Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.2 LAdmitted-Finance | -49.99% | ₹36.2 L | L1 | Admitted-Finance |
| 2 | L1₹36.2 LAdmitted-Finance | -49.99% | ₹36.2 L | L1 | Admitted-Finance |
| 3 | L2₹39.8 L+₹3.6 L (10.00%)Admitted-Finance BASUDEVPUR MAHANGA MAHANGA CUTTACK | -44.99% | ₹39.8 L+₹3.6 L (10.00%) | L2 | Admitted-Finance |
| 4 | L3₹42.0 L+₹5.8 L (16.0%)Admitted-Finance AT PO DIGIDA PS SADAR DIST BALASORE | -42.00% | ₹42.0 L+₹5.8 L (16.0%) | L3 | Admitted-Finance |
| 5 | L4₹42.0 L+₹5.8 L (16.0%)Admitted-Finance | -41.99% | ₹42.0 L+₹5.8 L (16.0%) | L4 | Admitted-Finance |
Tender Value
₹72.4 L
EMD Value
₹72,500
Closing Date
20 Jul 2026, 5:30 pmClosed
Superintending Engineer
O/o the S.E, Drainage Division, Jagatsinghpur
Decongestion of Hansua D/C (0.00 Km to 48.00 Km) Alaka D/C, Tigiria D/C, Haladipani D/C, Santara D/C. Telugunia D/C, Basulei D/C and Renovation of link drains of Basulei D/C under Kujanga and Erasama Block
2026_CEDC_134501_2
NOTICE NO.SEDD-JSPUR-03/2026-27
Open Tender
Civil Works - Roads
Percentage
120 days
Jagatsinghpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹72,500
Yes
9 Sept 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
6 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Clearance of weeds, Ipemia and thickly grown water Hycinths for the Drainage Channel including dumping the clearance material away from drainage channel as per direction of Engineer-in-charge | 20,42,945 | One Sqm | 2.8 | ₹57,20,246 |
| 0_) | Earth work in excavation of drain both in dry and wet conditions by mechanical means in all kind of soil including stoney earth, gravel moorum mixed with all leads, lifts and delifts, dewatering including trimming of slopes and bed to design section and depositing the excavated materials to the spoil banks or any other approved place including leveling and rough dressing for formation of embankment as per the specification and design with cost of hire charges of all machineries T & P ,operations maintenance cost with all leads, lifts and delifts etc. complete including taxes, labour cess T&P etc complete with all cost incidental to the work as per the drawing specification and direction of the Engineer-in-charge. (Measurement to be taken on initial and final level of sections) Bed width within 8.00mtr. | 42,755.04 | One Cum | 35.6 | ₹15,22,079.42 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.48 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BID6.pdf
Tender Documents • 10.36 MB
BOQ_599795.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .