| 1 | 1₹7.9 CrAccepted-AOC NO 9 6 POOSARI CHENNIMALAI STREET CHENNIS NEST OPPOSITE TO SBI ERODE DISTRICT 636 009 | SALEM | TAMIL NADU | 636009 | ₹7.9 Cr Quoted ₹8.2 Cr | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹8.5 Cr+₹29.0 L (3.53%)Rejected-Finance 213 Y KAMARAJ NAGAR FIRST STREET BHAVANI | KARUR | TAMIL NADU | 621301 | ₹8.5 Cr+₹29.0 L (3.53%) | 2 | Rejected-Finance Highest Bidder |
| 3 | Rejected-Technical A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | - | - | Rejected-Technical Pre Qualification Not Satisfied Hence Rejected |
Tender Value
₹7.9 Cr
EMD Value
₹4.1 L
Closing Date
6 Jul 2023, 3:00 pmClosed
SE
B48, Alagesan nagar, Chengalpattu
Construction of High Level Bridge at Km 7/6 of Tindivanam Thengapakkam Road across Vairapuram River in lieu of existing causeway
2023_HWAY_330257_1
TN.No.12/SI.No.03/ 2023-2024 / SDO
Open Tender
Civil Works - Bridges
Item Rate
425 days
Villupuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹4.1 L
SE
7 Dec 2023
21 Jun 2023
7 Jul 2023
21 Jun 2023
6 Jul 2023
21 Jun 2023
28 Jun 2023
Amount
Earthwork excavation in all classes of soils, and depositing on bank with all leads and lifts including cost of all labour, equipements and all other incidental charges such as baling out water,providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, and other deleterious matter and obstructions, trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS & PIERS as per section 300,304 of MORT&H Specifications (V- Revision)
Earthwork excavation in SDR not requiring blasting and depositing on bank with all leads and lifts including cost of all labour, equipements and all other incidental charges such as baling out water,providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, and other deleterious matter and obstructions, trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS & PIERS as per section 300,304 of MORT&H Specifications (V- Revision)
Vibrated plain cement concrete of grade M10 (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete tools and plants and incidental charges such as baling out water, maintaining protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE BELOW Footing under ABUTMENTS & PIERS to provide an even surface as per section 1000,1500,1700 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, and hire charges for Tools and Plants including all other incidental charges such as baling out water, maintaining protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FOOTING UNDER ABUTMENTS & RETURN WALLS as per section 1000, 1500, & 1700 of MORT&H Specifications (Fifth Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for Tools and Plants including all other incidental charges such as baling out water, maintaining protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FOOTING UNDER PIERS as per section 1000, 1500, & 1700 of MORT&H Specifications (Fifth Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost of fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges etc., for ABUTMENTS & RETURN WALL SUBSTRUCTURE BELOW SILL LEVEL as per section 1500, & 1700, 2200 of MORT&H Specifications (Fifth Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost of fabrication of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges etc., for ABUTMENTS & RETURN WALL SUBSTRUCTURE ABOVE SILL LEVEL as per section 1500, & 1700, 2200 of MORT&H Specifications (Fifth Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants including all other incidental charges etc., complete for BED BLOCK CUM DIRTWALL AND PEDESTAL OVER ABUTMENTS as per section 1500, & 1700, 2200 of MORT&H Specifications (Fifth Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants including all other incidental charges etc., complete for as per section 1500, & 1700, 2200 of MORT&H Specifications (Fifth Revision) Circular PIERS BELOW SILL LEVEL
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants including all other incidental charges etc., complete for as per section 1500, & 1700, 2200 of MORT&H Specifications (Fifth Revision) Circular PIERS ABOVE SILL LEVEL
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants including all other incidental charges etc., complete for CAPPING BEAMS AND PEDESTAL OVER PIERS as per section 1500, & 1700, 2200 of MORT&H Specifications (Fifth Revision).
Supplying and fixing of ELASTOMERIC BEARING of size 50 x 30 x 6.4 cm including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete. As per section 2000 of MORT&H specifications (Fifth Revision ) and IRC: 83-2018 (Part-II).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications for T-BEAMS and CROSS BEAMS. as per section 1500, & 1700, 2300 of MORT&H Specifications (Fifth Revision)
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants including all other incidental charges etc., complete for DECK SLAB, KERBS and FOOTPATH as per section 1500, & 1700, 2300 of MORT&H Specifications (Fifth Revision).
Vibrated reinforced cement concrete M30 (Design mix) using ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants including all other incidental charges etc., complete for HAND RAILS AND POSTS. as per section 2703-3 of MORT&H Specifications (Fifth Revision)
Vibrated reinforced cement concrete M40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants including all other incidental charges etc., complete for CRASH BARRIER ON INNER EDGE OF FOOTPATH as per section 811, & 1700, 2703.3 of MORT&H Specifications (Fifth Revision)
Providing and fixing of G.I. DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanished Iron pipes and flats and fixing them in position, etc., complete. as per section 2705 of MORT&H Specifications (Fifth Revision)
Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site including all labour charges for mixing concrete, laying, hire charges for Tools and Plants, compacting, curing with all leads for soft water, including all other incidental charges for form work etc., complete, for BASE COURSE BELOW APPROACH SLAB,FOOTPATH AND FOOTPATH RAMP as per section 1500, & 1700, 2704 of MORT&H Specifications (Fifth Revision)
Vibrated reinforced cement concrete M30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants including all other incidental charges etc., complete for APPROACH SLABS. as per section 1500, & 1700, 2704 of MORT&H Specifications (Fifth Revision)
Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, Tools and Plants and incidental charges etc., complete for CC PARAPET as per section 1500, & 1700 of MORT&H Specifications (Fifth Revision)
Vibrated Cement Concrete M30 (Design mix) 75 mm uniform thick with surface reinforcement confirming to section 2702.2 & 1700 of MORT&H Fifth Revision, using ISS HBG graded metal including cost and conveyance of all materials to work site including cement at site, including all labour charges for mixing concrete, laying, hire charges for tools and plants,compacting curing with all leads for potable water, including all other incidental charges formwork, etc., complete for WEARING COAT Over DECK SLAB and APPROACH SLAB. as per section 2702.2 of MORT&H Specifications (Fifth Revision)
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specification of Road and Bridge works published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap prodived in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MORTH specifications, including labour, equipment and incidental charges for fixng the joints complete in all respects, as per section 2600 of MoRT&H Specifications (Fifth Revision)
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill. as per section 2706 of MORT&H Specifications (Fifth Revision)
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. as per MORT&H No.300,304 (vth rev)
Providing filter media behind the abutments and wings for 600mm thick using filter material as per Appendix 6 of IRC : 78-2014, well packed with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges etc., complete. as per section CI.710.1.4 & Appendix -6 of IRC : 78-2014
Filling behind Abutments and return walls as per appendix 6 of IRC 78-2014 with filling material having ϕ value more than 35º including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for as per section CI.710.1.4 & Appendix -6 of IRC : 78-2014
Supply and fabrication of Fe-500D grade steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as persection 1600 of MORT&H Specifications (Fifth Revision)
Supply and fabrication of Fe-240 (grade-1) steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per section 1600 of MORT&H Specifications (Fifth Revision)
Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths. as per Section 2706 of MORT&H Specifications (Fifth Revision)
SUB ESTIMATE - DISMANTLING Dismantling PCC existing Hard bed and other structures dismantling savaging and removal and disposing off resulting materials and back filling trenches and pits etc., for RR masonry as per MORT & H specification 111,112,202
SUB ESTIMATE - RCC RETAINING WALL @ A1 and A2 side Earth work excavation in al classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and constructions, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS. as per MORT&H Vth Revision 304
Vibrated Cement Concrete of Grade M-10, Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF RCC RETAINING WALLS as per MORT&H Vth Revision 1000, 1500, 1700
Vibrated reinforced cement concrete M35 grade, Design mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTING OF RETAINING WALLS. as per section 1000, 1500 & 1700 of MORT&H specification
Vibrated reinforced cement concrete M35 grade, Design mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for STEM RETAINING WALLS. Below Ground level as per MORT&H Specificaton No.1000, 1500, 1700, 2200 Below Sill Level
Vibrated reinforced cement concrete M35 grade, Design mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for STEM RETAINING WALLS. Above sill level as per MORT&H Specificaton No.1000, 1500, 1700, 2200 Above Sill Level
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN RETAINING WALL, . as per MORT&H Vth specification No.2706
Supply and fabrication of Fe-500D (HYSD) steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per cl 1600 of MORT&H specification (V Revision)
Vibrated Cement Concrete of Grade M-15, Nominal Mix, Using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, FOR Broken parapets as per MORT&H Vth Revision 1000, 1500, 1700
SUB ESTIMATE - PCC RETAINING WALL @A1 and A2 side Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and constructions, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS. as per MORT&H Vth Revision 304
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTINGS OF RETAINING WALLS. MORTH No.1000,1500,1700
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. Below the Ground Level MORTH No.1000,1500,1700,2100 & 2200
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. Above the ground level MORTH No.1000,1500,1700,2100 & 2200
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings retaining wall including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN RETAINING WALL, . as per MORT&H Vth specification No.2706
Vibrated Cement Concrete of Grade M-15, Nominal Mix, Using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, FOR Broken parapets as per MORT&H Vth Revision 1000, 1500, 1700
SUB ESTIMATE - APPROACH ROAD Construction of embankment with approved material of CBR 8 with 4km lead and lifts, transporting to site, spreading,gradinng to required slope and compacting to meet requirement of table 300-2 of MORT&H specification
95% Compaction
Construction of sub grade and earthern shoulders with approved materials obtained from areas shown in the separate drawing for each and every km having of CBR 8 and lead of 4km ,procter density and field density as per details enclosed, transporting to site, spreading,gradinng to required slope and compacting to meet requirement of table 300-2 of MORT&H specification.
97% Compaction
Providing and laying Granular Sub-Base Grade- V consisting of 180mm thick well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm. thick in two layers of 125mm each thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 for Approach road
Proivding and laying of prime coat using Bitumen Emulsion at the rate of 7kg per ten Square Metre over the WMM surface preparatory to another construction over it.(Cl.502 of MORT&H, Rev-V)
Proivding and laying of Tack coat using Bitumen Emulsion at the rate of 2.50kg per ten Square Metre over the treated WMM surface preparatory to another construction over it.(Cl.503 of MORT&H, Rev-V)
Providing, laying 95 mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cumof13.20-2.36mm and 0.23cum of 2.36mm&below and with 53.20Kgs of VG30 Grade bitumen for premixing per10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in Central Ho tMix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labour for attending to paver at site etc.,including hire and fuelcharges for 20-30 ton CMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratoryrollers and all other tools and plant required ,including all other incidental charges etc.,complete as per specification using CMP as per clause 504 MORTH Rev-5
Providing and laying Bituminous Concrete 30 mm thickness which work shall consist of construction using coarse aggregates premixed with VG 30 Grade Bitumen at the rate of 5.40% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporiting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for BC (Grade-II) as per MORTH-V No. 111, 112, 507, 900.
Sub Estimate for Painting:Painting two coats with approved Cement Paint over the priming coat surface using first class cement paint over the cement plastered surface including cost and conveyance and all labour charges for cleaning, preparing the surface painting and curing all etc.,complete.
Painting two coats with ready mix Plastic Emulsion Paint using first quality plastic enamal paint over priming coat surface over the cement plastered surface including cost and conveyance and all labour charges for cleaning, preparing the surface painting and curing all etc.,complete.
Sub Total Bid Price (in figures)
GST @ 18% of above all Schedules (in figures)
VEDANAYAKI CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .