| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAccepted-AOC FLAT NO S 2 SHRI CHINTAMANI S NO 1 1148 MAHAJAN PETH MODEL COLONY SHIVAJI NAGAR PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | ₹5.8 Cr Quoted ₹5.9 Cr | L1 | Accepted-AOC Being Reasonable and accepted |
| 2 | L2₹6.2 Cr+₹30.4 L (5.18%)Rejected-AOC | ₹6.2 Cr+₹30.4 L (5.18%) | L2 | Rejected-AOC Other Than L1 |
| 3 | L3₹6.6 Cr+₹76.9 L (13.1%)Rejected-AOC L 87 STREET NO 7C MAHIPALPUR EXTENSION NEW DELHI 110037 | NEW DELHI | NEW DELHI | DELHI | 110037 | ₹6.6 Cr+₹76.9 L (13.1%) | L3 | Rejected-AOC Other Than L1 |
| 4 | L4₹7.5 Cr+₹1.6 Cr (27.8%)Rejected-AOC 02 AB ADGAONKAR PLAZA NEAR ABB CIRCLE MAHATMA NAGAR NASHIK 422 007 MAHARASHTRA | NASHIK | MAHARASHTRA | 422007 | ₹7.5 Cr+₹1.6 Cr (27.8%) | L4 | Rejected-AOC Other Than L1 |
| 5 | L5₹7.6 Cr+₹1.7 Cr (28.7%)Rejected-AOC BHAPKAR PATIL PLOT NO 24 GURHSHIP HOUSING SOCIETY SATBHAL MALA DEHIGATE AHMEDNAGAR 414001 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414001 | ₹7.6 Cr+₹1.7 Cr (28.7%) | L5 | Rejected-AOC Other Than L1 |
| Sl No | Description | Qty | Unit | Horizon Construction L1 | M/s M R MAHANA L2 | NSC Projects Pvt. Ltd. L3 | Sharda Infratech L7 | MUKESH CONSTRUCTION CO L6 | M/s S. R. Constructions L5 | P L ADKE L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of posts or struts(wood, steel or RCC) any section embedded in concrete, including taking out embedded portion and making good disturbed ground all as specified and directed. | 1,910 | Running Metre | 9 ₹17,190 Lowest | 10 ₹19,100 | 60 ₹1,14,600 | 708 ₹13,52,280 | 90 ₹1,71,900 | 400 ₹7,64,000 | 33.3 ₹63,603 |
| 2.00 | Dismantling fencing, wire mesh, any type with support complete all as specified and directed. | 4,400 | Square Metre | 9 ₹39,600 Lowest | 10 ₹44,000 | 60 ₹2,64,000 | 35.4 ₹1,55,760 | 36 ₹1,58,400 | 150 ₹6,60,000 | 33.3 ₹1,46,520 |
| 3.00 | Dismantling structural steel work including doors, gates but excluding framed trusses complete ail as specified and directed. | 1.5 | Quintal | 999.84 ₹1,499.76 | 500 ₹750 Lowest | 500 ₹750 Lowest | 1,416 ₹2,124 | 900 ₹1,350 | 20,000 ₹30,000 | 9,990 ₹14,985 |
| 4.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep in hard / dense soil and getting out including clearing away all grass vegetation, saplings, shrubs, brushwood, undergrowth, roots, and trees not exceeding 30 cm girth (measured one metre above ground level) including digging out roots all as specified and directed. | 1,000 | Square Metre | 18 ₹18,000 Lowest | 20 ₹20,000 | 57 ₹57,000 | 56.64 ₹56,640 | 45 ₹45,000 | 50 ₹50,000 | 22.2 ₹22,200 |
| 5.00 | Earth work in excavation in any kind of soil by manual means or mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.M on plan) including getting out excavated earth, lift upto 1.5m, complete all as specified and as directed. | 4,000 | Cubic Metre | 153 ₹6,12,000 | 120 ₹4,80,000 | 100 ₹4,00,000 | 198.24 ₹7,92,960 | 90 ₹3,60,000 Lowest | 160 ₹6,40,000 | 111 ₹4,44,000 |
| 6.00 | Earth work in excavation in all kind of soil by manual means or mechanical means (Hydraulic excavator) in foundation trenches, manholes or drains etc. (not exceeding 1.5 m in width or 10 Sq.M on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil, complete all as specified and as directed. | 7,147.03 | Cubic Metre | 162 ₹11,57,818.86 | 150 ₹10,72,054.5 | 150 ₹10,72,054.5 | 198.24 ₹14,16,827.23 | 180 ₹12,86,465.4 | 300 ₹21,44,109 | 111 ₹7,93,320.33 Lowest |
| 7.00 | Earth work in excavation in all kind of soil by manual means or mechanical means (Hydraulic excavator) in foundation trenches, manholes or drains etc. exceeding 1.5 m in depth but not exceeding 3.0 m in depth (not exceeding 1.5 m in width or 10 Sq.M on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m to 3.0 m, including getting out the excavated soil, complete all as specified and as directed. | 295.46 | Cubic Metre | 243 ₹71,796.78 | 180 ₹53,182.8 | 200 ₹59,092 | 233.64 ₹69,031.27 | 450 ₹1,32,957 | 400 ₹1,18,184 | 111 ₹32,796.06 Lowest |
| 8.00 | Earth work in excavation in soft/ disintegrated or ordinary rock by manual means or mechanical means (Hydraulic excavator) in foundation trenches, manholes or drains etc. (not exceeding 1.5 m in width or 10 Sq.M on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated rock, complete all as specified and as directed. | 1.09 | Cubic Metre | 603 ₹657.27 | 1,000 ₹1,090 | 225 ₹245.25 Lowest | 283.2 ₹308.69 | 900 ₹981 | 800 ₹872 | 333.33 ₹363.33 |
| 9.00 | Removing excavated material n exc. 50 m and depositing where directed at a level n exc. 1.5 m above the starting point, complete all as specified. | 1,265.95 | Cubic Metre | 36 ₹45,574.2 | 60 ₹75,957 | 150 ₹1,89,892.5 | 99.12 ₹1,25,480.96 | 27 ₹34,180.65 Lowest | 150 ₹1,89,892.5 | 166.5 ₹2,10,780.68 |
| 10.00 | Removing excavated material exc. 250 m but n exc. 500 m and depositing where directed at a level n exc. 1.5 m above the starting point, complete all as specified. | 5,600 | Cubic Metre | 45 ₹2,52,000 | 90 ₹5,04,000 | 250 ₹14,00,000 | 99.12 ₹5,55,072 | 36 ₹2,01,600 Lowest | 300 ₹16,80,000 | 166.5 ₹9,32,400 |
Tender Value
₹8.8 Cr
EMD Value
₹7.7 L
Closing Date
26 Sept 2025, 6:00 pmClosed
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
CONSTRUCTION OF EXTERNAL B/R SERVICES FOR INFRA AT BHAGUR UNDER GE DEOLALI
2025_MES_727954_1
84642
Open Tender
Civil Works
Item Rate
450 days
GE DEOLALI
Class S and Category a(i) as per NIT
7 documents required · 7 mandatory
₹3,000
GE DEOLALI
₹7.7 L
Yes
11 Nov 2025
28 Aug 2025
3 Oct 2025
28 Aug 2025
26 Sept 2025
19 Sept 2025
29 Aug 2025 - 4 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_814931.xls
BOQ • 1.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .