Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.8 L+₹840.45 (0.05%)Rejected-Finance | ₹16.8 L+₹840.45 (0.05%) | L2 | Rejected-Finance L2 |
Tender Value
₹16.9 L
EMD Value
₹33,900
Closing Date
20 Jun 2026, 12:00 pmClosed
EE
VIKAS BHAWAN VARANASI
Jila Prasikshan gramya vikas santhan varanasi me anurakshan ka karya
2026_REDUP_1150784_1
51 DATE 04-04-2026
Open Tender
Civil Works
Percentage
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,900
Yes
24 Jul 2026
20 May 2026
20 Jun 2026
20 May 2026
20 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of old B.O.E soling Disposal of refuse as including stacking by incharge up direction Asmper site incharge | |||||
| 2Realying of bricks soiling Straight over burnt brick laid flat and dry including preparation of sub grade to prescribed camber and filling joint, with local earth spreading a blinding including all labour T&P as per SI.NO. 762a 2020 INTERLOCKING | |||||
| 3 | Dismantling Brick work or stone work in lime or cement mortar and including stacking of dismolised material as directed by incharge up 60meter to 200 feet S.I.No-692 i/c | 1 | cum | - | - |
| 4 | Dismantling cement concrete or brick or granolithic floor including base concretesurface includind sdisposalof all scrapped material for a distance of within 30m (100') distance as directed by the E/I. I/C Compaction in Layer by Road Roller S.I.No-697 i/c | 1 | sqm | - | - |
| 5Dismantling existing plaster including Disposal of refuse as including stacking by incharge up 60meter to 200 feet direction Asmper site incharge 2020 S.I.No-706 | |||||
| 6 | Excavation cutting for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 1 | cum | 1 | ₹1 |
| 7 | Disposal of waste material up to 3km | 1 | cum | 1 | ₹1 |
| 8Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | |||||
| 9 | Cement concrente with cement, approved coarse sand and 40 mm brick ballast, in propotion 1:6:12including supply of all material, labour, T&P etc required for proper completion of work as per SI NO .273 | 1 | cum | - | - |
| 10 | Class -150 Sub class' A' brick work in 1:4 with cement and approved fine sand of 1.25 F.M. mortor in foundation and upto plinth including supply of all materials, labour and T&P etc compelte as per SI NO .305 | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
sbd.pdf
Tender Documents • 1.16 MB
BOQ_2155117.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .