Tender Value
Refer Docs
Closing Date
21 Dec 2021, 2:00 pmClosed
Ms. Sangitta Ghuliani, GM (SCM)
EIL, GURUGRAM
VGO_HDT UNIT OF PANIPAT REFINERY EXPANSION PROJECT (P25) of IOCL
2021_REFHQ_140133_1
SG/B269-411-EP-T-9803 /1009
Global Tenders
Lump Sum TurnKey
Works
840 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
9 documents required · 9 mandatory
Exempted
AS PER TENDER DOCUMENT
7 Apr 2022
3 Sept 2021
22 Dec 2021
3 Sept 2021
21 Dec 2021
6 Nov 2021
24 Sept 2021
Amount
LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, updation of FEED Package, Detailed Design and Engineering, 3D Modeling, Hazop /Hazid, SIL , preparation and submission of engineering drawings & related documentation including Asbuilt/ Final documentation providing all services and completing the work in all respects as per provision of Bidding Document. Supply of all materials including - procurement services, shop fabrication, third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc., supply of start-up / pre-commissioning / commissioning / mandatory spares,catalyst /chemicals/lubricants (Except Licensor supplied catalyst /chemicals) for first fill and 6 (six) months operation as per tech. specifications. Construction / Erection including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, erection, installation, testing, Inspection, pre-commissioning / commissioning & PGTR, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. • Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Procurement, supply, Third Party Inspection, Transportation,Port handling, Shop fabrication, Assembly, Testing of all items, equipment’s, Components, Materials, bought out items, Procurement of raw materials and sub-ordered equipment, shop fabrication/assembly, inspection, Charges for Third party inspection agency(TPIA), testing, supply of all commissioning and mandatory spares, consumables, catalyst /lubricants/ chemicals (Except Licensor supplied catalyst /chemicals) for first fill and 6 (six) months operation as per tech. specifications, special tools and tackles , receipt, accounting, storing & preservation of materials as required for work as per Bidding Document requirements for VGO_HDT Package
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
RESIDUAL PROCESS DESIGN , DETAILED ENGINEERING preparation of Datasheets, Smart plant P&IDs, PFDs, specifications for procurement, GAD, & Layouts, 3D Model, Hazop /Hazid, SIL, engineering fabrication drawings, Procurement & Construction schemes, Control Logics, Cause & Effect diagrams, Electrical System studies, Statutory approval from various Statutory state & central Government bodies, approval of drawings &documents from OWNER/EIL, submission of Final Technical documents, AS BUILT Documents and 3D Model, Pre-commissioning, Commissioning and Operating manuals for all units including packages as per Bidding Document requirements)
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Construction, installation completion of work in all respects for LSTK Package including required Cranes, Scaffolding, temporary barricading, Transportation and site handling of material/equipments, supply of consumables, tools and tackles, field engineering services, Receipt, storage, conservation, preservation of FIM and contractor supplied items etc. Fabrication, construction, assembly, erection at site for all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit, refractory, insulation, coating, painting, testing, etc. providing all temporary works/structures and equipment for completion, obtaining statutory approvals, pre-commissioning, commissioning, performance guarantee test runs, completing all the work in all respects to make system smooth, operable and handing over as per Bidding Document requirements and instructions of the Engineer In Charge
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST on supply of Indigenous goods (part break up of SP-1)
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder/Indian Member of Consortium/JV, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for Package PLC as per technical portion of bidding document & as per preamble to SOP
Lumpsum Charges for 5 yaers PWCAMC for SL.No.1.00
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for ANALYZERS (Process stream (except density, moisture, PH/conductivity), Gas Chromatograph (if applicable), Stack Gas analyser with shelter) as per technical portion of bidding document & as per preamble to SOP
Lumpsum Charges for 5 yaers PWCAMC for SL.No.2.00
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR VGO HDT PACKAGE AS PER BIDDING DOCUMENT AND SUBSEQUENT AMENDMENT, IF ANY
Power Consumption for equipment identified in Loading & Guarantee Chapter of tender
HP Steam consumption for equipment identified in Loading & Guarantee Chapter of tender
LP Steam consumption for equipment identified in Loading & Guarantee Chapter of tender
HP Steam generation in equipment identified in Loading & Guarantee Chapter of tender
MP Steam generation in equipment identified in Loading & Guarantee Chapter of tender
Cooling Water Consumption in entire VGO_HDTunit
Fuel Gas Consumption in equipment identified in Loading & Guarantee Chapter of tender
i)Refer Loading & Guarantee Criteria attached as Annexure-A-X of SCC of the Bidding document and its Amendment (if any).
ii)The guarantee values as above should be quoted in Priced Bid. Guaranteed values should not be quoted/ mentioned in the Un-priced Bid.
iii)The guarantees as quoted by bidder in this format shall be considered for price loading purpose for evaluation and award. (Refer Loading and Guarantee Chapter of tender for details).
iv)Performance Guarantee Test Run (PGTR) can be carried out on either Case 1 ( SP-8) or Case 2 ( SP-8A) and price reduction formula shall be applied as defined in Loading & guarantee document.
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR VGO HDT PACKAGE AS PER BIDDING DOCUMENT AND SUBSEQUENT AMENDMENT, IF ANY
Power Consumption for equipment identified in Loading & Guarantee Chapter of tender
HP Steam consumption for equipment identified in Loading & Guarantee Chapter of tender
LP Steam consumption for equipment identified in Loading & Guarantee Chapter of tender
HP Steam generation in equipment identified in Loading & Guarantee Chapter of tender
MP Steam generation in equipment identified in Loading & Guarantee Chapter of tender
Cooling Water Consumption in entire VGO_HDT unit
Fuel Gas Consumption in equipment identified in Loading & Guarantee Chapter of tender
i) Refer Loading & Guarantee Criteria attached as Annexure-A-X of SCC of the Bidding document and its Amendment (if any).
ii) The guarantee values as above should be quoted in Priced Bid. Guaranteed values should not be quoted/ mentioned in the Un-priced Bid.
iii)All the guarantees as quoted by bidder in this format shall only be guarantee points and shall not be considered for price loading purpose for evaluation and award.
iv)Performance Guarantee Test Run (PGTR) can be carried out on either Case 1 ( SP-8) or Case 2 ( SP-8A) and price reduction formula shall be applied as defined in Loading & guarantee document.
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Technip KT India Ltd
Tata Projects Limited
Technip KT India Ltd
Tata Projects Limited
L & T HYDROCARBON ENGINEERING LIMITED
Toyo Engineering India Private Limited
Tata Projects Limited
Technip KT India Ltd
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
L & T HYDROCARBON ENGINEERING LIMITED
Technip KT India Ltd
Tata Projects Limited
Tata Projects Limited
L & T HYDROCARBON ENGINEERING LIMITED
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Technip KT India Ltd
Tata Projects Limited
Technip KT India Ltd
Tata Projects Limited
L & T HYDROCARBON ENGINEERING LIMITED
Toyo Engineering India Private Limited
Tata Projects Limited
Technip KT India Ltd
Technip KT India Ltd
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
L & T HYDROCARBON ENGINEERING LIMITED
Technip KT India Ltd
Tata Projects Limited
Tata Projects Limited
L & T HYDROCARBON ENGINEERING LIMITED
Technip KT India Ltd
Bidder Name
Technip KT India Ltd
Toyo Engineering India Private Limited
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .