc., complete
Towards the Labour charges for fixign in position of the suplied water closset and wash basin
Providing for soak pit arrangement
Towards supply and fixing of hand rails including all charges etc., complete
Supply of Septic tank Precast cover slab
Provision for water supply arrangement with new bore well
Providing Name Board
Provision for Photographic charges
Construction of School Toilet ( Teachers ) Udayarpalayam at S.Ogayur P.U.Ele School
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more tha
Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations
Reinforced Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ro
Fabrication and Supply of MILD STEEL DOOR
Towards the Labour charges for fixing in position of Steel Dorrs
Towards the cost and supply of RCC Jolly of size 0.60 X 0.3 m including all charges etc., complete
Towards the Labour charges for fixing in position of supplied RCC Jolly
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with Cement Mortar 1:3 (one cement and three sand ) 10mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Dadooing in CM 1:2 mix using any colour glazed tiles including all charges et., complete
Paving the floor with Anti skid tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly compl
Distempering TWO coat using best oil bound distemper in all the floors, including cost of lime blue powder, fevicol type gums, brushes, scaffolding, scaffolding charges etc., complete with standard specification.
Painting two coat using Exterier Emulsion including cost and conveyance and all labour charges etc, complete
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specificati
Towards the cost and supply of IWC with foot rest and P-trap including all charges etc., complete
Towards the cost and supply of Wash basin with view mirror including all charges etc., complete
Towards the Labour charges for fixign in position of the suplied water closset and wash basin
Providing for soak pit arrangement
Towards supply and fixing of hand rails including all charges etc., complete
Supply of Septic tank Precast cover slab
Provision for water supply arrangement with new bore well
Providing Name Board
Provision for Photographic charges
Construction of Threshing Floor @ Udayarpalayam TNCSC Gowdown Near in S.Ogayur
Earth work excavation and depositing on bank with including cost and convayance of all labour charges etc complete
Cement concrete 1:4:8 miX using 40mm ISS HBG metal including cost and convayance of all materials to site etc, complete.
Centering with country wood palnks including cost and convayance of all lbour charges etc complete.
Cement concrete 1:3:6 miX using 40mm ISS HBG metal including cost and convayance of all materials to site etc, complete.
Re-filling with Excavated Earth including cost and convayance of all labour charges etc complete
Cc 1:2:4 miX using 20 mm ISS HBG metal including cost and convayance of all materials to site etc, complete.
Provision for Bitumen pad for Expension joint
Provision for Name board charges
Providiing Photographic charges
IMPROVEMENTS TO NALLA KULAM IN S.OGAIYUR PANCHAYAT
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
ORDINARY SOIL (SS20B) Earth work excavating anddepositing on bank with initial lead of 10m & initial lift of2m in Sand, silt or other loose soil, wet sand or silt notunder water, light black cotton soil, sandy loam andordinary soil including excavated ear
Earth work deploying earth moving machinery for desitling channel and formimg bund on either side and depositing on banks inlcuding jungle claerance ect., complete
Sub - Estimate for Outlet
Earthwork excavation and depositing on bank with an intial lead & Lift in hard stiff clay soil as per SS 20B for foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Cement Concrete 1:3:6 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Supply & Erection of centring for RCC works including cost & conveyance and labour charges for Placing in position etc complete
CC 1:2:4 mix using 20 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Sub - Estimate for Bathing ghat
Earthwork excavation and depositing on bank with an intial lead & Lift in hard stiff clay soil as per SS 20B for foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Supply & Erection of centring for RCC works including cost & conveyance and labour charges for Placing in position etc complete
CC 1:3:6 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Provision for Name board
Privision for Photo charges
Providing Cycle stand @ S.Ogaiyur Govt. Higher secondary school
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Granothick flooring c.c 1:2:4, 10-12 mm metal including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Brick work in c.m 1:5, Using country bricks including labour charges for etc complete .
Plasrting 1:5, 12 mm thick including complying with standard speficiation including all labour charges etc.complete.
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete
Provision for GI Sheet Labour Chrges
GI Sheets roof top sheet
50 mm dia ms pipe
2 1/2 x 1 1/2 mm L Angle
Provision for GI Sheet L Angle Bolt Nuts and Fixing for Labour Chrges
Provision for painting Pipes and angles etc
Provision for Name board charges
Provision for photographic charges
REPORT TO ACCOMPANY THE DETAILED ESTIMATE FOR Providing New Bore well with New tank and motor arrangements at @ Cremation Shed in S.Ogayur
Cost of Geophysical Investigation Charges
Cost of 165mm dia PVC Casing pipe.
Drilling of borewell in Hard rock area anywhere in Tamilnadu using rotary rig are to be used. up to 60.00 m depth
Construction of Pedastal for HDPE tank as per TWAD Board Type Design and Tap Fountion Point pedestal
Construction of Pedastal for Ms kioskas per TWAD Board Type Design
Supply and Delivery of HDPE Tank of 2000 Litres Capacity as per IS specification with ISI mark including Transportation charges etc, Complete.
Supply and Delivery of MS KIOSK of size 0.75 x 0.75 x 0.45 m using 16 guage thick MS sheet with 40 x 40 x 6 mm steel angles for fixing of meter board,switch board with MS door, lock and key including painting etc, complete.
Supply and delivery of wet type submersible pump set confiming to IS 8034/89 with ISI marking along with 1.5 sq mm cable (to 5m length ) suitable for installation in 1500mm dia bore including transportion charge etc complete (100x30m) 2HP
Supply and Delivery of Panel board suitable for above pump set with all accessories as per TE rules with IS Specifications etc, complete.2HP
Supply and delivery of 2.5 sq mm MM PVC insulated and PVC sheathered 3 core flat type copper cable confirming to IS 694/77 with ISI mark
Supply and Delivery of 25mm HDPE hose pipes as per IS 123990
Supply and Delivery of 20 mm dia B class GI Pipes as per IS 123990
Supply and Delivery of 20 mm dia GI Bend heavy.
Supply and Delivery of 20 mm dia GI Flange set
Supply and Delivery of 20 mm dia Gate valve
Supply and Delivery of 160mm dia borewell cover as per specification.
7/20 Service Copper wire
32 Amps fuse carrier 440 V
Teak wood board 40x30
40 w Bulb holder
Swith (15Amps)
Supply and Delivery of 20 mm dia B class GI Pipes as per IS 123990 service pipe
supply of Neylone rope
Labour charges for Erection of Submersible pump set in deep borewell including connection of submersible pump set with submersible cable and GI pipesand specials with all incidental chares etc, complete.
Provision for EB Service connection charges
provision for Soak pit for TWAD type desion and all etc.
Provision for Name board charhges
Provision for Photographic charges
Construction of Weir @ Unjaliamman Kovil Eri in S.Ogaiyur Panchayat
Earthwork excavation for foundation in all soils except hard rock and full depth as directed by the departmental officers requaring blastering including, shoring, shutting,balming out water wherever necessary etc.Complete as per standard specification.
Supplying and filling in foundation and basement with clean M sand in layer of not more than 15cm thick well rammed watered and compacted etc.Complete complying with standard specication
Providing plaincement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and convayance of all labour charges etc complete
Centering for soffits of reinforced cement concrete slab for plain surface including strutting unto 3m height using MS Sheets of size 90X60cm and PG 10gauge stiffened with MS Angles of size 25X25X3mm laid over silver oak joist of size 10cmX6.5cm, spaced a
Centering for soffits of reinforced cement concrete slab for plain surface including strutting unto 3m height using MS Sheets of size 90X60cm and PG 10gauge stiffened with MS Angles of size 25X25X3mm laid over silver oak joist of size 10cmX6.5cm, spaced a
Providing plaincement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and convayance of all labour charges etc complete
Providing plaincement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and convayance of all labour charges etc complete
Provision for Name board charges
Providiing Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Vela Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .