Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | ₹11.8 L | L1 | Accepted-AOC Bid Accepted Hence L1 Bidder |
| 2 | L2₹12.1 LRejected-AOC | ₹12.1 L | L2 | Rejected-AOC Bid Rejected Hence L2 Bidder |
| Sl No | Description | Qty | Unit | Natpavi Associatess L1 | SRI AYEE AMMAN ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road from KM 1/4 of Sivanmalai -Sikkarasampalayam Road to Kathalangadu thottam 0/0-0/3 (R-364) H/O Sivanmalai | 1 | nos | - | - |
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete. | 270 | sqm | 6 ₹1,620 | 10 ₹2,700 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A | 86.4 | cum | 140 ₹12,096 | 150 ₹12,960 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 67.5 | cum | 487.5 ₹32,906.25 | 495 ₹33,412.50 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 175.69 | cum | 2,549 ₹4.5 L | 2,560 ₹4.5 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,171.25 | sqm | 87.5 ₹1.0 L | 95 ₹1.1 L |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it include | 1,171.25 | sqm | 20.5 ₹24,010.62 | 25 ₹29,281.25 |
| 8.00 | Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site | 1,171.25 | cum | 320.3 ₹3.8 L | 325 ₹3.8 L |
| 9.00 | Name board charges | 1 | nos | 5,000 ₹5,000 | 5,000 ₹5,000 |
| 10.00 | Photographic charges | 1 | nos | 1,000 ₹1,000 | 1,000 ₹1,000 |
Tender Value
₹11.9 L
EMD Value
₹11,930
Closing Date
26 Feb 2026, 3:00 pmClosed
Block development officer (VP), Kangayam
Block development officer (VP), Kangayam
Tiruppur district, Kangayam block, , Strengthening the road From KM 1/4 of Sivanmalai Sikkarasampalayam road- Kathathalan thottam 0/0-0/3 H/O Sivanamalai (R-364)-Mines and Minerals 2025-26
2026_RDTN_665856_2
ROC NO.2836/2024/A2 dt.18.02.2026
Open Tender
Civil Works - Roads
Block development office (VP), Kangayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,930
Yes
Block development office (VP), Kangayam
5 Mar 2026
24 Feb 2026
26 Feb 2026
24 Feb 2026
26 Feb 2026
24 Feb 2026
25 Feb 2026
Strengthening the road from KM 1/4 of Sivanmalai -Sikkarasampalayam Road to Kathalangadu thottam 0/0-0/3 (R-364) H/O Sivanmalai
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it include
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site
Name board charges
Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.86 MB
tb.pdf
Tender Documents • 0.84 MB
BOQ_799851.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid