Loading…
Loading…
Tender Value
₹98.4 L
EMD Value
₹2.0 L
Closing Date
28 Aug 2026, 9:10 am4d left
DSCO
O/O DSCO, Shaheed Bhagat Singh Nagar at Garhi Kanugoan Balachaur
Runoff Control structure and cratewire structure vill Phirni Mazara Mangupur Dharampur Atal Mazara Paili and Retaining wall of pond Phirni Mazara Atal Mazara
2026_DOA_173298_2
DSWC/SBS/2026-27/07
Open Tender
Civil Works
Percentage
90 days
Phirni Majara Mangupur Atal Mazara Dharampur Paili
Please refer tender documents
2 documents required · 2 mandatory
₹2,500
₹2.0 L
21 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
FINANCIAL BID NO.: DSWC/SBS/2026-27/07
Construction Stone Masonary Run off structure & Crate wire Vill- Phirni Mazara, Crate wire structure Vill- Mangupur, Paili & Dharampur, Stone Masonry Retaining wall for pond at village Phirni Majara , Atal Mazara & Run off contril structure, crate wire & Retaining wall Cum ROC village Atal mazara Tehsil Balachaur , Distt. Shaheed Bhagat Singh Nagar, Punjab
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs. 9839417
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
WORK –1(a)Run off control Structure 1 to 11 Village Phirni Mazara, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 12.23 cum 95.88 Ninety Five Rupees and Eighty Eight
2 C:C 1:8:16 in foundation 2.02 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 10.02 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 9.25 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.75 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 10.8 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 7.29 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
8 Carriage of bajri 0.68 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
9 Carriage of gatka 2 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
10 Carriage of boulder 21.2 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
Total no of Roc 11
WORK – 1(b) Crate Wire Structure no 1,2 Vilage Phirni Mazara, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 23.4 cum 95.88 Ninety Five Rupees and Eighty Eight
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 253.58 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 253.58 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 53.4 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 53.4 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
Total no of Crate Wire 02
WORK – 2 Crate Wire Structure 1-5, Village Mangupur,Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 45 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 362.4 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 362.4 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 92.25 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 92.25 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
Total no of Crate Wire 05
WORK –3 Retaining wall of Pond Village Phirni Mazara Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 62.4 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:6:12 in foundation 9.6 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 52.8 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 82.5 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.9 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 75 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 47 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
8 Carriage of bajri 0.81 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
9 Carriage of gatka 9.6 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
10 Carriage of boulder 148.83 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
11 Dewatering of Pond 1 no 25425 Twenty Five Thousand Four Hundred Twenty Five Rupees only
12 Contingency Charges 1 no 5000 Five Thousands Only
WORK –4 Retaining wall of Pond Village Atal Mazara Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 100.8 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 C:C 1:6:12 in foundation 16.8 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 84 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 138 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 1.8 cum 4929.33 Four Thousand Nine Hundred Twenty Nine Rupees And Thirty Three Paise
6 12.5 mm thick cement plaster 1:4 138 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 78.02 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
8 Carriage of bajri 1.62 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
9 Carriage of gatka 16.8 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
10 Carriage of boulder 244.2 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
11 Dewatering of Pond 1 no 21518 Twenty one Thousand Five Hundred Eighteen Rupees only
WORK – 5 Crate Wire Structure 1 to 8, Village Dharampur,Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 180 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 1562.4 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 1562.4 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 369 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 369 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
6 Contingency charges 1 no 5440 Five Thousand Four Hundred Fourty Rupees only
WORK –6(a) Retaining wall cum ROC Village Atal Mazara, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 43.2 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 7.2 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 36 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 44 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 1 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 48 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 28.46 cum 647.93 Six Hundred Forty Seven Rupees And Ninety three Rupees
8 Carriage of bajri 0.79 cum 647.93 Six Hundred Forty Seven Rupees And Ninety three Rupees
9 Carriage of gatka 7.2 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
10 Carriage of boulder 88 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
WORK – 6(b) Crate Wire Structure no 1 to 4 Vilage Atal Mazara, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 90 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 805.8 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 805.8 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 184.5 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 184.5 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
WORK –6 (c) ROC Village Atal Mazara, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 19.5 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 3.16 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 15.96 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 13.32 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.88 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 28.96 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 11.22 cum 647.93 Six Hundred Forty Seven Rupees And Ninety three Rupees
8 Carriage of bajri 0.79 cum 647.93 Six Hundred Forty Seven Rupees And Ninety three Rupees
9 Carriage of gatka 3.16 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
10 Carriage of boulder 32.21 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
WORK – 7 Crate Wire Structure no 1 to 12 Vilage Paili, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 285 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 2551.7 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 2551.7 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 584.25 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 584.25 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
GRAND TOTAL(1+2+3+4+5+6+7)
1.The quantities indicated above are tentative and may vary. The actual quantities shall be communicated at the time of issuance of the Work Order.
2.The rates of carriage are provisional and may undergo minor variation, subject to the final approval of the estimate by the Competent Authority.
3.The list of works may be modified by way of addition or deletion, depending upon the availability of funds and administrative requirements.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
DNIT07.pdf
Tender Documents • 0.51 MB
Finbid07.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].