Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹11.3 L
EMD Value
₹1.1 L
Closing Date
23 Jun 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
Zone-3, Tajganj, Ward No. 02 Construction of C.C. flooring from Indrajit house to Badan house in Tundpura Nai Abadi.
2026_DOLBU_1160844_1
02-06-2026/NAGAR NIGAM AGRA/23-06-2026/168
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
NAGAR NIGAM
₹1.1 L
1 Aug 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. 15.23.2 For thickness of tiles above 25 mm and up to 40 mm. DSR Code No. 15.23 ka 15.23.2 Page No. 241 | 688.5 | Sqm | 86.43 | ₹59,507.06 |
| 2 | 1:5:10 (1 cement: 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources) DSR Code No. 4.1.10 Page No. 103 | 68.85 | cum | 4,970.28 | ₹3,42,203.78 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand) DSR Code No. 6.1.1 Page No. 127 | 26.98 | cum | 5,619.95 | ₹1,51,626.25 |
| 4 | Cement plaster in fine sand :
12mm cement plaster of mix : 1:4 (1 cement : 4 fine sand) DSR Code No. 13.1.1 Page No. 217 | 255 | sqm | 264.62 | ₹67,478.1 |
| 5 | 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). DSR Code No. 4.1.3 Page No. 103 | 68.85 | cum | 6,006.57 | ₹4,13,552.34 |
| 6 | Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) | 15 | Nos | 500 | ₹7,500 |
| 7 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) | 10 | Nos | 2,500 | ₹25,000 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). DSR Code No. 5.1.3 Page No. 113 | 1.52 | cum | 6,544.64 | ₹9,947.85 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR Code No. 5.22.6 Page No. 118 | 1.19 | Kg | 8,223 | ₹9,785.37 |
| 10 | CARRIAGE OF MATERIALS By Mechanical Transport including loading, unloading and stacking. DSR Code No. 1.1.2 Page No. 83 | 68.85 | cum | 302.03 | ₹20,794.77 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_2175625.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .