Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 2H 703 ANNAI THERESA NAGAR 2ND STREET TUTICORIN 628008 | TUTICORIN | TAMIL NADU | 628008 | Accepted-Technical Technical bid found satisfactory |
Tender Value
₹18.4 L
EMD Value
₹18,260
Closing Date
20 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/Generation/TNGECL/Tirunelveli
Superintending Engineer, Generation Circle, TNGECL, Maharajanagar, Tirunelveli 11
transportation rectification servicing testing and erection of the turbine shaft a shaft non uniform crack developed at flange area followed by commissioning of unit2 machine at PVSHEP1
2026_EB_645722_1
SE/G/TIN/GL/SPECN.No.12/25-26
Open Tender
Miscellaneous Works
Works
30 days
PVSHEP I
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,260
Yes
28 Feb 2026
22 Jan 2026
21 Feb 2026
22 Jan 2026
20 Feb 2026
22 Jan 2026
Transportation charges for to-and-fro transportation (round trip) of the entire runner shaft with runner blade assembly between the powerhouse and the work site, including loading, unloading, and safe handling, along with charges for design, fabrication, and preparation of a suitable supporting stand/cradle to ensure safe and stable transportation of the runner shaft assembly of approximately 9m length and 10 ton`s weight.
Rectification of a 360° circumferential crack, as detected by Ultrasonic Testing (UT), in the runner shaft flange of 800 mm outer diameter and 200 mm thickness, located near the centre bore, where the crack depth is non-uniform and ranges from approximately 10 mm to 50 mm, with maximum crack propagation observed above the centre bore region, comprising complete excavation of the cracked zone by controlled grinding and gouging until sound parent metal is achieved, proper edge preparation of uneven and extensive crack areas using appropriate V-groove or U-groove profiles based on material thickness and accessibility, thorough cleaning of the prepared surfaces to remove oil, grease, moisture, rust, carbon deposits, and other contaminants, grinding of the flange surface to eliminate forging laps and surface discontinuities, followed by refilling of the excavated area through controlled micro-welding using approved welding procedures and consumables, and final grinding and profiling after welding to restore the original flange geometry, including preparation of the flange groove area and eight (8) flange bolt bore locations affected by cracking.
Charges for carrying out Ultrasonic Testing (UT), run-out measurement, face-out measurement, and dynamic balancing of the entire shaft assembly, comprising the A-shaft and B-shaft coupled with the runner blade assembly, including all necessary instruments, setups, and measurements to ensure compliance with specified tolerances and operational requirements
ASSEMBLING (i) Labour charges for assembling the LOS unit complete with the gearbox unit, including positioning, leveling, and preliminary alignment. (ii) Labour charges for assembling the runner shaft and intermediate shaft, including fitting of all associated accessories, keys, fasteners, and mounting hardware. (iii) Labour charges for assembling the intermediate shaft with roller bearings, including bearing installation, seating, and connection with turbine-side components. (iv) Labour charges for assembling the runner shaft with runner and coupling, including proper tightening, locking arrangements, and inspection. (v) Labour charges for assembling and fixing the slow-speed coupling and high-speed coupling, including coupling alignment checks. (vi) Labour charges for assembling and refixing the turbine head covers along with all related accessories, gaskets, and sealing arrangements (vii) Labour charges for turbine-side alignment with the runner shaft (including runner) and precision alignment with the intermediate shaft. (viii) Labour charges for coupling the runner shaft and intermediate shaft, ensuring correct alignment with the gearbox input shaft. (ix) Labour charges for gearbox alignment with turbine shaft, alignment of associated turbine accessories, and refixing/ alignment with the respective generator. (x) Supply and replacement of damaged or unserviceable bolts, nuts, and fasteners required during assembly. (xi) Labour charges for vibration analysis calibration through TNGECL, performance monitoring, and successful commissioning, including completion of a continuous 72-hour trial run test.
Fabrication of Shaft A and B coupling bolt (As per sample)
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
SPCN12.pdf
Tender Documents • 0.95 MB
BOQ_773985.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .