Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | ₹10.5 L | L1 | Accepted-AOC TC Recommendation |
| 2 | L2₹11.1 L+₹58,885.61 (5.62%)Rejected-Finance | ₹11.1 L+₹58,885.61 (5.62%) | L2 | Rejected-Finance Higher rate quoted |
| 3 | L3₹11.5 L+₹1.0 L (9.80%)Rejected-Finance ASANSOL BARDHAMAN BARDHAMAN 713336 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713336 | ₹11.5 L+₹1.0 L (9.80%) | L3 | Rejected-Finance Higher rate quoted |
| 4 | L4₹11.7 L+₹1.2 L (11.6%)Rejected-Finance AT GIRIMINT COLLIERY PO PARIHARPUR DIST PASCHIM BARDHAMAN PIN 713373 | PASCHIM BARDHAMAN | WEST BENGAL | 713373 | ₹11.7 L+₹1.2 L (11.6%) | L4 | Rejected-Finance Higher rate quoted |
| 5 | L5₹11.7 L+₹1.2 L (11.7%)Rejected-Finance HOLDING NO 41 C O MIR AZAM KHAN KHAN RASJID MOHALLA JAMURIA BAZAR MAIN JAMURIA PASCHIM WEST BURDWAN WEST BENGAL INDIA 713336 | JAMURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713336 | ₹11.7 L+₹1.2 L (11.7%) | L5 | Rejected-Finance Higher rate quoted |
Tender Value
₹12.5 L
EMD Value
₹15,700
Closing Date
21 Apr 2026, 5:00 pmClosed
GM, Satgram-Sripur Area
Office of the General Manager Satgram Area P.O. Devchandnagar Dist.-Paschim Bardhman, West Bengal-713332
Construction of 02 nos. air crossing required for proposed depillaring panel BSP-13 in R-VI (Bogra) Seam of J. K. Nagar Colliery
2026_ECL_358262_1
SSA/GM/AMPCD/2026-27/AC/JKN/2 Date 03.04.2026
Open Tender
Civil Works - Others
Percentage
180 days
Satgram-Sripur
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,700
29 Jul 2026
11 Apr 2026
23 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
11 Apr 2026 - 18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour Cost | |||||
| 1.01 | Recess cutting in stone | 1 | M3 | - | - |
| 1.02 | Recess cutting in coal | - | M3 | - | - |
| 1.03 | Volume of Brick Work | - | M3 | - | - |
| 1.04 | 12mm thick cement plaster | - | M2 | - | - |
| 1.05 | RCC works | 1 | M3 | - | - |
| 1.06 | Shuttering works | - | M2 | - | - |
| 1.07 | Roof blasting | 1 | M3 | - | - |
| 1.08 | Material lowering & Transporting | - | EA | - | - |
| 1.09 | Brick | - | EA | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 0.61 MB
BOQ_371137.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .