Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.9 LAccepted-AOC | ₹91.9 L Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.1 Cr+₹4.2 L (3.88%)Rejected-Finance | ₹1.1 Cr+₹4.2 L (3.88%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹1.2 Cr+₹13.3 L (12.2%)Rejected-Finance | ₹1.2 Cr+₹13.3 L (12.2%) | L3 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | Akanksha Construction L3 | N.H.CONSTRUCTION L1 | Sri Supreme Engineering L2 |
|---|---|---|---|---|---|---|
| 10.00 | Manufacturing,Laying of GPC paver blocks | 1 | Nos | 12.6 ₹70,05,133.13 | 2.33 ₹63,66,210.24 Lowest | 6.3 ₹66,13,194.07 |
| 20.00 | DSR 2018 ITEMS | 1 | Nos | 18 ₹51,67,459.54 | 2.33 ₹44,81,238.43 Lowest | 6.3 ₹46,55,092.79 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
2 Dec 2025, 3:00 pmClosed
DGM (CnM CPG-2)
USSC CPG-2, Naya Raipur
Manufacturing and laying of M40 grade Geo Polymer Concrete paver blocks 60 mm thick at various locations at NTPC Solapur
2025_NTPC_102354_1
NTPC/USSC-CPG2/9900314094
Limited
Miscellaneous Works
Works
365 days
1045-Solapur Super Thermal Power Project
2 documents required · 2 mandatory
₹0
₹1 L
27 Dec 2025
25 Nov 2025
4 Dec 2025
25 Nov 2025
2 Dec 2025
25 Nov 2025
25 Nov 2025 - 29 Nov 2025
Amount
Manufacturing,Laying of GPC paver blocks
DSR 2018 ITEMS
Sri Supreme Engineering (BID ID -278344)
Akanksha Construction (BID ID -278357)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TD9900314094.rar
Tender Documents • 22.86 MB
BOQ_105551.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .