| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance 245 RAJABPUR RAJABPUR RAJABPUR JYOTIBA PHULE NAGAR UTTAR PRADESH 244236 | AMROHA | UTTAR PRADESH | 244236 | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹17.3 L (13.9%)Admitted-Finance PLOT 06 MAHILA UDHYAMI PARK I ECOTECH III GR NOIDA UP 201306 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201306 | ₹1.4 Cr+₹17.3 L (13.9%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 17 6 FLAT NO 06 SAROJ MANSION BUILDING 6TH STREET NANDANAM EXTENSION NANDANAM CHENNAI TAMIL NADU 600035 | CHENNAI | TAMIL NADU | 600035 | - | - | Rejected-Technical Due to not qualified tender PQC |
| 4 | Rejected-Technical COAL ROAD PTPS PATRATU | - | - | Rejected-Technical Due to not qualified tender PQC |
| Sl No | Description | Qty | Unit | UNIFIED POWER PRIVATE LTD. L2 | U.S.Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Complete external water washing of all floors of Boiler from 8 meter to roof of pent house and internal cleaning of second pass including dust/ash disposal from pant house, dog house and economizer hopper. | 1 | Job | 49,392 ₹49,392 | 43,355 ₹43,355 Lowest |
| 2.00 | Supply and Erection of Cup lock in Ist and 2nd pass scaffolding. Total Duration 35 days | 1 | Job | 26,17,252 ₹26,17,252 | 22,97,455 ₹22,97,455 Lowest |
| 3.00 | High Pressure Jet Cleaning for Pressure part with supply of pump. | 1 | Job | 4,05,255 ₹4,05,255 | 3,55,737 ₹3,55,737 Lowest |
| 4.00 | High Pressure joints of Carbon steel /Low alloy T-11/T-22/T91/TPH 347 HP Joints up to 76.1mm of tube size. | 3,000 | Nos. | 905 ₹27,15,000 | 795 ₹23,85,000 Lowest |
| 5.00 | High Pressure joints of Carbon steel /Low alloy T-11/T-22/T91/TPH 347 HP Joints up to 76.1mm of tube size. | 500 | Nos. | 905 ₹4,52,500 | 795 ₹3,97,500 Lowest |
| 6.00 | Thickness survey of Boiler Pressure Part, 16 Hanger Economizer (lower & upper bank) /16 Hanger of LTSH and other area of boiler pressure part i.e. water wall, SCW, CRH, HRH, FSH, etc as per requirement. | 32 | Nos. | 11,103 ₹3,55,296 | 9,746 ₹3,11,872 Lowest |
| 7.00 | Unit rate of extra metal build up eroded portion of pressure parts tube caused by Ash/Steam erosion using suitable electrode matching with parent metal composition by Arc and Argon Welding where joint is not required (Size:150mmLength x 35mmWidth, Depth of erosion up to 2.5mm). | 400 | Nos. | 308 ₹1,23,200 | 271 ₹1,08,400 Lowest |
| 8.00 | Fin welding work of water wall / steam cool wall. | 750 | RM | 358 ₹2,68,500 | 314 ₹2,35,500 Lowest |
| 9.00 | Installation of SS shielding /cassette baffles in all erosion prone area like in screen water wall, LTSH, Economiser and Extended SCW. | 800 | Nos. | 176 ₹1,40,800 | 154 ₹1,23,200 Lowest |
| 10.00 | DP test of dissimilar joints of Header Tubes (DP Kit shall be in the scope of Contractor). | 500 | Job | 105 ₹52,500 | 93 ₹46,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
26 Nov 2020, 1:00 pmClosed
SE OMC II BTPS PARICHHA
OFFICE OF SE OMC II BTPS PARICHHA
Complete overhauling of Pressure parts of Boiler Supply of scaffolding Jet cleaning of first and second pass of boiler Works of main boiler system Soot Blower Drum internal Pent house Repairing of seal plate of Seal trough etc
2020_RVUNL_528380_1
T-19 BMD-I OMC-II BTPS OH-4 2020-21
Open Tender
Power/Energy Projects/Products
Fixed-rate
365 days
Parichha thermal power plant
PQC of tender
2 documents required · 2 mandatory
₹1,180
DY CAO ACCOUNT PTPP PARICHHA
₹2 L
17 Dec 2020
6 Nov 2020
27 Nov 2020
6 Nov 2020
26 Nov 2020
6 Nov 2020
6 Nov 2020 - 26 Nov 2020
Amount
Complete external water washing of all floors of Boiler from 8 meter to roof of pent house and internal cleaning of second pass including dust/ash disposal from pant house, dog house and economizer hopper.
Supply and Erection of Cup lock in Ist and 2nd pass scaffolding. Total Duration 35 days
High Pressure Jet Cleaning for Pressure part with supply of pump.
High Pressure joints of Carbon steel /Low alloy T-11/T-22/T91/TPH 347 HP Joints up to 76.1mm of tube size.
High Pressure joints of Carbon steel /Low alloy T-11/T-22/T91/TPH 347 HP Joints up to 76.1mm of tube size.
Thickness survey of Boiler Pressure Part, 16 Hanger Economizer (lower & upper bank) /16 Hanger of LTSH and other area of boiler pressure part i.e. water wall, SCW, CRH, HRH, FSH, etc as per requirement.
Unit rate of extra metal build up eroded portion of pressure parts tube caused by Ash/Steam erosion using suitable electrode matching with parent metal composition by Arc and Argon Welding where joint is not required (Size:150mmLength x 35mmWidth, Depth of erosion up to 2.5mm).
Fin welding work of water wall / steam cool wall.
Installation of SS shielding /cassette baffles in all erosion prone area like in screen water wall, LTSH, Economiser and Extended SCW.
DP test of dissimilar joints of Header Tubes (DP Kit shall be in the scope of Contractor).
Repairing of skin casing of first pass & second pass of pent house and complete furnace sealing in pent house and Dog house area. Casting of refractory of penthouse where ever required after alignment/Correction of roof sealing tubes. Disposal of ash of penthouse.
Overhauling of firing system and replacement of coal compartment assemblies including SADC, Gun assembly, Igniters and Scanner guide pipe (Optional work). %Allocation is as follows: a). 10% for overhauling of Igniters, Guns, Scanner guide and SADC. b). 90%for 24 No Burner.
Repairing/Replacement works of wind box expansion bellow and SADC of each corner.
Overhauling of Soot Blower and APH blower.
Complete overhauling of all LRSB, 1Job= 6 Nos. LRSB.
Complete internal overhauling of Boiler Drum.
Servicing of safety valves (Drum, Super heater, HRH, CRH and ERV).
Servicing of MS1 & MS2, Economizer inlet valve, Feed control valves and other various types of valves (250mm to 350mm size valve).
Dismantling and casting of Refractory work in various places inside boiler.
Delay in scaffolding per day in the case of delay from UPRVUNL ends (optional work).
Repairing and reconditioning work of inspection window and man holes.
Repairing of damaged/bulged seal plate of Seal trough of Boiler.
Repairing and reconditioning of horizontal buck stay of Ist and 2nd pass by cutting/dismantling/welding of buck stay link and resetting of horizontal buck stay link with buck stays.
Repairing and reconditioning of vertical buck stay of First and second pass by cutting/dismantling/welding of buck stay link and resetting of vertical buck stay link with buck stays.
Welding of partition plate of burner compartment to wind box support trusses.
Removal of internal partition plate of Re-heater O/L, HRH Header.
Dismantling, Erection (Replacement of Existing Re-heater coil with new one) along with Testing and Commissioning (One job= 01 HRH penal & 01 CRH panel). (Depending upon availability of Re-heater panel)
Servicing/Replacement/Resetting of spring hangers, supports, Anchor and restraints of critical piping and ducts and resetting the spring hangers on cold set values of boiler side as per following scope of work Qty of hangers shall be limited to 60 hangers. Any deviation of addition shall be pro rata basis. (1job=60 hangers).
Providing support Services to RLA technical team.
UNIFIED POWER PRIVATE LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .