Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.0 LAdmitted-Finance | ₹87.0 L | L1 | Admitted-Finance |
| 2 | L2₹89.1 L+₹2.1 L (2.44%)Admitted-Finance | ₹89.1 L+₹2.1 L (2.44%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Papers are not in order |
| Sl No | Description | Qty | Unit | GUPTA TRADERS L1 | HETLISH A SANGMA L2 |
|---|---|---|---|---|---|
| 1.00 | RCC works
RCC Works 1:1.5:3 | 23.57 | m3 | 1,820 ₹42,899.22 Lowest | 1,830 ₹43,134.93 |
| 2.00 | Shuttering Works
Lintel,beams…cantilever | 89.4 | m2 | 2,180 ₹1,94,892 Lowest | 2,185 ₹1,95,339 |
| 3.00 | Steel Work
TMT Bar 500D | 1,439.4 | Kg | 980 ₹14,10,612 Lowest | 982 ₹14,13,490.8 |
| 4.00 | Brickwork
1 cement: 6 coarse sand | 11.15 | m3 | 1,610 ₹17,951.5 Lowest | 1,612 ₹17,973.8 |
| 5.00 | Structural steel work riveted… trusses and framed work…primer all complete. | 14,344.33 | Kg | 222 ₹31,84,441.26 Lowest | 225 ₹32,27,474.25 |
| 6.00 | False Ceiling i/c Frame work
12.5mm th. | 115.7 | m2 | 1,657 ₹1,91,714.9 Lowest | 1,660 ₹1,92,062 |
| 7.00 | 12mm thick cemt plaster
Prop. 1cement:4 sand | 196.2 | m2 | 2,450 ₹4,80,690 Lowest | 2,460 ₹4,82,652 |
| 8.00 | 15mm thick cemt plaster
Prop. 1cement:4 sand | 127.45 | m2 | 3,210 ₹4,09,114.5 Lowest | 3,220 ₹4,10,389 |
| 9.00 | Finishing work with Texture exterior paint etc.
New work | 79.45 | m2 | 1,840 ₹1,46,188 Lowest | 1,850 ₹1,46,982.5 |
| 10.00 | Painting with synthetic enamel
Two or more coat on new work | 205.7 | m2 | 1,500 ₹3,08,550 Lowest | 1,510 ₹3,10,607 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
13 Jan 2026, 1:00 pmClosed
Managing Director
Kenches Trace Shillong
Special Repair Works at JNV South West Garo Hills Meghalaya
2025_PWDSh_1889_1
44 of 15.12.2025
Open Tender
Civil Works
Item Rate
180 days
South West Garo Hills
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Managing Director, MGCC Ltd.
₹1.7 L
14 Feb 2026
17 Dec 2025
13 Jan 2026
17 Dec 2025
13 Jan 2026
17 Dec 2025
RCC works RCC Works 1:1.5:3
Shuttering Works Lintel,beams…cantilever
Steel Work TMT Bar 500D
Brickwork 1 cement: 6 coarse sand
Structural steel work riveted… trusses and framed work…primer all complete.
False Ceiling i/c Frame work 12.5mm th.
12mm thick cemt plaster Prop. 1cement:4 sand
15mm thick cemt plaster Prop. 1cement:4 sand
Finishing work with Texture exterior paint etc. New work
Painting with synthetic enamel Two or more coat on new work
Pre-coated galvanized iron sheet Dyna Roof 0.50mm th
PCGS Ridging 0.5mm th. Ridges Plain
Brick Flooring 1cement: 6 coarse sand
CC Floorig 1:2:4 40mm th. With 20mm nominal size S.A.
Vitrified floor tiles Size 500 x 500mm
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
BOQ_2050.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .