Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.3 LAccepted-AOC | ₹56.3 L | L1 | Accepted-AOC Lowest rate |
| 2 | L2₹56.6 LRejected-Finance | ₹56.6 L | L2 | Rejected-Finance Highest rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical PAN not submitted |
| Sl No | Description | Qty | Unit | BASANTA KUMAR KAKATI L1 | JAHURUL HOQUE L2 |
|---|---|---|---|---|---|
| 1.00Construction of new pond | |||||
| 1.01 | Item No.1/APWD/3.6:- Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres | 67,178.81 | Cum | 78.54 ₹52.8 L | 78.96 ₹53.0 L |
| 1.02 | Item 2; Cost of signboard | 1 | No | 3,927 ₹3,927 | 3,948 ₹3,948 |
| 2.00Construction of new pond | |||||
| 2.01 | Item No.1/DF/1D:- Clearance of different types and nature of Water Hyacinth, Aquatic weeds, Taranies, Dalanies, Pitanies, repeated vegetation etc. from Beels / Tanks / Ponds / swampy and marshy areas dragging manually / mechanically / through machinery etc. with necessary ropes, bamboos, chains and other debries devices etc. making patches, cutting into pieces with the help of knifes / sickles / sews as necessary and depositing and stocking in the marginal areas of the beels / tanks / ponds / swampy and marshy areas in a regular form of bundhs or heaps within a lead of 100 mts. and lift up to 250 cm as per direction of the deptt. etc. complete (pushing out the patches or pieces of vegetations may also be made through the connecting channels with the river and burning the lifted vegetation after sunshine as and when applicable). | 18,900 | Cum | 10.31 ₹1.9 L | 10.34 ₹2.0 L |
| 2.02 | Item No.2/DF/2:- Bailing out accumulated water from the Tank/Pond/Beel/Swampy and Marshy areas with help of power pump machines to expose the bed to sunshine till suitable for excavation in the form of earth as per direction and requirement of the deptt. etc. complete including the cost of transportation of power pump machine. | 39,547.12 | No | 3.93 ₹1.6 L | 3.94 ₹1.6 L |
| 2.03 | Item 2; Cost of signboard | 1 | No | 3,740 ₹3,740 | 3,760 ₹3,760 |
Tender Value
₹71.7 L
EMD Value
₹1.4 L
Closing Date
25 Feb 2026, 2:00 pmClosed
District Fishery Devt. Officer, Kamrup
O/o the DFDO, Kamrup
Construction of New Pond Renovation of Existing Pond under SOPD G Development Approach in Fisheries and Aquaculture through Cluster based Initiatives SOPD for the year 2025 26 in Kamrup Amingaon District
2026_FD_50826_1
AFKG.646/2025-26/835
Open Tender
Civil Works
90 days
Kamrup
Please, refer bid document
4 documents required · 4 mandatory
₹1,434
₹1.4 L
Yes
11 Mar 2026
5 Feb 2026
25 Feb 2026
5 Feb 2026
25 Feb 2026
7 Feb 2026
Construction of new pond
Item No.1/APWD/3.6:- Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres
Item 2; Cost of signboard
Construction of new pond
Item No.1/DF/1D:- Clearance of different types and nature of Water Hyacinth, Aquatic weeds, Taranies, Dalanies, Pitanies, repeated vegetation etc. from Beels / Tanks / Ponds / swampy and marshy areas dragging manually / mechanically / through machinery etc. with necessary ropes, bamboos, chains and other debries devices etc. making patches, cutting into pieces with the help of knifes / sickles / sews as necessary and depositing and stocking in the marginal areas of the beels / tanks / ponds / swampy and marshy areas in a regular form of bundhs or heaps within a lead of 100 mts. and lift up to 250 cm as per direction of the deptt. etc. complete (pushing out the patches or pieces of vegetations may also be made through the connecting channels with the river and burning the lifted vegetation after sunshine as and when applicable).
Item No.2/DF/2:- Bailing out accumulated water from the Tank/Pond/Beel/Swampy and Marshy areas with help of power pump machines to expose the bed to sunshine till suitable for excavation in the form of earth as per direction and requirement of the deptt. etc. complete including the cost of transportation of power pump machine.
Item 2; Cost of signboard
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Biddocument.pdf
Tender Documents • 1.43 MB
BOQ_80933.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid