Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Below the Estimate Rate |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance Above the Estimate Rate |
| Sl No | Description | Qty | Unit | Vino Construction L2 | P.GOPALAKRISHNAN L1 |
|---|---|---|---|---|---|
| 1.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 444 | M3 | 4,799 ₹21.3 L | 4,785 ₹21.2 L |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 29,559 | M2 | 31 ₹9.2 L | 29.04 ₹8.6 L |
| 3.00 | Providing and laying 50mm compacted thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 235 | M3 | 10,399 ₹24.4 L | 10,388 ₹24.4 L |
| 4.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm and below metal by adding the shredded Plastic 10 % of Bitumen Quantity 3.02 (50.30 x 10 %=5.03 kg ) shredded Plastic waste collected from Municipal Garbage over the aggregate heated to 170 C in central Hot Mix plant mixed well with 47.28 kgs of Hot bitumen VG 30 (160 degree Celius ) 60/70 for Premixing per 10 Sqm to lay 30 mm Compacted thick of Bituminous Concrete including cost of materials and Conveyance of all materials CMP site heating the Bitumen and aggregates to the required temperature and mixing the minimum reqiuired temperature in central hot mix Plant for 20-30tonnes capacity conveyaning the mix tipper trucks to Paver site Spreading the mix required temperature for Uniform thickness of 30 mm width mechanical paver to specfied grades and cross section consolidated by 80 -1100 KN Vibratory rollers/Pneumatic Roller to the required density etc.., including labour for loading bitumen tank and metal to feeder unit labour for attending to paver site etc.,, including hire charges and fuel charges for 20-30 t CMP with bitumen boiler tipper trucks paver finisher /9 m paver finisher vibrate Pneumatic rollers all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications. | 887 | M3 | 10,995 ₹97.5 L | 10,955 ₹97.2 L |
Updated dates
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
28 Jan 2026, 3:00 pmClosed
Commissioner Sathyamangalam Municipality
Commissioner Sathyamangalam Municipality
Improvement of BT road in Sathyamangalam Municipality Package-2
2026_MAWS_642835_1
73/2026/E1-Package-2
Open Tender
Civil Works - Roads
Sathyamangalam Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.8 L
Sathyamangalam Municipal office Sathyamangalam
17 Feb 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
14 Jan 2026
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm compacted thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm and below metal by adding the shredded Plastic 10 % of Bitumen Quantity 3.02 (50.30 x 10 %=5.03 kg ) shredded Plastic waste collected from Municipal Garbage over the aggregate heated to 170 C in central Hot Mix plant mixed well with 47.28 kgs of Hot bitumen VG 30 (160 degree Celius ) 60/70 for Premixing per 10 Sqm to lay 30 mm Compacted thick of Bituminous Concrete including cost of materials and Conveyance of all materials CMP site heating the Bitumen and aggregates to the required temperature and mixing the minimum reqiuired temperature in central hot mix Plant for 20-30tonnes capacity conveyaning the mix tipper trucks to Paver site Spreading the mix required temperature for Uniform thickness of 30 mm width mechanical paver to specfied grades and cross section consolidated by 80 -1100 KN Vibratory rollers/Pneumatic Roller to the required density etc.., including labour for loading bitumen tank and metal to feeder unit labour for attending to paver site etc.,, including hire charges and fuel charges for 20-30 t CMP with bitumen boiler tipper trucks paver finisher /9 m paver finisher vibrate Pneumatic rollers all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_770167.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid