| 1 | L1₹78.5 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹84.6 L+₹5.5 L (7.02%)Rejected-AOC NEAR RAILWAY CROSSING ADAMPUR DOABA JALANDHAR JALANDHAR PUNJAB 144103 | JALANDHAR | PUNJAB | 144103 | L2 | Rejected-AOC Other than lowest bidder | |
| 3 | L3₹85.0 L+₹5.9 L (7.52%)Rejected-AOC VILL CHOMON ADAMPUR JALANDHAR PUNJAB 144103 UDYAM PB 10 0011450 | JALANDHAR | PUNJAB | 144103 | L3 | Rejected-AOC Other than lowest bidder | |
| 4 | L4₹90.4 L+₹11.3 L (14.3%)Rejected-AOC | L4 | Rejected-AOC Other than lowest bidder |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
12 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (AF) Chandigarh
HQ CWE (AF) Chandigarh PIN-160003
ADDN/ALTN AND IMPROVEMENT TO SLOPE OF ENTRY POINT OF CERTAIN TECHNICAL ACCN AT AF STATION ADAMPUR
2023_MES_584838_4
CWE/AF CHD/ADM/T-46/2022-2023
Open Tender
Civil Works
Works
180 days
Adampur
As per NIT
9 documents required · 9 mandatory
₹1,000
GE(AF) Adampur
₹1.5 L
26 Oct 2023
7 Jul 2023
19 Aug 2023
7 Jul 2023
12 Aug 2023
29 Jul 2023
Amount
Demolition of un-reinforced cement concrete (PQC) as in isolated slabs of pavements/ termac of size n exc 4.5 x 4.5 metre with mechanical rock breakers or compresser breaker pin, complete all as specified and directed by Engineer-in-Charge including removing all the demolished materials/ rubbish outside MOD land.
NOTE FOR SL BOQ ITEM No 1.00 : Utmost care shall be taken to ensure that adjacent pavement slabs are not disturbed while cutting/ demolishing the identified slabs.The outer periphery of each slab to be demolished shall be cut to full depth to isolate it from continous slab with diamond cutter of suitable size and capacity before demolition. The contractor shall ascertian the place for disposal of demolished materials outside MOD land before quoting of this tender and quote accordingly considering transportation cost, loading and unloading, etc. The unit rate quoted by the Contractor shall include each and every element under this item.
Material & Labour complete for Pavement Quality Concrete (PQC) of minimum 28 days field Flexural strength of 45 Kg/ per Square centimetre or 4 .5 Mpa, aggregate gradation as per Table 3 of IRC 15 - 2017, coarse aggregate of clean, hard strong, dense, non-porous and durable pieces of crushed stone or gravel, fine aggregates of clean natural sand or crushed stone sand or combination of both using minimum 400 kg per cubic metre of cement with non-circular virgin synthetic fibre, complete are as specified by the manufacturer and directed by Engineer-in-Charge.
NOTE FOR SL BOQ ITEM No 2.00 : (i) Thickness of Pavement shall be 300 mm (Approx.) as directed by Engineer-in-Charge. PQC laid, spread and compacted with slip-form paver of minimum 7.5 metre width, by using needle and screed Vibrators, complete including required formwork, bullnosing rounding off edges finishing by brooming/ belting, curing and tining by Texturing cum Curing Machine, complete, all as specified and directed. Required surface texturing to be done as specified in Clause - 10.1.14 and Table 9 of IRC 15-2017. (ii) Non circular fibre shall be measured and paid for separately as supply only under respective item. (iii) The PQC shall be laid after necessary design mix as specified in particular specification clause 5.3 to be approved by the GE. The quantity of cement mentioned in this item is minimum and nothing extra or plus deviation will be admissible on account of any plus side variation in quantity of cement due to design mix.
Supply only non circular virgin, synthetic, monofilament polyster fibres of length 12mm to 18mm specific gravity 1.34 to 1.39, UV stable alkali reistant, equivalent diameter 15.40 micron, minimum melting temperature 240 to 260°C and minimum tensile strength 300 MPa to be used upto 0.25% by weight of cement complete all as specified and directed by Engineer-in-Charge.
Supplying and laying 125 micron thick HDPE sheet (Virgin Quality) water proof, wrinkle free without puncture over tack coat/ sand cushion as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm, complete, all as specified and directed by Engineer-in-Charge.
Supplying and laying 10 mm thick sand cushion with clean river sand duly clear of residual, organic and deleterious materials spread evenly to uniform thickness including watering and well compacting, complete, all as specified and directed by Engineer-in-Charge.
Forming 25 mm width expansion joint in concrete slab for full depth of PQC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. The joint then filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified, thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell medium density, crossed linked polyethylene foam backup rod of 30 mm dia, over filler board and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of +/- 30% having minimum 10 year performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacture, complete, all as specified and directed by Engineer-in-Charge.
Forming 25mm wide construction joints in concrete slab for full depth of PQC by early entry saw cut using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell medium density, crossed linked polyethylene foam backup rod of 30 mm dia, application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN- 141875- 2003 with minimum movement accommodation factor (MAF) of +I- 30% having minimum 10 years performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacture, complete, all as specified and directed by Engineer-in-Charge.
Forming dummy/contraction joint with an initial saw cut of 6 mm soon after the concrete has set, upto a depth of 1/3rd to 1/4th the thickness of the slab, widening the first saw cut to 6 mm and 24 mm deep by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 10 mm dia, application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) OF +/- 30% having minimum 10 years performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer, complete, all as specified and directed by Engineer-in-Charge.
M/S GURBACHAN SINGH
M/s Sahib and Company
R K ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .