Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-Finance GHAZIABAD 201206 U P INDIA MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 UDYAM UP 29 0018296 09ATCPK8932G1ZH R M | GHAZIABAD | UTTAR PRADESH | 201206 | ₹16.6 L | L1 | Accepted-Finance OK |
| 2 | L2₹17.2 LAccepted-Finance | ₹17.2 L | L2 | Accepted-Finance OK |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AGNI AUTOMATION AND SECURITY L1 | K.L Enterprises L2 |
|---|---|---|---|---|---|
| 1.01 | Making of all safety arrangements i.e. safety belt, gum boots, helmet, gloves etc to carry out the work. | 1 | Job | 30,000 ₹35,400 | 30,200 ₹35,636 |
| 1.02 | Dismantling of old liquid rotor starter by opening its incoming and outgoing connection of the motor and opening/cutting the grouted angles nut/bolts etc. | 1 | Job | 40,000 ₹47,200 | 40,000 ₹47,200 |
| 1.03 | Shifting of the LRS from the installed location to outside the pump house using Hydra/crane as per requirement & instructions of the engineer in charge. | 1 | Job | 10,000 ₹11,800 | 10,000 ₹11,800 |
| 1.04 | Supply of the FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 3.3 KV supply, motor rating 285 KW Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. Make Innovative/Jayashree/Schneider/Any other DJB Approved Make | 1 | No. | 12,50,000 ₹14.8 L | 13,00,000 ₹15.3 L |
| 1.05 | Work of installation of FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 415/3300 Volt supply, motor rating 285 KW /3.3 KV Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. | 1 | Job | 30,000 ₹35,400 | 30,200 ₹35,636 |
| 1.06 | Work of connection of the feedback from the main incoming panel and connection of feedback of ACB/MCCB the FCMA panel & Connection of the FCMA rotor controller with required lugs/thimbles/tape etc to complete the work. | 1 | Job | 15,000 ₹17,700 | 15,100 ₹17,818 |
| 1.07 | Complete testing of the Panel after installation. | 1 | Job | 30,000 ₹35,400 | 30,000 ₹35,400 |
Tender Value
₹17.9 L
EMD Value
₹35,900
Closing Date
30 Mar 2026, 3:00 pmClosed
Office of the Ex. Engineer (E and M)M-10, Pocket-1
Office of the Ex. Engineer (E and M)M-10, Pocket-1 SEC-7
SITC of soft starter for 285 KW 3.3 KV HT motor with allied works at Command Tank No. 2, Dwarka Sub-city.
2026_DJB_289156_1
NIT NO. 31 (2025-26)/EE(EnM)M-10
Open Tender
Miscellaneous Works
60 days
Office of the Ex. Engineer (E and M) M-10
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Account No SB 06121000095461
₹35,900
19 May 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Making of all safety arrangements i.e. safety belt, gum boots, helmet, gloves etc to carry out the work. | 1 | Job | - | - | item1 | |
Dismantling of old liquid rotor starter by opening its incoming and outgoing connection of the motor and opening/cutting the grouted angles nut/bolts etc. | 1 | Job | - | - | item2 | |
Shifting of the LRS from the installed location to outside the pump house using Hydra/crane as per requirement & instructions of the engineer in charge. | 1 | Job | - | - | item3 | |
Supply of the FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 3.3 KV supply, motor rating 285 KW Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. Make Innovative/Jayashree/Schneider/Any other DJB Approved Make | 1 | No. | - | - | item4 | |
Work of installation of FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 415/3300 Volt supply, motor rating 285 KW /3.3 KV Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. | 1 | Job | - | - | item5 | |
Work of connection of the feedback from the main incoming panel and connection of feedback of ACB/MCCB the FCMA panel & Connection of the FCMA rotor controller with required lugs/thimbles/tape etc to complete the work. | 1 | Job | - | - | item6 | |
Complete testing of the Panel after installation. | 1 | Job | - | - | item7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_383919.xls
BOQ • 0.32 MB
NIT31.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid