Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹1.3 CrAccepted-AOC FIRST FLOOR SHIVAJI TOWER PHOOLBAGH GWALIOR MADHYA PRADESH 474002 UDYAM MP 20 0004133 | GWALIOR | MADHYA PRADESH | 474002 | ₹1.3 Cr Quoted ₹1.1 Cr | Ist | Accepted-AOC Accepted being lowest |
| 2 | IInd₹1.4 CrRejected-Finance | ₹1.4 Cr | IInd | Rejected-Finance Rejected Being IInd Lowest |
Tender Value
Refer Docs
EMD Value
₹8.9 L
Closing Date
24 Aug 2023, 12:00 pmClosed
SE 47th E/M Circle PWD Moradabad
SE 47th E/M Circle PWD Moradabad
CAMC and Repair work
2023_CEEMP_822948_1
1275/3WE(Aligarh)-47/2023-24 dt 07.07.2023
Open Tender
Electrical Works
1095 days
Hathras
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹8.9 L
EE Temp.Mech.Division, PWD Aligarh
17 Sept 2024
21 Jul 2023
24 Aug 2023
21 Jul 2023
24 Aug 2023
21 Jul 2023
24 Jul 2023
Amount
PART-A Repairing of wrokstation.
Replacement of 22" LED Display
Replacement of Recording Server
Repairing of management / redundant recording server including firmware.
Repairing of SAN Storage and replacement of 1X8TB Hdd
Repairing charge for outdoor Bullet camera
Repairing charge for outdoor PTZ camera
Repairing charge for outdoor Dome camera
Repairing and service Charge of handheld metal detector
Repairing of Door Frame metal Detector
Repairing of Baggage X Ray scanner
Service charge of DG Set, Replacement Battery and AMF Panel
Supply of 6 UTP Cable
Supply of 6 core single mode OFC Armoured
Repairing of 1.5 T A.C. 3 Star
Replacement of 6 KVA UPS with new batteries
Supply of Firewell
Replacement of 1 KVA offline UPS
Labour charge, installation and configuretion charge
Repairing and replacement of networking accessories like LIU, Fiber Pigtails and other electrical accessories.
AC stablizer 4KVA-02 Nos.
SITC SM SFP module for L3 switch
Wall fan repairing
HDMI Connector
Part-B Comprehensive Annual maintanance contract of (CCTV and Security system including DFMD HHMD, X-ray Baggage scanner, AC (Including service), DG Set, UPS with batteries & Video Management software, san etc. installed at district Court aligarh for the period of First year
Cost of Comprehensive AMC for Second Year
Cost of Comprehensive AMC for Third Year
Manpower in Control Room as a Techenician (ITI/Diploma Hoder in Electrical/Electronics/IT)
Note :- 1- Time allowed for completion of (Part-A) work is One Month (1 Month) including rainy season. 2- Time allowed for completion of (Part-B) whole work is thirty six Months (36 Months) including rainy season.
Hypersthene IT Solutions Pvt Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid