Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-Finance | L1 | Accepted-Finance Generally found in order | |
| 2 | L1₹13.4 LAccepted-Finance NO 2 MURAHARI STREET SARATHY NAGAR WEST JONES ROAD WEST SAIDAPET CHENNAI 600015 | CHENNAI | CHENNAI | TAMIL NADU | 600015 | L1 | Accepted-Finance Generally found in order | |
| 3 | L1₹13.4 LAccepted-Finance NO 2 429 VOLTECH ECO TOWER ASIA POWER ELECTRICAL PRIVATE LIMITED MOUNT POONAMALLE ROAD AYYAPPANTHANGAL CHENNAI KANCHIPURAM TAMIL NADU 600056 | THIRUVALLUR | TAMIL NADU | 600056 | L1 | Accepted-Finance Generally found in order | |
| 4 | L1₹13.4 LAccepted-Finance | L1 | Accepted-Finance Generally found in order | |
| 5 | L1₹13.4 LAccepted-Finance | L1 | Accepted-Finance Generally found in order |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
16 Oct 2024, 2:00 pmClosed
Chief Engineer / Tirunelveli
Arignar Anna Building, Tamil Nadu Power Distribution Corporation Ltd, Maharajanagar, Tirunelveli.11
Works Contract for Repairing and reconditioning of 33KV, 8MVA sick Power Transformers available at various locations in Tirunelveli region for a period of two years
2024_EB_483705_2
CE/D/TIN/EE/SCH/WET-01/24-25
Open Tender
Electrical Works
Item Rate
730 days
Tirunelveli
As per Specificatiopn
3 documents required · 3 mandatory
₹0
₹1 L
Yes
6 Nov 2024
1 Oct 2024
17 Oct 2024
1 Oct 2024
16 Oct 2024
1 Oct 2024
Amount
SCHEDULE OF PRICES FOR MATERIALS
HV coil with insulation
LV coil with insulation
Core bolt with insulation
Insulating materials
HV bushings with metal parts - 1000 A
HV bushings with metal parts - 630 A
LV bushings with metal parts - 1000 A
LV bushings with metal parts - 2000 A
Oil Temperature Indicator
Winding Temperature Indicator
Magnetic oil Gauge
Buchholz Relay
Butterfly valve
Neoprene Gasket for 8 MVA
New Transformer Oil
Breather - 1 Kg
Breather - 3 Kg
OLTC epoxy barrier sheet
OLTC transition resistance
Wheel valve - 25 mm
Wheel valve - 40 mm
Wheel valve - 50 mm
Wheel valve - 80 mm
PRV - for main Tank
PRV - for OLTC
33 KV Bushing (Porcelain only)
Surge Relay
Yoke channel/ lamination wherever required
Transformer wheels
Radiators
Contactors
Remote/ Local switches
Heater
Heater switch
Step down transformer 415/110 V
Time Delay Relay
Motor Protection Relay
Tap position indicators
New RTCC panel for 33KV, 8 MVA Power Transformer
Ladder
OLTC operating handle
Motor rewinding
OLTC spares such as gear mechanism, contacts etc.
Marshalling box for OTI & WTI
Relays
Door push button
Test terminal block
M-box door beading
RTCC panel door beading
M-Box door glass for 8 MVA, Power Transformer
M-Box door glass beading for 8 MVA Power Transformer
RTCC panel door handle
Indication light
Push button
Fuse carrier
Thermostat
Emergency push button
RTCC panel base plate
Door lock
Lamp CFL
Lamp holder
DM box door beading
Annunciator - 12 Window
Annunciator - 16 Window
Fuse top
Hooter
SCHEDULE OF PRICES FOR LABOUR CHARGES
Dismantling the accessories and drain the oil upto the required level
Charges for transporting transformer along with accessories from the site to the firm's works
Insurance for transit and storage period at firm’s works
Loading charges at site
Unloading charges at firm's works
Removal of defective coil after dismantling yoke channel and laminations
Charges for detailed examination of transformer towards identification of defects
Replacement of damaged core bolt insulation
Fixing of healthy coil including insulation materials and fixing of lamination & yoke Channel
Bracing, tapping, take off leads of new winding and formation of star connections & fixing frame
Reconditioning of oil
Preliminary drying out of core and winding at hot air chamber
Overhauling of OLTC mechanism & contacts and testing the same
Cleaning of tank, overhauling the radiators including welding charges, conservator, Buchholz Relay test & renewal of gaskets
Core and winding tanking and connecting to tapping leads and fixing metal parts of both HV& LV.
Checking of healthiness of wiring in DM Box, Marshalling box, RTCC panel and Rewiring, if required.
Testing of relay contact at the time of final inspection
Fabrication of pipelines
Top cover fixing and assembly of HV and LV bushings
IR value improvement
Painting of transformer (outside)
Transport of repaired unit and accessories from firm's works to the allotted site
Insurance for transit & 90 days storage at site#
Loading charges at firm's works
Unloading charges of the repaired unit at the allotted site
Re-Insulation of HV coils
Re-Insulation of LV coils
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1164496)
VISHNU ELECTRICALS (BID ID -1163708)
Ascott Electricals Pvt Ltd (BID ID -1163646)
ABIRAMI ENGINEERING (BID ID -1164433)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1163994)
Voltech Manufacturing Company Limited (BID ID -1164829)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .