| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 CrAccepted-AOC 3RD FLOOR FLAT NO 302 DOOR NO 6 3 347 22 6 SRI DURGA TULASI APARTMENT DWARAKAPURI COLONY PUNJAGUTTA HYDERABAD TELANGANA 500082 | HYDERABAD | HYDERABAD | TELANGANA | 500082 | L1 | Accepted-AOC Being L1 tender accepted | |
| 2 | L2₹11.6 Cr+₹66.8 L (6.13%)Rejected-Finance VV 54 A PARTHIVI PROVINCE SARONA SARONA RAIPUR CHHATTISGARH 492001 | RAIPUR | CHHATTISGARH | 492001 | L2 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | HR SQUARE PRIVATE LIMITED L1 | Infinity Engineering Solutions L2 |
|---|---|---|---|---|---|
| 1.00 | Design, procurement, construction, commissioning, solid waste management facility for recycling of dry, wet and other waste for daily guaranteed Acceptable Waste of Bikaner station as given in waste generation details of Bikaner at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population as given in waste generation details of Bikaner) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening, shorting, separation of recyclable/ non recyclables/ RDF/ Inert from the solid waste and monitoring through SCADA complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the remaining materials after recycling (if any) at given area within the A-1 land without any extra cost to the Department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed/sheds.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of observer room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator.
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period. | 1 | Job | 4,68,69,890 ₹4,68,69,890 Lowest | 5,18,69,890 ₹5,18,69,890 |
| 2.00Srl Item No 1.001 Continued...... (i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting. (j) Obtain statutory clearance from Government. (k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials recycled/extracted from solid waste. No royalty shall be charged by the Government. (l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department (m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: - (i) After Finalisation of detail project report- Nil (ii) After Creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period) (iii) After completion of 1 year of comprehensive maintenance: 72% (iv) After completion of 2 year of comprehensive maintenance: 74% (v) After completion of 3 year of comprehensive maintenance: 76% (vi) After completion of 4 year of comprehensive maintenance: 79% (vii) After completion of 5 year of comprehensive maintenance: 82% (viii) After completion of 6 year of comprehensive maintenance: 85% (ix) After completion of 7 year of comprehensive maintenance: 88% (x) After completion of 8 year of comprehensive maintenance: 92% (xi) After completion of 9 year of comprehensive maintenance: 96% (xii) After completion of 10 year of comprehensive maintenance: 100% | |||||
| 3.00Srl Item No 1.00 Continued...... The retention money shall be as applicable. | |||||
| 4.00 | Design, procurement, construction, commissioning, solid waste management facility for recycling of dry, wet and other waste for daily guaranteed Acceptable Waste of Suratgarh station as given in waste generation details of Bikaner at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population as given in waste generation details of Suratgarh) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening, shorting, separation of recyclable/ non recyclables/ RDF/ Inert from the solid waste and monitoring through SCADA complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the remaining materials after recycling (if any) at given area within the A-1 land without any extra cost to the Department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed/sheds.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of observer room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator.
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period. | 1 | Job | 4,42,22,690 ₹4,42,22,690 Lowest | 4,58,22,690 ₹4,58,22,690 |
| 5.00Srl Item No 2.00 Continued...... (i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting. (j) Obtain statutory clearance from Government. (k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials recycled/extracted from solid waste. No royalty shall be charged by the Government. (l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department (m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: - (i) After Finalisation of detail project report- Nil (ii) After Creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period) (iii) After completion of 1 year of comprehensive maintenance: 72% (iv) After completion of 2 year of comprehensive maintenance: 74% (v) After completion of 3 year of comprehensive maintenance: 76% (vi) After completion of 4 year of comprehensive maintenance: 79% (vii) After completion of 5 year of comprehensive maintenance: 82% (viii) After completion of 6 year of comprehensive maintenance: 85% (ix) After completion of 7 year of comprehensive maintenance: 88% (x) After completion of 8 year of comprehensive maintenance: 92% (xi) After completion of 9 year of comprehensive maintenance: 96% (xii) After completion of 10 year of comprehensive maintenance: 100% | |||||
| 6.00Srl Item No 2.00 Continued...... The retention money shall be as applicable. | |||||
| 7.00 | Lump sum price worked out by the tenderer for “EXTERNAL ELECTRIC SUPPLY WORKS" as listed in Schedule ‘A’ Part-III | 1 | Lumpsum | 11,36,292 ₹11,36,292 Lowest | 11,36,292 ₹11,36,292 Lowest |
| 8.00Schedule ‘A’ Part -III (EXTERNAL ELECTRIC SUPPLY WORKS) | |||||
| 9.00 | Supply, laying of Double wall corrigated pipe of outer dia 63 mm and inner dia 50 mm for cable protection complete all as specified and directed by Engineer - In - Charge. | 740 | RM | 350 ₹2,59,000 Lowest | 350 ₹2,59,000 Lowest |
| 10.00 | Supply, laying of Double wall corrigated pipe of outer dia 110 mm and inner dia 93 mm for cable protection complete all as specified and directed by Engineer - In - Charge. | 240 | RM | 730 ₹1,75,200 Lowest | 730 ₹1,75,200 Lowest |
Tender Value
₹10.9 Cr
EMD Value
₹8.3 L
Closing Date
7 Mar 2026, 6:00 pmClosed
Chief Engineer Bathinda zone
HQ CE Bathinda Zone, Bathinda Mil Stn-151004
PROVISION OF SOLID WASTE MANAGEMENT PLANT AT BIKANER AND SURATGARH MIL STATION UNDER EPC MODE
2025_MES_743296_2
PROVISION OF SOLID WASTE MANAGEMENT PLANT AT BIKANER AND SURATGARH ON EPC MODE.
Open Tender
Civil Works
Lump-sum
4015 days
Bikaner and suratgarh
As per NIT
8 documents required · 8 mandatory
₹3,000
GE (P) Bikaner
₹8.3 L
Yes
26 Mar 2026
20 Feb 2026
9 Mar 2026
20 Feb 2026
7 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, procurement, construction, commissioning, solid waste management facility for recycling of dry, wet and other waste for daily guaranteed Acceptable Waste of Bikaner station as given in waste generation details of Bikaner at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population as given in waste generation details of Bikaner) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening, shorting, separation of recyclable/ non recyclables/ RDF/ Inert from the solid waste and monitoring through SCADA complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the remaining materials after recycling (if any) at given area within the A-1 land without any extra cost to the Department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed/sheds.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of observer room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator.
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period. | 1 | Job | - | - |
| 2 | Srl Item No 1.001 Continued......
(i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting.
(j) Obtain statutory clearance from Government.
(k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials recycled/extracted from solid waste. No royalty shall be charged by the Government.
(l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department
(m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: -
(i) After Finalisation of detail project report- Nil
(ii) After Creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period)
(iii) After completion of 1 year of comprehensive maintenance: 72%
(iv) After completion of 2 year of comprehensive maintenance: 74%
(v) After completion of 3 year of comprehensive maintenance: 76%
(vi) After completion of 4 year of comprehensive maintenance: 79%
(vii) After completion of 5 year of comprehensive maintenance: 82%
(viii) After completion of 6 year of comprehensive maintenance: 85%
(ix) After completion of 7 year of comprehensive maintenance: 88%
(x) After completion of 8 year of comprehensive maintenance: 92%
(xi) After completion of 9 year of comprehensive maintenance: 96%
(xii) After completion of 10 year of comprehensive maintenance: 100% | - | - | - | - |
| 3 | Srl Item No 1.00 Continued......
The retention money shall be as applicable. | - | - | - | - |
| 4 | Design, procurement, construction, commissioning, solid waste management facility for recycling of dry, wet and other waste for daily guaranteed Acceptable Waste of Suratgarh station as given in waste generation details of Bikaner at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population as given in waste generation details of Suratgarh) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening, shorting, separation of recyclable/ non recyclables/ RDF/ Inert from the solid waste and monitoring through SCADA complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the remaining materials after recycling (if any) at given area within the A-1 land without any extra cost to the Department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed/sheds.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of observer room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator.
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period. | 1 | Job | - | - |
| 5 | Srl Item No 2.00 Continued......
(i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting.
(j) Obtain statutory clearance from Government.
(k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials recycled/extracted from solid waste. No royalty shall be charged by the Government.
(l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department
(m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: -
(i) After Finalisation of detail project report- Nil
(ii) After Creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period)
(iii) After completion of 1 year of comprehensive maintenance: 72%
(iv) After completion of 2 year of comprehensive maintenance: 74%
(v) After completion of 3 year of comprehensive maintenance: 76%
(vi) After completion of 4 year of comprehensive maintenance: 79%
(vii) After completion of 5 year of comprehensive maintenance: 82%
(viii) After completion of 6 year of comprehensive maintenance: 85%
(ix) After completion of 7 year of comprehensive maintenance: 88%
(x) After completion of 8 year of comprehensive maintenance: 92%
(xi) After completion of 9 year of comprehensive maintenance: 96%
(xii) After completion of 10 year of comprehensive maintenance: 100% | - | - | - | - |
| 6 | Srl Item No 2.00 Continued......
The retention money shall be as applicable. | - | - | - | - |
| 7 | Lump sum price worked out by the tenderer for “EXTERNAL ELECTRIC SUPPLY WORKS" as listed in Schedule ‘A’ Part-III | 1 | Lumpsum | 11,36,292.84 | ₹11,36,292.84 |
| 8 | Schedule ‘A’ Part -III (EXTERNAL ELECTRIC SUPPLY WORKS) | - | - | - | - |
| 9 | Supply, laying of Double wall corrigated pipe of outer dia 63 mm and inner dia 50 mm for cable protection complete all as specified and directed by Engineer - In - Charge. | 740 | RM | - | - |
| 10 | Supply, laying of Double wall corrigated pipe of outer dia 110 mm and inner dia 93 mm for cable protection complete all as specified and directed by Engineer - In - Charge. | 240 | RM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
tendercomplete.pdf
Tender Documents • 1.34 MB
BOQ_843973.xls
BOQ • 0.35 MB
REVISEDNIT.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .