Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1507 DWARKAMAI SAI NAGAR ST ANTHONY ROAD CHEMBUR MUMBAI 400071 | MUMBAI | MUMBAI | MAHARASHTRA | 400071 | Admitted-Finance |
| 2 | Admitted-Finance B 204 KAVITA KUNJ CHS MITHBUNDER ROAD KOPRI THANE E 400603 | THANE | THANE | MAHARASHTRA | 400603 | Admitted-Finance |
| 3 | Admitted-Finance 1 GANESH DARSHAN ADV SURVE MARG SANDHURST ROAD W MUMBAI 9 | MUMBAI | MAHARASHTRA | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
13 Jun 2025, 5:30 pmClosed
Executive Engineer Central Mumbai pwd ele Worli Mu
Executive Engineer Central Mumbai pwd ele Worli Mu
Providing Repairs to Package AC units installed at 11Ton 02 Nos and 22TonX3 Nos capacity Package Type Airconditioning system at Hwing 3rd Floor New Building, GST Bhavan ,Mazgaon, Mumbai.i.
2025_PWDM_1187739_1
Quatation/04/GST/25-26/JJ
Open Tender
Electrical Works
Item Rate
90 days
Hospital subdivision
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
17 Jun 2025
6 Jun 2025
16 Jun 2025
6 Jun 2025
13 Jun 2025
6 Jun 2025
Amount
Supplying deilvering installing & commissioning of 1/2 HP single phase/230Volts/920rpm/50Hz PICL make condenser fan motor
Supplying deilvering installing & commissioning of 23"dia O.D X12mm dia ID alumininium bobdy condnser fan blade
Supplying of 5.5 TR capacity Copland Scroll compressor of similar capacity unit with necessary accessories
Carrying out De-hydration of the 5.5 ton & 11 Ton condensserEvaporaator & entire refrigeration system by flushing withdry Nitrogen &using special grooved space haters of remove the moisture
Installing of 1 x 5.5 TR compressers in the existing Packaged unit,carrying out necessary brazing of pipes,Re-pressure the systems with dry nitrogen,carrying out through pressure testing,confirming no drop, vaccuming the system & commissioning along with first chage of R-22 Gas & compressor lubricant oil.
Brazing of pipes including, carrying out pressure testing of the system with Nitrogen & leak testing the system
Carrying out vacuuming of the system, charging of R-22 gas & checking the general performance of the unit
Supplying & replacing of M/s Blue star make Corded Hand Remote set suitable to 11 TR A.C.Package unit.
Supplying & replacing Sporlan make Expanssion Valve assembly having model SVE5 alongwith necessary silver brazing etc
Supplying & replacing 3/8" cath all drier of the units
Supplying & delivering of R-22 gas to the system
Carrying out necessary brazing of Pipe re pressure the system with dry nitrogen carrying out through pressure testing confirming no drop vaccumising the system & commissioning system along with charging of provied R22 GAS & compressor lubricant Oil complete for pacakage A unit.
Supplyied & installed new Fenner make Fan Belt A-32 size of Packaged Unit, 6 done necessary alignment, adjucted Belt Tension and checked performance. found ok
Carrying ourt chemical cleaning of Condensor coil of ODU with Vaniclean B chemical & jet water pressure.
Carrying ourt chemical cleaning of Evaporative coil of with Vaniclean B chemical & jet water pressure.
Gil Airconditioning And Refrigeration Services (BID ID -6706251)
CHAITANYA SERVICES (BID ID -6712347)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .