| 1 | L1₹6.0 CrAdmitted-Finance 21 PASCHIM VIHAR EXTENSION NEW DELHI 110063 | WEST | DELHI | 110063 | ₹6.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.5 CrAdmitted-Finance 02 AB ADGAONKAR PLAZA NEAR ABB CIRCLE MAHATMA NAGAR NASHIK 422 007 MAHARASHTRA | NASHIK | MAHARASHTRA | 422007 | ₹6.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.6 CrAdmitted-Finance | ₹6.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹7.4 CrAdmitted-Finance | ₹7.4 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical NOT SPECIFIED | - | - | Rejected-Technical Not Eligible, Please refer recommendation of TSC |
| Sl No | Description | Qty | Unit | P L ADKE L2 | M/s R. K. Bhambri L1 | M/s. Vinod Mutha L3 | M/s R.L.PAREEK L4 |
|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I (A) - Sewage Treatment Plant including Electrical and Mechanical works on EPC mode including scope of work defined under Annexure-I & II Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only | |||||||
| 1.10 | Engineering, Procurement & Construction (EPC) of entire scheme of Packaged Sewage Treatment Plant (STP) 240 KLD capacity at Station workshop ,including Design, supply, installation, testing, commissioning and operation in all respects, including civil infrastructure works, mechanical equipment, electrical installations, instrumentation, automation, internal/external piping, cabling, testing and commissioning,other allied equipment for STP as per OEM recommendation based on latest technology to achieve the parameter as mentioned in scope of work ; along with its earthwork excavation and including all internal services like water supply services and electric supply services beyond transformer for satisfactory running of plant including comprehensive maintenance for 05 years (including 2 years of Defect Liability Period) from the date of completion of works . | 1 | Lump Sum | 1,58,47,636 ₹1.6 Cr | 1,65,00,000 ₹1.6 Cr | 1,50,00,000 ₹1.5 Cr | 2,30,00,000 ₹2.3 Cr |
| 1.20 | Engineering, Procurement & Construction (EPC) of entire scheme of Packaged Sewage Treatment Plant (STP) 70 KLD capacity at Lulla nagar, including Design, supply, installation, testing, commissioning and operation in all respects, including civil infrastructure works, mechanical equipment, electrical installations, instrumentation, automation, internal/external piping, cabling, testing and commissioning,other allied equipment for STP as per OEM recommendation based on latest technology to achieve the parameter as mentioned in scope of work ; along with its earthwork excavation and including all internal services like water supply services and electric supply services beyond transformer for satisfactory running of plant including comprehensive maintenance for 05 years (including 2 years of Defect Liability Period) from the date of completion of works . | 2 | Lump Sum | 90,18,604 ₹1.8 Cr | 1,10,00,000 ₹2.2 Cr | 1,00,00,000 ₹2 Cr | 1,30,50,000 ₹2.6 Cr |
| 1.30NOTES: (a) The design wherever applicable should follow latest CPHEEO Manual, NGT, State Polution Control Board guidelnes, latest policy directions issued E-in-C's Branch Policy No 03/ 2025 Issued vide letter No. A/95533/SCADA Sewage/Policy/E2W (PPC) dt 16 Jul 2025. (b) The bidder shall also consider BOQ (Sch 'A') Notes and all internal & external services as defined in Annexure-I & II complete as detailed in scope of work and other documents of tender, complete all as specified and directed. | |||||||
| 2.00SCH 'A' PART-I(A) & V: Note: These schedules are pre-priced by MES and the rate indicated " under Col 6 signifies this fact only | |||||||
| 3.00 | Total amount of Sch 'A' Part-I (B) (Building/ Structures) | 1 | LUMP SUM | 31,56,937 ₹31.6 L | 36,00,000 ₹36 L | 24,80,000 ₹24.8 L | 31,00,000 ₹31 L |
| 4.00 | Total amount of Sch 'A' Part-II (Internal Water Supply) | 1 | LUMP SUM | 54,327 ₹54,327 | 60,000 ₹60,000 | 30,000 ₹30,000 | 95,559 ₹95,559 |
| 5.00 | Total amount of Sch 'A' Part-III (Internal Electrification) | 1 | LUMP SUM | 2,12,636 ₹2.1 L | 2,00,000 ₹2 L | 1,60,000 ₹1.6 L | 3,03,000 ₹3.0 L |
| 6.00 | Total amount of Sch ‘A’ Part IV (Sewage Line ) | 1 | Lump Sum | 92,95,066 ₹93.0 L | 95,00,000 ₹95 L | 96,00,000 ₹96 L | 73,00,000 ₹73 L |
| 7.00 | Total amount of Sch ‘A’ Part V (Site Clearance, Excavation & Earthwork) | 1 | Lump Sum | 42,25,056 ₹42.3 L | 35,00,000 ₹35 L | 39,00,000 ₹39 L | 18,00,000 ₹18 L |
Updated dates
Tender Value
₹7.4 Cr
EMD Value
₹7.0 L
Closing Date
21 May 2026, 6:00 pmClosed
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) FOR SEWAGE TREATMENT WORK SYSTEM AT MAP PHASE-II UNDER GE (SOUTH) PUNE
2026_MES_755211_1
84657
Open Tender
Miscellaneous Works
365 days
Garrison Engineer (South) Pune
Class A and PQC criteria as per NIT
8 documents required · 8 mandatory
₹3,000
Garrison Engineer (South) Pune
₹7.0 L
Yes
20 Jun 2026
5 Mar 2026
28 May 2026
5 Mar 2026
21 May 2026
7 May 2026
6 Mar 2026 - 13 Mar 2026
SCHEDULE 'A' PART-I (A) - Sewage Treatment Plant including Electrical and Mechanical works on EPC mode including scope of work defined under Annexure-I & II Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only
Engineering, Procurement & Construction (EPC) of entire scheme of Packaged Sewage Treatment Plant (STP) 2.4 MLD capacity at Station workshop ,including Design, supply, installation, testing, commissioning and operation in all respects, including civil infrastructure works, mechanical equipment, electrical installations, instrumentation, automation, internal/external piping, cabling, testing and commissioning,other allied equipment for STP as per OEM recommendation based on latest technology to achieve the parameter as mentioned in scope of work ; along with its earthwork excavation and including all internal services like water supply services and electric supply services beyond transformer for satisfactory running of plant including comprehensive maintenance for 05 years (including 2 years of Defect Liability Period) from the date of completion of works .
Engineering, Procurement & Construction (EPC) of entire scheme of Packaged Sewage Treatment Plant (STP) 0.7 MLD capacity at Lulla nagar, including Design, supply, installation, testing, commissioning and operation in all respects, including civil infrastructure works, mechanical equipment, electrical installations, instrumentation, automation, internal/external piping, cabling, testing and commissioning,other allied equipment for STP as per OEM recommendation based on latest technology to achieve the parameter as mentioned in scope of work ; along with its earthwork excavation and including all internal services like water supply services and electric supply services beyond transformer for satisfactory running of plant including comprehensive maintenance for 05 years (including 2 years of Defect Liability Period) from the date of completion of works .
NOTES: (a) The design wherever applicable should follow latest CPHEEO Manual, NGT, State Polution Control Board guidelnes, latest policy directions issued E-in-C's Branch Policy No 03/ 2025 Issued vide letter No. A/95533/SCADA Sewage/Policy/E2W (PPC) dt 16 Jul 2025. (b) The bidder shall also consider BOQ (Sch 'A') Notes and all internal & external services as defined in Annexure-I & II complete as detailed in scope of work and other documents of tender, complete all as specified and directed.
SCH 'A' PART-I(A) & V: Note: These schedules are pre-priced by MES and the rate indicated " under Col 6 signifies this fact only
Total amount of Sch 'A' Part-I (B) (Building/ Structures)
Total amount of Sch 'A' Part-II (Internal Water Supply)
Total amount of Sch 'A' Part-III (Internal Electrification)
Total amount of Sch ‘A’ Part IV (Sewage Line )
Total amount of Sch ‘A’ Part V (Site Clearance, Excavation & Earthwork)
SCHEDULE 'A' PART-VI (MISC B/R AND E/M WORKS) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only.
S&F 100 mm thick factory made Steel fibre reinforced manhole frame and cover size as 1.20 m x 0.60 m all as specified and directed by Engineer-in-Charge
Manning and Operation of Sewage Treatment Plants including continuous operation of all associated installations, pumps, blowers, valves, electrical panels, instrumentation, and civil structures; supply of all required consumables, chemicals, lubricants, and spares; routine, preventive, and breakdown maintenance; maintaining records and laboratory testing with two shifts of 8 Hours per day including Sunday & Holiday by employing one skilled operator for 02 Nos STP of capacity 70 Cum/Day and one skilled operator for 01 Nos STP of capacity 240 Cum/Day per shift and maintaining desired level of BOD,COD,TSS,TKN & pH by dosing or required quantity of chemical as per OEM reccomendation for 05 years (including 02 years of Defects liability period) after completion of mile stone 2 complete all as specified in Particular Specifications and as directed by the Engineer-in-Charge.
All as per BOQ item No 11 for 11 Month after completion of Mile stone 2
All as per BOQ item No 11 for 11 Month after completion of Mile stone 3
All as per BOQ item No 11 for 11 Month after completion of Mile stone 4
All as per BOQ item No 11 for 11 Month after completion of Mile stone 5
All as per BOQ item No 11 for 11 Month after completion of Mile stone 6
All as per BOQ item No 11 for 5 Month after completion of Mile stone 7
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.90 MB
TDrawingSet2.rar
Additional Documents • 19.00 MB
TDrawingSet1.rar
Additional Documents • 21.61 MB
BOQ_845897.xls
BOQ • 0.31 MB
84657-Main-Dwg.rar
Additional Documents • 5.15 MB
84657-STP-Tender-Upload.pdf
Tender Documents • 6.75 MB
Download all tender documents and submit your bid