Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.4 LAccepted-AOC GALI NO 12 GURU ANGAD NAGAR KOTKAPURA ROAD SRI MUKTSAR SAHIB | ₹60.4 L | L1 | Accepted-AOC low rate |
| 2 | L2₹65.1 LRejected-Finance | ₹65.1 L | L2 | Rejected-Finance high rate |
| Sl No | Description | Qty | Unit | KOHLI BUILDERS L1 | GURJATINDER SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. upto 1.5 mtr depth | 1 | Cum | 103 ₹103 | 109 ₹109 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 1.5 to 2.25 mtr depth | 1 | Cum | 112 ₹112 | 115 ₹115 |
| 3.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 2.25 to 3.00 mtr depth | 1 | Cum | 122 ₹122 | 125 ₹125 |
| 4.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 3.00 to 4.5 mtr depth | 1 | Cum | 133 ₹133 | 135 ₹135 |
| 5.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 212 ₹212 | 220 ₹220 |
| 6.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 1 | Cum | 6,967 ₹6,967 | 7,000 ₹7,000 |
| 7.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 191 ₹191 | 195 ₹195 |
| 8.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 148 ₹148 | 150 ₹150 |
| 9.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | Cum | 11,096 ₹11,096 | 11,000 ₹11,000 |
| 10.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 6,072 ₹6,072 | 6,000 ₹6,000 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
24 Mar 2026, 12:00 pmClosed
Divisional Engineer
13-A,Canal Colony, Phase-1, Urban Estate, Dugri,Ludhiana-141013.
Lining and Relining of w/c with UGPL pipeline/ Brick-work of Outlet RD 26140 L/R of Manawa Mr. of zira disty Village Chuhar Chak (Laying and Jointing of RCC UGPL System and other allied works in construction of watercourse)
2026_WR_159953_23
PWRMDC/NIT 03 of 2026/DT.11.02.2026
Open Tender
Civil Works
180 days
Moga
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,360
₹2.5 L
Ludhiana
21 May 2026
12 Feb 2026
24 Mar 2026
12 Feb 2026
24 Mar 2026
12 Feb 2026
16 Feb 2026
For works upto 10 lacs
Project in-charge
Work Manager/Site Engineer
Engineering Graduate
Skilled employees
UnSkilled employees
PUNJAB WATER RESOURCE MANAGEMENT & DEVELOPMENT CORPORATION
Name of Constructor/Agency/L & C Society
Name of the Work
For works upto 10 lacs
Truck/Tractor with trolley
Water tanker
Sheep foot roller
JCB / Excavator
Mortar tank
Soaking tank
Cement Concrete Mixer
Vibrators for Concrete
Standard measuring box 1’x 1’x 1 ¼ depth
PUNJAB WATER RESOURCE MANAGEMENT & DEVELOPMENT CORPORATION
Name of the Contractor / L&C Society
Name of the Work
Please fill information about the each relevant work completed during the last Five years for works Costing more than Rs._________________
Name of Employer
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. upto 1.5 mtr depth
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 1.5 to 2.25 mtr depth
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 2.25 to 3.00 mtr depth
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 3.00 to 4.5 mtr depth
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing and cutting of RCC NP-2 plain end pipes 350mm dia with RCC collars and laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect
Lowering, jointing and cutting of RCC NP-2 plain end pipes 400mm dia with RCC collars and laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect
Lowering, jointing and cutting of RCC NP-2 plain end pipes 450mm dia with RCC collars and laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect
Lowering, jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003( @2.5 metre / No) --
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in manholes complete with cement concrete 1:2:4
Providing and fixing of Alfa Alfa Valve 350mm fitted on riser pipe to act as Nakka (D-Regulators)
Providing and fixing of Alfa Alfa Valve 400mm fitted on riser pipe to act as Nakka (D-Regulators)
Providing and fixing of Alfa Alfa Valve 450mm fitted on riser pipe to act as Nakka (D-Regulators)
Centreing &shuttering for Concerte faces
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect (350 mm dia)
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect (400 mm dia)
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect (450 mm dia)
Dismantling of Brick work in cement
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of New Earthwork
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Rehandling of earthwork recently executed
Dag belling single kassi stroke minimum 7.5 cm depth.
Dismantling Brick Work in Cement
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
RCC work hand mixed 1:2:4 for slab including steel reinforcement
Shuttering for faces of Concrete foundations and foundation beam & plinth beam (Vertical or battering)
Fixing of frame
Supplying & Laying Dry Brick Bats
Note : Credit amount, if any will be deducted as per sanctioned estimate.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tendernotice_2.pdf
PDF • 1.49 MB
Tendernotice_3.pdf
PDF • 0.95 MB
tb23.xls
Tender Documents • 0.07 MB
BOQ_324806.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid