Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 4 ARANMANAI RAMASAMY KOTHANAR WEST STREET RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹49,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector(Dev),DRDA, Ramanathapuram
District Rural Development Agency,Ramanathapuram
Improvements to the Samathuva burial ground in Package No.KDL-3/AGAMT 2021-22 of Kadaladi Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242179_1
R7/5593/2021/dated 05.07.2022 KDL-3
Open Tender
Civil Works
Item Rate
180 days
District Rural Development Agency
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹49,000
District Rural Development Agency,Ramanathapuram
9 Sept 2022
19 Jul 2022
8 Aug 2022
19 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
90 days
Amount
part-1 providing cc road 15m to samathuva buial ground with cremation shed and pipe line ,syntex in T.M.Kottai panchayat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Filling with good river sand including cost and conveyance of all materials and all labour charge for filling waters and ramming etc,complete for found action of basement
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete. For Below G.L.
cement concrete 1:3:6 mix using 20mm ISSmetel including cost and conveyance of all meteriyal to site and all labour charges for mixing ,laying and curing etc complete for 10cum
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Earth work excavation in narroe tenches for laying and jointing of pipes and depositing on initial lead of 10m and initial lift 20m in hart stiff clay ,stiff black cottion hart including shoring strutting lighting and watching and tested etc complede and as directed by RDDA,officers
Reflling with excavated earth after the pipe are laid jointed etc complete as directed by RDDA officers
supply deliverty of folloeing sizes of PVC pipes to confirm to ISI specification and as amended from time to time
75mm OD 6KSC PVC Pipe
75mm OD 6KSC PVC END cap
75mm OD 6KSC PVC BEND
75mm OD 6KSC PVC TEE
Conveyance the following size of PVC pipes and specials within a lead of 200m, lowering into the trenches laying proper trade and alignment joing with PVC couplers excluding excluding cost of materials
75mm OD 6KSC PVC Pipe
provision for HDPE Tank 500 lit
provision for HDPE Tank pedastal
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
supply and filling of sand including all charges etc complete
brick work in CM1:5 (one cement five sand )using country bricks of size 83/4x41/4x2 including curing etc complete
plastering with CM1:5 12mm thick including all charges
Part II: Canstrucation of samathuva biriyal ground waitind shed ,pipe line and syntex at Rajakkalpalayam villege in siraikulam PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Filling with good river sand including cost and conveyance of all materials and all labour charge for filling waters and ramming etc,complete for found action of basement
Cement concrete 1:4:8 using 40mm ISS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
brick work in CM1:5 (one cement five sand )using country bricks of size 8 3/4x41/4x2 including curing etc complete
RCC 1:1.5:3 mix using 20 mm ISS HBG metel includinh cost and conveyance all meteriyal to work side cost will be recort
plastering with CM1:5 12mm thick including cost &conveyance of all materiyal to work side including cement which will be deportmende for the
plastering with CM1:5 20mm thick including cost &conveyance of all labour charges etc complede
special celling plasting in cement marter 1:3 mix using 10mm thick etc complete
supply and fabarication of steel as per IS432 /1960 (tesed quality) including fabarication charges for all RCCiteam schedule including cost depfartmend section
providing centring with wood flanks and casurina post including cosr and conveyance labour etc complede
finixhing the top of roof with one course pressed tiles 20x20x2cm size laid in CM 1:3 12mm thick and poinding with 1:3 mix all labour charge
colour washing two coats with approuved color paint incliding cost and conveyance of all meteriyal etc complete
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard complede and as directed by RDDA
Reflling with excavated earth after the pipe are laid jointed etc complete as directed by RDDA officers
supply deliverty of folloeing sizes of PVC pipes to confirm to ISI specification and as amended from time to time
Conveyance the following size of PVC pipes and specials within a lead of 200m, lowering into the trenches laying proper trade and alignment joing with PVC couplers excluding excluding cost of materials
63MM PVC 90 Bend
63MM PVC 90 tee
63MM PVC 90 end cap
Part III: CONSTUCATION AT SAMATHUVA BURIYAL GROUND WAITING SHED AT KOKKARASANKOTTAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Filling with good river sand including cost and conveyance of all materials and all labour charge for filling waters and ramming etc,complete for found action of basement
Cement concrete 1:4:8 using 40mm HBG jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
brick work in CM1:5 (one cement five sand )using country bricks of size 8 3/4x41/4x2 including curing etc complete
RCC 1:1.5:3 mix using 20 mm ISS HBG metel includinh cost and conveyance all meteriyal to work side cost will be recort
plastering with CM1:5 12mm thick including cost &conveyance of all materiyal to work side including cement which will be deportmende for the
plastering with CM1:5 20mm thick including cost &conveyance of all labour charges etc complede
special celling plasting in cement marter 1:3 mix using 10mm thick etc complete
supply and fabarication of steel as per IS432 /1960 (tesed quality) including fabarication charges for all RCCiteam schedule including cost depfartmend section
providing centring with wood flanks and casurina post including cosr and conveyance labour etc complede
finixhing the top of roof with one course pressed tiles 20x20x2cm size laid in CM 1:3 12mm thick and poinding with 1:3 mix all labour charge
colour washing two coats with approuved color paint incliding cost and conveyance of all meteriyal etc complete
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard complede and as directed by RDDA
Reflling with excavated earth after the pipe are laid jointed etc complete as directed by RDDA officers
supply deliverty of folloeing sizes of PVC pipes to confirm to ISI specification and as amended from time to time
Conveyance the following size of PVC pipes and specials within a lead of 200m, lowering into the trenches laying proper trade and alignment joing with PVC couplers excluding excluding cost of materials
63MM PVC 90 Bend
63MM PVC 90 tee
63MM PVC 90 end cap
Part IV: CONSTCUCATION OF SAMATHUVA BURIAL GROUND CREMATION SHED COMPOUND WALL 20M PIPE LINE AND SYNTEX AT NORTH NARIPPAIYUR IN PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Filling in foundation and basement with river sand including cost and conveyance of all 15cm thick for filling waters and ramming etc,complete for found action of basement
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
RCC 1:1.5:3 mix using 20 mm ISS HBG metel includinh cost and conveyance all meteriyal to work side cost will be recort
brick work in CM1:5 (one cement five sand )using country bricks of size 8 3/4x41/4x2 including curing etc complete
Reflling with excavated earth after are including cost and conveyance etc complete
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Centering, shuttering and strutting to the soffits of and stutting up to 3.29m height for plain surfaces including stutting
supplying fabrication and placing in position mils steel ribbed for all reinforsed cement concrete work complede complying with standared specification
plastering with CM1:3 10mm thick in all floors including cost &conveyance of all materiyal to work side including cement which will be deportmende specification and directed
plastering with CM1:5 12mm thick including cost &conveyance of all materiyal to work side including cement which will be deportmende for the
colour washing two coats with approuved color paint incliding cost and conveyance of all meteriyal etc complete
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
sand filling with dry river sand and well rammed watered and consolidated complying with standard specification including cost and conveyance of meterial and labour charges etc . Complete
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including wateriing wherever necessary and laid in layers not more than 15 cm extra complete
brick work in CM1:5 using country brick including cost and conveyance of all metereyal etc complete
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
plastering with CM1:5 12mm thick including cost &conveyance of all materiyal to work side including cement which will be deportmende for the
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard complede and as directed by RDDA
Filling with good river sand including cost and conveyance of all materials and all labour charge for filling waters and ramming etc,complete for found action of basement
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
brick work in CM1:5 using country brick including cost and conveyance of all metereyal etc complete
Centering, shuttering and strutting to the soffits of R.C.C slabs and 3.20m height for plane surface including cost and conveyance of all materials to site etc., complete. For Below G.L.
column
supply and fabirication of steel for HBG metal etc complete
RCC 1:1.5:3 mix using 20 mm ISS HBG metel includinh cost and conveyance all meteriyal to work side cost will be recort
plastering with cement 1:5 mix 12mm thick
colour washing two coats with approuved color paint incliding cost and conveyance of all meteriyal etc complete
Part V: CONSTRUCTION OF AT SAMATHUVA BUIAL GROUND CREMATION SHED IN PANNANTHAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
sand filling in foundation with dry river sand and well rammed watered and consolidated complying with standard specification including cost and conveyance of 15mm thick wallramed waterd and compacted complede standared specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
RCC 1:1.5:3 mix using 20 mm ISS HBG metel includinh cost and conveyance all meteriyal to work side cost will be recort
brick work in CM1:5 (one cement five sand )using country bricks of size 23x11x7 including curing etc complete
refilling excaveded earth including cost and conveyanve and all charge etc complete
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Centering, shuttering and strutting to the soffits and 3.29m height for plain surfaces including struting
column
supplying fabrication and placing in position mils steel ribbed for all reinforsed cement concrete work complede complying with standared specification
plastering with CM1:3 10mm thick in all floors including cost &conveyance of all materiyal to work side including cement which will be deportmende specification and directed
plastering with CM1:5 12mm thick including cost &conveyance of all materiyal to work side including cement which will be deportmende for the
colour washing two coats with approuved color paint incliding cost and conveyance of all meteriyal etc complete
Part VI: PROVIDING CC ROAD 10M PIPE LINE AND SYNTEX TO BURIYAL GROUND IN V. SETHURAJAPURAM PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Filling with good river sand including cost and conveyance of all materials and all labour charge for filling waters and ramming etc,complete for found action of basement
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete. For Below G.L.
Cement concrete 1:3:6 using 20mm ISS metal including all incidental charges such as bailing out water finishing curing complete complying with standard specification 10cum
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard complede and as directed by RDDA
Reflling with excavated earth after the pipe are laid jointed etc complete as directed by RDDA officers
75MM OD 6KSC PVC PIPE 90
75MM OD 6KSC PVC end cap
75MM OD 6KSC PVC pend
75MM OD 6KSC PVC TEE
Conveyance the following size of PVC pipes and specials within a lead of 200m, lowering into the trenches laying proper trade and alignment joing with PVC couplers excluding excluding cost of materials
provision for HDPE Tank 500 lit
provision for HDPE Tank pedastal
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
supply and filling of sand including all charges etc complete
brick work in CM1:5 (one cement five sand )using country bricks of size 83/4x41/4x2 including curing etc complete
plastering with CM1:5 12mm thick including all charges
Part VII : Construction of Samathuva burial ground cremation shed in Kadaiyakulam village in Melaselvanur panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard gravel soil as per standard specification SS 20 B for narrow foundation
Sand and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification.
Cement Concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc., complete
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc.,
Brick work in Cement Mortar 1:5 using Country bricks ground moulded of size 23x11x7 cm. for the following including curing etc. complete complying with standard specification
Basement wall allround
Refilling excavated earth including cost and conveyance etc complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc., complete
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Height for plain surfaces including strutting.
Grade beem
Columns
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Plastering with Cement Mortar 1:3 (one cement and three sand) 10 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Plastering with Cement Mortar 1:5 (one cement and five sand) 12 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Colour washing two coats with cement paing of approved colour over one coat of primer including cost of all materials etc., complete complying with standard specification
compound wall 20m
Earth work excavation and depositing on bank with initial lead and lift in hard gravely soil. In herds tiff clay stiff black cotton soil hard red earth shales murra stoney earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Filling with river sand including cost and conveyance of all materials to work site and all labour charges etc.
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance all materials to work site and all labour charge etc.
Brick work in Cm 1:5 mix using country brick including cost and conveyance and all labour charges etc.
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel
Grade beem
Columns
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
RCC 1:1.5:3 mix using 20 mm ISS size HBG metal including cost and conveyance of all materials and all labour charges, etc.
Plastering with Cement Mortar 1:5 mix 12mm thick
Colour Washing with cement paint two coats of approved colour, including cost and conveyance of all materials and all labour charges, etc.
Part VIII : Construction of Samathuva burial ground cremation shed in Melamunthal village in T.Mariyur panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard gravel soil as per standard specification SS 20 B for narrow foundation
Sand and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification.
Cement Concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc., complete
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc.,
Brick work in Cement Mortar 1:5 using Country bricks ground moulded of size 23x11x7 cm. for the following including curing etc. complete complying with standard specification
Basement wall allround
Refilling excavated earth including cost and conveyance etc complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc., complete
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Height for plain surfaces including strutting.
Grade beem
Columns
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Plastering with Cement Mortar 1:3 (one cement and three sand) 10 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Plastering with Cement Mortar 1:5 (one cement and five sand) 12 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Colour washing two coats with cement paing of approved colour over one coat of primer including cost of all materials etc., complete complying with standard specification
CC pavement road
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement five sand and ten hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete
Brick work in Cement Mortar 1:5 using Country bricks including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:2:4 (One cement two sand and four hard granite stone) using 20mm. Gauge hard granite stone jelly for foundation including watering compacting etc. complete complying with standard specification
Colour washing two coats with cement paing of approved colour over one coat of primer including cost of all materials etc., complete complying with standard specification
Part IX : Construction of Samathuva burial ground waiting shed at Erwadi village in Erwadi panchayat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of will be recovered from the contractors bill as per special conditions including labour charges incidental charges and curing etc., complete for super structure.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement which will be supplied and departmental section store attend the cost will be record from contractors bill at the rate of specified in the special conditions appended and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for lintel, plinth beam, sunshade & Roof slab.
Plastering with cement mortar 1:5 12mm thick including cost & conveyance of all materials to work site including cement which will be supplied by the department from the departmental section store and the cost for the same will be recovered from the contractors bill at the rated and conditions specified in the special conditions from cement appended and all other charges etc., completed.
Plastering with cm 1:5 20 mm thick including cost and convyance and all labour charges etc complete
Special Ceiling plastering in Cement Mortar 1:3 mix using 10mm thick etc., complete.
Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from the contractors bill at the rate of specified in the special conditions appended including handling charges for straightening, cleaning, cutting bending, tying grills with steel wire and hoisting and positioning before concerting joining of 20mm placing the reinforcement in correct position as specified including cost of electrodes and power for wilding typing wires, space bars cover blocks and all other incidental charges etc., completed.
Providing centring with country wood flanks and casurina post including cost and conveyance of material, labour etc., complete
Finishing the top of roof with one course pressed tiles 20x20x2cm size laid in CM 1:3 12 mm thick and pointing with 1:3 mix using water proof compound including all labour charges etc
Colour washing two coats with approved colour paint including cost and conveyance of all materials etc., complete.
CC pavement road
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specificatio
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement five sand and ten hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete
Brick work in Cement Mortar 1:5 using Country bricks including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:2:4 (One cement two sand and four hard granite stone) using 20mm. Gauge hard granite stone jelly for foundation including watering compacting etc. complete complying with standard specification
Plastering in Cement mortar 1:5 mix 12mm thick including cost and conveyace of all materials and all labour charges,etc,
Part X : Providing CC road 60m at Samathuva burial ground in Erwadi village in Erwadi panchayat
Earth work Excavating and depositing on bank with an initial lead and list of all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation
Filling with good river sand including cost and conveyance of all materials and all labour charges for filling water's and ramming etc., complete for found action of basement
Cement concrete 1:4:8 mix using 40mm ISB HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supply and erection of centering charges including all cost & conveyance of all materials & all charges etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials
Part XI : Providing CC road 120m at Samathuva burial ground at Pilaiporuthamman village in Kannirajapuram panchayat
Earth work Excavating and depositing on bank with an initial lead and list of all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISB HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supply and erection of centering charges including all cost & conveyance of all materials & all charges etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VENKATESWARA CONSTRUCITON
JEEVANANTHAM CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .