Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | L1 | Accepted-AOC Lowest |
Tender Value
₹26.4 L
EMD Value
₹52,704
Closing Date
26 Feb 2024, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
The Executive Engineer, Irrigation and Public Health Division, PWD Karaikal
Providing additional gabion box near the left bank of Arasalar in Beach at Karaikal (IV call)
2024_PWDC3_15426_1
35-01/IPH/TN/2023-24
Open Tender
Civil Works - Others
Item Rate
90 days
Karaikal
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹52,704
25 Mar 2024
20 Feb 2024
26 Feb 2024
20 Feb 2024
26 Feb 2024
20 Feb 2024
Amount
Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil
Providing and construction gabian structures for erosion control, river training works and protection works with wire crates of size 2m x 1mx 0.3m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100mm x 100mm, filled with boulders with least dimension of 200mm , all loose ends to be securely tied with 4mm galvanised steel wire.
Collection and supply of stone boulders at Various weights including the charges for conveyance , pre - weighing the loaded vechile and post - weighing the empty vehicle and placing the boulders to the required slope and section by using suitable machinery including handling and packing charges , crane charges etc., complete . The payment will be made based on weight basis. The quantity will be counter checked by way of volumes computed based on pre-levels and post-levels of the section and the volume thus computed will be arrived in weight after reducing for the corresponding voids depending on the size of stone boulders . This rate shall include the costs of formation of approch track for tranportations of materials men and machinery for the placing and dumping the boulders in position for groins / sea protection wall / rock revetment as per sectional drawing and harbouring works also etc., complete. The specific gravity of stone shall be from 2.90 to 3.02.Core after deducting 30% voids. Using 5kg to 100kg
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .