Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹18.7 L
EMD Value
₹18,700
Closing Date
17 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
65/1 Ramamoorthy road Virudhunagar
running works contract in respect of Town svks sub division
2020_EB_154191_2
SE/VREDC/ET no 54 , Dt 08.01.20
Open Tender
Electrical and Maintenance Works
Works
365 days
AEE/T/SVKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,700
Yes
6 Jul 2020
30 May 2020
18 Jun 2020
30 May 2020
17 Jun 2020
30 May 2020
120 days
Amount
Running contract in respect of Town / SVKS in VREDC
Excavation and erection of Poles 7.32m, 7.5m, 8m, 8.23m Poles
Normal ground
Excavation of pole pit (1.25m * 0.5m*1.5m)
Erection
Rockey ground
Excavation of pole pit (1.25m * 0.5m*1.5m)
Excavation and erection of 9m ,9.14m Poles
Normal ground
Excavation of pole pit (1.25m * 0.6m*1.83m)
Erection
Rockey ground
Excavation of pole pit (1.25m * 0.6m*1.83m)
Normal ground
Excavation of pole pit (1.25m * 0.6m*2.19m)
Erection
Rockey ground
Excavation of pole pit (1.25m * 0.6m*2.19m)
Transporting of poles from road side to pole pit
7.32m, 7.5m, 8m, 8.23m RCC poles/km
9m, 9.14m RCC poles, RS Joists, tubular & rail pole/km
Loading and Unloading of poles
7.32m, 7.5m, 8m, 8.23m RCC poles
9m, 9.14m RCC poles
RS Joists, tubular & rail poles (above 9.14m)
Concreting of poles
Concreting of poles as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor except Cement supplied by Board(Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete.
Concreting of poles as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor except Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete.
Coping of poles
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
Sleeve concrete for damaged RSJ,Rail,Tubular Pole (2'x2'x3')
Coil earthing per pole & pole earthing
Excavation and erection of stay set with transporting of materials to site
Normal ground
Excavation of stay pit (1.00m * 0.5m*1.5m)
Erection
Rockey ground
Excavation of stay pit (1.00m * 0.5m*1.5m)
Erection
Fixing of cross arm and insulator including transporting of materials from road side to site
V cross arm, Channel cross Arm4 1/2'
V cross arm, Channel cross Arm3 1/2'
LT Three phase cross arm
LT single phase cross arm
HT / LT TI fitting
Tapping channel cross arm
Erection of HT Side arm with stud
Erection of LT Side arm with stud
f.Double channel-X-Arm
g.Guarding Cross Arm
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site
11 KV Lines
For 7/4.09 ACSR (per span/wire)
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site
For 7/2.59 ACSR
For 7/3.35 ACSR
For line clear works
Resagging of HT. 7/4.09
Resagging of HT.7/3.35
Resagging of LT.7/3.35
Resagging of LT line 7/2.59
Guarding per span length
Spilt Neutral Guarding
Flat Guarding (4 wires)
Fixing of one earthing device
Erection/ Dismantling of Transformer
Upto 150 KVA
Erection of centre support (Including concrete)
Erection / dismantling of Metering Set
Erection of feeder cable
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Bus bar arrangement with open type
Loading and Unloading of distribution transformer
Below 250 KVA
Loading /Un loading of Metering Set
Excavation of pole pit stay pit, for urgency work at variour location Using JCB by board staff(Specific approval should be obtained from EE)
Replacement of failed transformer using private vechicle (crane) with board staff(Specific approval should be obtained from EE)
Manufacturing of Clamps
Alteration of clamps
Drilling / Less than 23mm holes per hole /slatted holes
Changing of pin point to cut point
Erection of service connection materials
SC's wires Ty Dism&Re-erection while executting the improvement works
Single Phase service connection
Three Phase service connection
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
complete replacement of worn out earth wire per structure
Labour for manufacturing of open type ( materials Supplied by board )
Tree clearance before executing the work (required labour may be got approved from concerned EE's)
Painting structure
Transformer structure (Double coat)
Pole (Colour washing with emulsion on Labour only) (Double coat)
For transformer only (Double coat)
Numbering of poles With Paint
Details of transformer name board including painting cost of MS sheet writing etc., complete I seating channel
Setting right of leaning of HT pole or LT pole including X arms, TI fittings
Details of erection of Transformer structure
Excavation of structure pole pits 2Nos
Erection of structure poles 2Nos
Concreting of poles
Erection of Structure materials
Top channel
Transformer seating channel and belting angle
AB switch (complete)
HG Fuse (complete)
Jumpering
HT LAS
LT LAS
Masanory work for each earth pit for 4Nos earth trough and concrete
Transporting of Transformer structure materials for Transformer structure /DP structure involves AB Switch/HG Fuse except 2Nos 9.14mt RCC pole set
Earthing system
Excavation of 4 Nos. earth pits
Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
Mason works for earth pits and structure pole coping (cement supplied by dontractor)
Writing of Danger board
Assemble, operating pipe fixing etc., fixing of cross bracing
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .