| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance SANTINEKATAN ROAD BOLPUR | BOLPUR | L1 | Accepted-Finance ACCEPTED | |
| 2 | L2₹3.4 L+₹536.31 (0.16%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹3.4 L+₹798.50 (0.24%)Rejected-Finance COLLEGEPARA SURI BIRBHUM | BIRBHUM | WEST BENGAL | 731236 | L3 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
1 Jul 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER BOLPUR MECHANICAL DIVISION PHED
SRINIKETAN ROAD NEAR HOTEL MARK MEADOWS PO SRINIKETAN DIST BIRBHUM PIN 731236
Rectification of 1 (One) Nos Panel of Surul Water Supply Projects under Bol.Md PHE Dte.
2025_PHED_864986_2
WBPHED/03/AE/BOLMD/2025-26
Open Tender
MECHANICAL
Item Rate
15 days
SURUL
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,000
4 Jul 2025
19 Jun 2025
3 Jul 2025
20 Jun 2025
1 Jul 2025
20 Jun 2025
Amount
Tesing and commissioning of the panel including satisfactory operation of pumping machineries all complete as per direction of EIC
Technician charges for detection of fault after disconnecting all power line & supply main line by using necessary metering instrument all clomplete as per direction.
Supply & delivery of following spares as per sample:- [Make- ABB/Siemens/L&T/GIC/Havells]
i. 3P 50 Amps, 415V TP power Contactor with AC coil
ii Digital volt meter
iii Digital Amp meter
iv LED base phase indicating Lamp ( 240 V)
v Multifunction meter
vii Push switch
viii Add ON block
ix MPR(8-22 Amp)
x 3 way terminal 150 Amp
xi MPR 3DM2 (0.5-80Amp)
xii All necessary hardwares like pin, fork, socket, ferrule etc
Fitting fixing of the above supplied materials as in item no-2 (i to x) to the original position in the panel and making all power line connection & internal wiring of the panel & testing all complete as per direction of EIC.
Tesing and commissioning of the panel including satisfactory operation of pumping machineries all complete as per direction of EIC
Withdrawing the Pumping machinery along with column pipe from the bore well after making necessary arrangement and handling with chain pulley block complete to the satisfaction of EIC. Cost includes carrying of all materials as required tools and tackles along with electrical instruments etc. also including deputing technician for fault detection. Installation of the pumping machinery making all required arrangement, cable joint with cable jointing kits supplied by Agency, priming free run fitting complete installation after making joints of column pipe using havox etc. for leak proof commissioning , testing to the entire satisfaction of EIC, works includes carrying charges as per direction of EIC. (≥ 20H.P.)
Supply delivery following materials
5/8 nut bolt and washer
5" dia socket
5/4" reducer
Installation of dept supplied pump & motor after dismanting the existing base foundation of pumping machineries with base plate, groutings etc including electrical connection then supply of all erection items (such as - bare shaft pump, base plate, coupling & coupling guard companion flanges etc) and painting as required for all installation of centrifugal pump as well as existing Horizontal Foot Founted Induction Motor, valves gauges including laying of existing LT cables (with necessary jointing materials), necessary earthing, suction & delivery pipe line, concentric enlarger (80mmx100mm) making as per per reqirement etc after dismantling the valves for completion of work as per relevent Hydraulic Standards & IE rules in compliance with specification of NIT and upto entire satisfaction of EIC. This includes the cost for Making brick pillar 0.25 x 0.25 x 0.75 Mtr/Suitable hight for supporting of valves and pipes with 12mm thick plaster and net cement finish complete. (One no Pipe line) also carrying the old dismantaled materials to godown by engaging materials, tools, tackles etc all complete after Testing & Commissioning of the entire installation i.e. Pumps, Motors, valves gauges as per direction & upto satisfaction of EIC.
CI 150 mm NRV
Installation of above supplied NRV to work site with all necessary materials as per direction of EIC
Add: @ 18% GST of Sl. No:1.00 to Sl. No:10.00
Add: @ 1% Cess of Sl. No:1.00 to Sl. No:11.00
DEY ENTERPRISE (BID ID -6628080)
HINDOL ROY (BID ID -6629481)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .