| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.7 L+₹4.8 L (17.2%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹23,400
Closing Date
6 Feb 2025, 2:00 pmClosed
CE/TTPS
CE/TTPS/THOOTHUKUDI
SUPPLY ERECTION AND COMMISSIONING OF 300 NB QUICK FILLING INTERCONNECTION PIPE LINE and FITTINGS FOR COOLING WATER TUNNEL OF UNIT II TO III IN CWPH I
2025_EB_519670_1
CE/TTPS/4154M
Open Tender
Miscellaneous Works
Works
90 days
TTPS
As per NIT
4 documents required · 4 mandatory
₹0
₹23,400
Yes
17 Jul 2025
22 Jan 2025
7 Feb 2025
22 Jan 2025
6 Feb 2025
22 Jan 2025
Supply of 300NB Quick filling / Interconnection pipe line & fillings for cooling water Tunnel of unit II to III Cooling Water pump House I. Material: SS 316 Gr
300 NB Spool piece of length 6500 mm, pipe thick 12 mm
300 NB Spool piece of length 1000 mm, pipe thick 12 mm
300 NB 90O Bend with flanges at both side ends of length 1200mm
300 NB Gate valve as per the technical specification enclosed
Erection and Commissioning of 300NB Quick filling / Interconnection pipe line & fillings for cooling water Tunnel of unit II to III Cooling Water pump House I. Consists of: 1. 300 NB Spool piece of length 6500 mm, pipe thick 12 mm – 1No 2.300 NB Spool piece of length 1000 mm, pipe thick 12 mm – 1 No 3.300 NB 90O Bend with flanges at both side ends of length 1200mm-2 Nos 4.300 NB Gate valve - 2 Nos
jupiter Traders (BID ID -1244984)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .