| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.5 LAccepted-AOC CHINCHANI TALUKA KADEGAON DISTRICT SANGLI MAHARASHTRA | SANGLI | MAHARASHTRA | 415301 | ₹30.5 L | L-1 | Accepted-AOC Accepted |
| 2 | L-2₹30.8 LRejected-AOC JADHAV MALA ASAD TA KADEGAON DIST SANGLI | KADEGAON | SANGLI | MAHARASHTRA | 415303 | ₹30.8 L | L-2 | Rejected-AOC Rejected |
| 3 | L-3₹31.6 LRejected-AOC | ₹31.6 L | L-3 | Rejected-AOC Rejected |
| 4 | L-4₹33.3 LRejected-AOC | ₹33.3 L | L-4 | Rejected-AOC Rejected |
| 5 | L-5₹39.4 LRejected-AOC | ₹39.4 L | L-5 | Rejected-AOC Rejected |
Tender Value
₹39.8 L
EMD Value
₹39,800
Closing Date
8 Apr 2026, 11:00 amClosed
Executive Engineer MIDC Sangli Division
Executive Engineer MIDC Division Sangli Udyog Bhavan Vishrambag Sangli 416415
Shalgaon-Bombalewadi Industrial Area. M and R to Roads. Providing 50 mm thick Full grout (for pothole filling), 50 mm thick DBM and 25 mm thick BC for the road in B block of Shalgaon-Bombalewadi Industrial Area
2026_MIDC_1289642_1
14/2026
Open Tender
Civil Works
180 days
Shalgaon Bombalewadi Industrial Area
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,030
₹39,800
12 May 2026
24 Mar 2026
9 Apr 2026
24 Mar 2026
8 Apr 2026
31 Mar 2026
24 Mar 2026 - 31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing 50 mm thick Full grout (for pothole filling), 50 mm thick DBM & 25 mm thick BC for the road in B block of Shalgaon-Bombalewadi Industrial Area. | |||||
| 1.01 | Providing 50 mm thick Full grout bituminous treatment including supplying all materials , prepairing the exisisting road surface,applying tack coat @ 0.735 kg / sqm and laying the required thickness of metal layer, heating and spraying bitumen of specified Grade at the rate of 5.00 kg / sqm , spreading chips and laying seal coat of specified Grade of bitumen of 1.70 Kg/sqm and compacting , making the surface good etc. complete ( For only Patch Repair works / For Road work )
(VG-30 bulk bitumen rates are considered to arrive at rates) | - | M2 | - | - |
| 1.02 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | - | M2 | - | - |
| 1.03 | DENSE BITUMINOUS MACADAM:--Providing and laying dense bituminous macadam using crushed aggregate of grading 1, premixed with bituminous binder Bitumen of specified grade,@ 4.50 % by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 50 mm compacted thickness with drum mix type hot mix plant without SCADA having complying essential features of Hot mix plant as per IRC-27-2009 specified conditions and attachments such as electronic load sensor based belt conveyers, automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant ,Sensor paver, and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen VG-30 grade with stone dust filler (VG-30 bulk bitumen rates are considered to arrive at rates) | - | M3 | - | - |
| 1.04 | BITUMINOUS CONCRETE:--Providing and laying bituminous concrete using crushed aggregate of grading 1, premixed with bituminous binder @5.40% by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade ,level, alignment, and rolling to achieve the desired density for 25 mm compacted thickness with drum mix plant without SCADA, Sensor paver and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen of specified grade with stone dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) | - | M3 | - | - |
| 1.05 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | - | M3 | - | - |
| 2Royalty Charges | |||||
| 2.01 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.) | - | Cum | - | - |
| 3Lab Testing Charges | |||||
| 3.01 | Lab testing charges (Items No. 1 to Item No. 18 as per Schedule B in Tender document) | - | Per Test | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TenderDocument.pdf
Tender Documents • 0.43 MB
Layout.pdf
Additional Documents • 0.71 MB
ItemSpecification.pdf
Other Document • 0.02 MB
BOQ_2217191.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid